Search NASA⌕ Search

Engineering topics

Crawford, Curran

Publications and source records attributed to Crawford, Curran.

Techno-economic comparison of electrification for heavy-duty trucks in China by 2040

We show that electrification of heavy-duty trucks (HDTs) is critical of achieving sustainability and carbon neutrality in road freight. Based on the total cost of ownership and the life-cycle emissions, the study compared the traditional diesel internal combustion engine vehicle technologies with potential electrification options for HDTs in China, including battery electric vehicle, plug-in hybrid electric vehicle, hydrogen fuel cell vehicle, and battery electric catenary vehicle. Scenario and sensitivity analysis were explored the life-cycle effects of these electrification options in China from 2020 to 2040. It is found that green electricity and green hydrogen are the most important factors influencing the life-cycle emissions of CO 2 , NO X , and PM 2.5 for different HDTs’ electrification options. The plug-in hybrid electric vehicle of HDTs has shown good performance in terms of total cost and carbon emissions, mainly due to the reduced battery capacity and the current grid mix in China.

33 ADVANCED PROPULSION SYSTEMS↗

Transactive control of fast-acting demand response based on thermostatic loads in real-time retail electricity markets

Coordinated operation of distributed thermostatic loads such as heat pumps and air conditioners can reduce energy costs and prevents grid congestion, while maintaining room temperatures in the comfort range set by consumers. This paper furthers efforts towards enabling thermostatically controlled loads (TCLs) to participate in real-time retail electricity markets under a transactive control paradigm. An agent-based approach is used to develop an effective and low complexity demand response control scheme for TCLs. The proposed scheme adjusts aggregated thermostatic loads according to real-time grid conditions under both heating and cooling modes. Here, a case study is presented showing the method reduces consumer electricity costs by over 10% compared to uncoordinated operation.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Interconnection-wide hour-ahead scheduling in the presence of intermittent renewables and demand response: A surplus maximizing approach

This study describes a new approach for solving the multi-area electricity resource allocation problem when considering both intermittent renewables and demand response. The method determines the hourly inter-area export/import set that maximizes the interconnection (global) surplus satisfying transmission, generation and load constraints. The optimal inter-area transfer set effectively makes the electricity price uniform over the interconnection apart from constrained areas, which overall increases the consumer surplus more than it decreases the producer surplus. The method is computationally efficient and suitable for use in simulations that depend on optimal scheduling models. The method is demonstrated on a system that represents North America Western Interconnection for the planning year of 2024. Simulation results indicate that effective use of interties reduces the system operation cost substantially. Excluding demand response, both the unconstrained and the constrained scheduling solutions decrease the global production cost (and equivalently increase the global economic surplus) by 12.30B and 10.67B per year, respectively, when compared to the standalone case in which each control area relies only on its local supply resources. This cost saving is equal to 25% and 22% of the annual production cost. Including 5% demand response, the constrained solution decreases the annual production cost by 10.70B, while increases the annual surplus by 9.32B in comparison to the standalone case.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Renewable Energy Resources Portfolio Optimization in the Presence of Demand Response

In this paper we introduce a simple cost model of renewable integration and demand response that can be used to determine the optimal mix of generation and demand response resources. The model includes production cost, demand elasticity, uncertainty costs, capacity expansion costs, retirement and mothballing costs, and wind variability impacts to determine the hourly cost and revenue of electricity delivery. The model is tested on the 2024 planning case for British Columbia and we find that cost is minimized with about 31% renewable generation. We also find that demand responsive does not have a significant impact on cost at the hourly level. The results suggest that the optimal level of renewable resource is not sensitive to a carbon tax or demand elasticity, but it is highly sensitive to the renewable resource installation cost.

Behboodi, Sahand↗