"Making Safety Happen" Through Probabilistic Risk Assessment at NASA

NASA is using Probabilistic Risk Assessment (PRA) as one of the tools in its Safety & Mission Assurance (S&MA) tool belt to identify and quantify risks associated with human spaceflight. This paper discusses some of the challenges and benefits associated with developing and using PRA for NASA human space programs. Some programs have entered operation prior to developing a PRA, while some have implemented PRA from the start of the program. It has been observed that the earlier a design change is made in the concept or design phase, the less impact it has on cost and schedule. Not finding risks until the operation phase yields much costlier design changes and major delays, which can result in discussions of just accepting the risk. Risk contributors identified by PRA are not just associated with hardware failures. They include but are not limited to crew fatality due to medical causes, the environment the vehicle and crew are exposed to, the software being used, and the reliability of the crew performing required actions. Some programs have entered operation prior to developing a PRA, and while PRA can still provide a benefit for operations and future design trades, the benefit of implementing PRA from the start of the program provides the added benefit of informing design and reducing risk early in program development. Currently, NASA’s International Space Station (ISS) program is in its 20th year of on-orbit operations around the Earth and has several new programs in the design phase preparing to enter the operation phase all of which have active (or living) PRAs. These programs incorporate PRA as part of their Risk-Informed, Decision-Making (RIDM) process. For new NASA human spaceflight programs discussion begins with mission concept, establishing requirements, forming the PRA team, and continues through the design cycles into the operational phase. Several examples of PRA related applications and observed lessons are included.

Applications↗

NASA Perspective on Leading Indicators and Dashboarding

To convey information about NASA shares information to programs, projects, Centers on the status of certain activities/requirements via dashboards. in addition, how we use leading indicators to anticipate and mitigate problems prior to an accident.

leading indicators↗

Modeling the Risk of U.S. Offshore Oil & Gas Exploration-Well Drilling, Commercial Nuclear Plants, and Human Spaceflight

Probabilistic Risk Assessment (PRA) has been applied in different industries for many years. Each industry and technology area presents varying challenges and priorities, and the risk models therefore need to be somewhat different. This paper compares aspects of risk modeling of offshore drilling, nuclear plant operation, and human spaceflight. Risk models in all three technology areas have certain high-level similarities: (1) they employ redundancy and diversity in their means to prevent or mitigate risk, including a mix of active and passive systems designed to respond to off-normal evolutions; (2) they are affected by human reliability; (3) their models require consideration of coupling between scenario structure and scenario phenomenology. But in examining the models in more detail, one sees important differences in methodology and emphasis. For purposes of comparison, this paper discusses aspects of a risk model of an offshore drilling operation in the U.S. Gulf of Mexico, focusing on where such a development differs in important ways from models of commercial U.S. nuclear plants and models developed for human spaceflight.

Boyer, Roger L.↗

Synthesizing a New Launch Vehicle Failure Probability Based on Historical Flight Data

New launch vehicles have historically had significantly higher failure rates in early flights than what has been predicted using Probabilistic Risk Assessment - PRA. This is because PRAs typically model a mature vehicle where a significant portion of the early failure probability contributors have been eliminated due to testing and improvements after actual field operation. To capture a more accurate early flight failure probability estimate, this paper develops a method that estimates ascent failure probability starting with the first flight based on historical launch vehicle records. With new launch vehicles being developed, such as the Space Launch System - SLS, a PRA model must be extended to cover early flight failure probability contributions that are either not covered in the mature-vehicle PRA or are underestimated. These failure probability contributions include design errors, quality control deficiencies, installation errors, and environmental impacts. There are also failure dependencies due to systemic errors that still exist due to limited entire-system testing.

Cross, Robert B.↗

Ares I-X First Flight Loss of Vehicle Probability Analysis

As part of the Constellation (Cx) Program development effort, several test flights were planned to prove concepts and operational capabilities of the new vehicles being developed. The first test, involving the Eastern Test Range, is the Ares I-X launched in 2009. As part of this test, the risk to the general public was addressed to ensure it is within Air Force requirements. This paper describes the methodology used to develop first flight estimates of overall loss of vehicle (LOV) failure probability, specifically for the Ares I-X. The method described in this report starts with the Air Force s generic failure probability estimate for first flight and adjusts the value based on the complexity of the vehicle as compared to the complexity of a generic vehicle. The results estimate a 1 in 9 probability of failure. The paper also describes traditional PRA methods used in this assessment, which were then combined with the updated first flight risk methodology to generate inputs required by the malfunction turn analysis to support estimate of casualty (Ec) calculations as part of the Final Flight Data Package (FFDP) delivered to the Eastern Range for Final Flight Plan Approval.

Bigler, Mark A.↗