STATUS OF NEW 2.5 MEV TEST FACILITY AT SNS

A new 2.5MeV beam test facility is being built at SNS. It consists of a 65 keV H- ion source, a 2.5MeV RFQ, a beam line with various beam diagnostics and a 6 kW beam dump. The facility is capable of producing one-ms-long pulses at 60Hz repetition rate with up to 50mA peak current. The commissioning with reduced average beam power is planned for fall 2014 to verify operation of all systems. The full power operation is scheduled to begin in 2015. The status of the facility will be presented as well as a discussion of the future R&D program.

Aleksandrov, Alexander V↗

RF Distribution System for High Power Test of the SNS Cryomodule

A four-way waveguide RF power distribution system for testing the Spallation Neutron Source (SNS) multi-cavity cryomodule to investigate the collective behavior has been developed. A single klystron operating at 805MHz for 1.3 msec at 60Hz powers the 4-way waveguide splitter to deliver up to 400 kW to individual cavities. Each cavity is fed through a combination of waveguide splitters and vector modulators (VM) to provide independent magnitude and phase controls. The waveguide vector modulator consists of two quadrature hybrids and two motorized waveguide phase shifters. The phase shifters and the assembled waveguide vector modulators were individually tested and characterized for low power and high RF power in the SNS RF test facility. Precise calibrations of magnitude and phase were performed to generate the look up tables (LUTs) to provide operational references during the cryomodule test. An I-Q demodulator module was developed and utilized to measure relative phases in pulsed high RF power operation. PLC units were developed for mechanical control of the phase shifters. Initial low/high power measurements were made using LabVIEW. An operation algorithm has been implemented into EPICS control for the cryomodule test stand.

43 PARTICLE ACCELERATORS↗

STATUS OF SRF FACILITIES AT SNS

The Spallation Neutron Source (SNS) has recognized the need for developing in-house capability to ensure long term sustainability of the superconducting linac (SCL). SNS has made substantial gains in the last 6 years in understanding SCL operation, including system and equipment limiting factors, and resolution of system and equipment issues. Significant effort and focus is required to assure on-going success in the operation, maintenance, and improvement of the SCL and to address the requirements of the upgrade project for the Second Target Station. These interdependent efforts include implementation of demonstrated improvements, fabrication of spare cryomodules, cavity R&D to enhance machine performance, and related SRF facility developments. Cryomodule and vertical cavity testing facilities are being developed to demonstrate process capabilities and to further understand the collective limitations of installed cavities. The status and future plans for SRF facilities at SNS will be presented.

Kim, Sang-Ho↗

Plans for an Integrated Front-End Test Stand at the Spallation Neutron Source

A spare Radio-Frequency Quadrupole (RFQ) is presently being fabricated by industry with delivery to Oak Ridge National Laboratory planned in late 2012. The establishment of a test stand at the Spallation Neutron Source site is underway so that complete acceptance testing can be performed during the winter of 2012-2013. This activity is the first step in the establishment of an integrated front-end test stand that will include an ion source, low-energy beam transport (LEBT), RFQ, medium-energy beam transport, diagnostics, and a beam dump. The test stand will be capable of delivering an H- ion beam of up to 50 mA with a pulse length of 1 ms and a repetition rate of 60 Hz or a proton beam of up to 50 mA, 100us, 1Hz. The test stand will enable the following activities: complete ion source characterization; development of a magnetic LEBT chopper; development of a two-source layout; development of beam diagnostics; and study of beam dynamics of high intensity beam.

Champion, Mark S↗

STATUS OF THE OAK RIDGE SPALLATION NEUTRON SOURCE (SNS) RF SYSTEMS *

The SNS has been delivering production neutrons for five years with first beam delivered to the neutron target at the end of April 2006. On September 18, 2009 SNS officially reached 1 megawatt of beam on target marking the achievement of a decades-old dream of providing a U.S. megawatt class pulsed spallation source. The SNS is now routinely delivering 1 megawatt of beam power to the neutron target at over 85 percent of the scheduled beam time. The present effort is aimed at increasing availability eventually to 95 percent and gradually increasing the intensity to the 1.4 megawatt design level. While the RF systems have performed well since initial installation some improvements have been implemented. This paper provides a review of the SNS RF Systems, an overview of the performance of the various components and a detailed review of RF related issues addressed over the past several years.

Crofford, Mark T↗

HIGH POWER RF DISTRIBUTION AND CONTROL FOR MULTI-CAVITY CRYOMODULE TESTING

Qualification of the superconducting radio-frequency (SRF) cavities in the cryomodules for the accelerating performance needs to be done through high power processing. A four-way waveguide power distribution system with independent control of power outputs has been being developed for testing the multi-cavity cryomodules for the SNS linac. SNS is employing two types of cryomodules: one type with three medium beta six-cell cavities and the other with four high beta six-cell cavities. The cryomodule that is being manufactured as a spare and the new crymodules for the future power upgrade project (PUP) of SNS will be high beta types. The four-way power distribution with independently controlled power outputs was considered useful for powering all cavities at the same time with a klystron amplifier since the SNS test facility was configured for a single klystron operation. Since certain interaction between the cavities under severe field emission was suspected in existing cryomodules, this type of high power test can be valuable for characterization of SRF cavities. By implementing a vector modulator at each arm of the splitting system, the amplitudes and the phases of RF outputs can be controlled independently. This paper discusses the present status of the development.

Cryomodule↗

Stabilized operation of the improvement of the Spallation Neutron Source (SNS) radio-frequency quadrupole (RFQ)

The Spallation Neutron Source (SNS) radio-frequency quadrupole (RFQ) had resonance control instabilities at duty factors higher than approximately four percent. Systematic investigations have been carried out to understand the cause of the instability and to ensure the operational stability of the RFQ. The most critical source of the instability is revealed to be an interaction between hydrogen released by beam bombardments and the RFQ RF field resulting in a discharge, which consumes additional RF power and could cause the RFQ to operate in an unstable region. This paper reports improvement of the SNS RFQ operational stability based on the findings during the SNS operation.

08 HYDROGEN↗

SPALLATION NEUTRON SOURCE HIGH-POWER PROTECTION MODULE TEST STAND

The Spallation Neutron Source (SNS) High-Power Protection Module (HPM) provides interlocks and fast shutdown for the radio frequency (RF) system to protect the accelerating structures and high power RF (HPRF) Distribution System. The HPM has required some functional upgrades since the start of beam operations and an upgrade to the HPM test stand was required to support these added features. The HPM test stand currently verifies functionality, RF channel calibration, and measurement of the speed of shutdown to ensure the specifications are met. The upgraded test stand was implemented in a Field Programmable Gate Array (FPGA) to allow for future growth and flexibility. Work is currently progressing on automation of the test stand to better perform the required module calibration schedule.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗