Search NASA⌕ Search

Engineering topics

Creus-Prats, J.

Publications and source records attributed to Creus-Prats, J..

PIP-II cryoplant non thermal cycling updates

The Proton Improvement Plan-II (PIP-II) is a crucial upgrade to the Fermilab accelerator complex, featuring a new 800-MeV Superconducting Radio-Frequency (SRF) linear accelerator (LINAC) with 23 cryomodules operating at 2 K. The LINAC thermohydraulic conditions are satisfied by the cryogenic subsystems: Cryogenic Distribution System (CDS), a helium refrigerator cold box (CB), a warm compression station (WCS) and a helium recovery system (RSYS). The accelerator has a strict requirement of non-thermal cycling of the LINAC cryomodules during planned and unplanned subsystem outages. This paper presents an integrated reliability analysis of the PIPII cryoplant. The study evaluates both normal and abnormal operating modes, with a focus on identifying integrated scenarios that put subsystems components under stress. The conclusions of this study will help build redundancy to mitigate LINAC thermal cycling risks during planned and unplanned subsystem outages.

43 PARTICLE ACCELERATORS↗

PIPII cryoplant non thermal cycling updates

The Proton Improvement Plan-II (PIP-II) is a crucial upgrade to the Fermilab accelerator complex, featuring a new 800-MeV Superconducting Radio-Frequency (SRF) linear accelerator (LINAC) with 23 cryomodules operating at 2K. The LINAC thermohydraulic conditions are satisfied by the cryogenic subsystems: Cryogenic Distribution System (CDS), a helium refrigerator cold box (CB), a warm compression station (WCS) and a helium recovery system (RSYS). The accelerator has a strict requirement of non-thermal cycling of the LINAC cryomodules during planned and unplanned subsystem outages. This paper presents an integrated operating modes analysis of the of the LINAC/CDS thermohydraulic loads satisfied by the CB/WCS cooling system supported by the RSYS inventory management system. The study is based on latest cryoplant and CDS engineering deliverables, as well as the recent performance data from single cryomodule qualification tests performed at the Fermilab PIP-II Injector Test test s tand. The study evaluates both normal and abnormal operating modes, with a focus on identifying integrated scenarios that put subsystems components under stress. The conclusions of this study will help build redundancy to reduce the risk of thermal cycles during planned and unplanned subsystem outages.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Preliminary design of a helium cryogenic system for SAND detector at LBNF-DUNE near site

The Long-Baseline Neutrino Facility (LBNF) is providing a helium cryogenic system to support the superconducting solenoid magnet of the System for on-Axis Neutrino Detection (SAND) for the Deep Underground Neutrino Experiment (DUNE) Near Site at Fermilab in Batavia, IL. The design started in 2020 and construction is set to begin in the mid 2020‘s.The helium cryogenic system primarily consists of a helium refrigerator system, distribution valve boxes, vacuum-jacketed helium and nitrogen transfer lines, warm gaseous helium transfer system, instruments and control system, and gaseous helium storage tanks. It is designed to provide supercritical helium at around 3 bara and 5 K with expansion from 3 to 1.2 bara in the SAND cryostat and 70K forced cold gas helium to cool the thermal shields of the SAND cryostat. The SAND superconductive magnet is indirectly cooled through a liquid helium thermosiphon cycle. A pair of 3 kA leads is cooled by the gas helium vaporized from the liquid helium reservoir in the cryostat turret. The helium system will share the liquid nitrogen tank and liquid nitrogen phase separator with the Near Site Liquid Argon system. The helium recycle compressor system, GHe tanks and LN2 tank will be located on the Surface. The cryogenic facilities including refrigerator cold box, valve boxes and LN2 phase separator will be located on the shaft cryo-mezzanine in the underground cavern. The shaft connecting surface and cavern is more than 60 meter deep. The helium vacuum-jacketed transfer line between the cold box and the SAND magnet is more than 50 meter long. This paper presents the preliminary design of the helium cryogenic system including the design scheme, process flow diagram, heat load estimates, layout plan and so on.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Operational experience with the Proto-DUNE NP02 and NP04 large volume liquid argon cryostats and their cryogenic systems at CERN

The far Detector of the Deep Underground Neutrino Experiment (DUNE) will be housed in several large volume (about 12.500 m$^{3}$) liquid argon cryostats. The design principle of these large cryostats, and of the cryogenic system belonging to them, are investigated through the design, construction and operation of a series of prototype installations.The Neutrino Platform 02 (NP02) and 04 (NP04) cryostats, placed at CERN, contain DUNE proto-type detectors, each of them housed in an about 600 m$^{3}$ liquid argon bath. These cryostats, based on the membrane cryostat principle, and their cryogenic systems have been designed according to the DUNE principle. Measurements performed in these test stands shall confirm the foreseen heat loads into the cryostat systems entering via its walls, via detector cabling and via the cold electronics, shall confirm the low temperature gradient over the active detector volume and shall certify the liquid argon purification principle.This paper introduces the requirements for the NP02 and NP04 cryostats and their cryogenic systems, describes the design principle applied to these two systems and gives an overview of the different modes in which the two systems have been operating. The experimental results are presented and discussed, and “lessons learned” for future installations are dawn.

43 PARTICLE ACCELERATORS↗