Search NASA⌕ Search

Engineering topics

Crouse, Patrick

Publications and source records attributed to Crouse, Patrick.

Reducing Development and Operations Costs using NASA's "GMSEC" Systems Architecture

This viewgraph presentation reviews the role of Goddard Mission Services Evolution Center (GMSEC) in reducing development and operation costs in handling the massive data from NASA missions. The goals of GMSEC systems architecture development are to (1) Simplify integration and development, (2)Facilitate technology infusion over time, (3) Support evolving operational concepts, and (4) All for mix of heritage, COTS and new components. First 3 missions (i.e., Tropical Rainforest Measuring Mission (TRMM), Small Explorer (SMEX) missions - SWAS, TRACE, SAMPEX, and ST5 3-Satellite Constellation System) each selected a different telemetry and command system. These results show that GMSEC's message-bus component-based framework architecture is well proven and provides significant benefits over traditional flight and ground data system designs. The missions benefit through increased set of product options, enhanced automation, lower cost and new mission-enabling operations concept options .

Smith, Dan↗

Integrating Automation into a Multi-Mission Operations Center

NASA Goddard Space Flight Center's Space Science Mission Operations (SSMO) Project is currently tackling the challenge of minimizing ground operations costs for multiple satellites that have surpassed their prime mission phase and are well into extended mission. These missions are being reengineered into a multi-mission operations center built around modern information technologies and a common ground system infrastructure. The effort began with the integration of four SMEX missions into a similar architecture that provides command and control capabilities and demonstrates fleet automation and control concepts as a pathfinder for additional mission integrations. The reengineered ground system, called the Multi-Mission Operations Center (MMOC), is now undergoing a transformation to support other SSMO missions, which include SOHO, Wind, and ACE. This paper presents the automation principles and lessons learned to date for integrating automation into an existing operations environment for multiple satellites.

Surka, Derek M.↗

Attitude Drift Analysis for the WIND and POLAR Missions

The spin axis attitude drift due to environmental torques acting on the Global Geospace Science (GGS) Interplanetary Physics Laboratory (WIND) and the Polar Plasma Laboratory (POLAR) and the subsequent impact on the maneuver planning strategy for each mission is investigated. A brief overview of each mission is presented, including mission objectives, requirements, constraints, and spacecraft design. The environmental torques that act on the spacecraft and the relative importance of each is addressed. Analysis results are presented that provide the basis for recommendations made pre-launch to target the spin axis attitude to minimize attitude trim maneuvers for both spacecraft over their respective mission lives. It is demonstrated that attitude drift is not the dominant factor in maintaining the pointing requirement for each spacecraft. Further it is demonstrated that the WIND pointing cannot be met pas 4 months due to the Sun angle constraint, while the POLAR initial attitude can be chosen such that attitude trim maneuvers are not required during each 6 month viewing period.

Crouse, Patrick↗

The effect of high lift to drag ratio on aerobraking

This work reviews the use of aerodynamic forces to modify the velocity, and therefore, the orbital path of vehicles due to transit through planetary atmospheres, especially when high values of lift can be generated. The concepts of aerobraking and aerocapture are examined, and the limiting factors are discussed. The use of high L/D vehicles, such as hypersonic waveriders, is examined, and the advantages and disadvantages of their use for aerocapture are addressed. This preliminary study of non-optimized aerocapture trajectories suggests that entrance velocities at Mars can be 10 - 12 km/sec for a waverider while sustaining acceptable loads of about 3 - 4 Earth G's over a 3 minute period, diminishing to less than 1 G in about 15 minutes. The entrance velocities are greater than those for a more conventional biconic configuration with similar deceleration loads sustained. The convective heating rate on the waverider, increased due to the higher velocities and sharp leading edges, has an estimated upper bound of 14000 W/sq cm and a corresponding temperature of about 7500 degrees K.

Crouse, Patrick↗

Terrapin technologies manned Mars mission proposal

A Manned Mars Mission (M3) design study is proposed. The purpose of M3 is to transport 10 personnel and a habitat with all required support systems and supplies from low Earth orbit (LEO) to the surface of Mars and, after an eight-man surface expedition of 3 months, to return the personnel safely to LEO. The proposed hardware design is based on systems and components of demonstrated high capability and reliability. The mission design builds on past mission experience, but incorporates innovative design approaches to achieve mission priorities. Those priorities, in decreasing order of importance, are safety, reliability, minimum personnel transfer time, minimum weight, and minimum cost. The design demonstrates the feasibility and flexibility of a Waverider transfer module.

Amato, Michael↗