Search NASASearch

Engineering topics

Cummings, T. [Fermilab]

Publications and source records attributed to Cummings, T. [Fermilab].

Magnetic Measurements of Fermilab Rapid-Cycling Booster Gradient Magnets

Fermilab is upgrading its Booster synchrotron to increase ramp rate and intensity. This is part of the Proton Improvement Plan (PIP-II) that will allow the Main Injector to achieve proton beam power of 1.2 MW within the next few years. This upgrade includes running the 55-year-old Booster magnets at 20 Hz instead of the usual 15 Hz, and construction of some shorter and wider aperture versions of these combined-function gradient magnets. Magnetic measurements were performed to characterize the present 15 Hz AC performance, and then again with 20 Hz ramp cycle to ensure performance and compatibility in this new operating regime. A 3 m-long curved flat-coil was developed for these measurements using Printed Circuit Board (PCB) technology. The probe also has a separate 0.5 m-long body-field probe, allowing integral, body, and end fields to be measured across 100 mm of the magnet aperture. The sampling rate for these measurements during the AC cycle was 200 kHz, and field resolution was better than 0.01%. Details of the probe, measurements, and results are presented.

DiMarco, J. [Fermilab] (ORCID:0000000228400036)

Current Progress on the High-Field Cable Testing Facility at Fermilab

Fermi National Accelerator Laboratory (Fermilab) is constructing a new High Field Vertical Magnet Test Facility (HFVMTF) with capabilities comparable to the European facilities EDIPO and FRESCA2. The facility, located at Fermilab, will feature a background magnetic field of 15 T, generated by a magnet provided by Lawrence Berkeley National Laboratory (LBNL). The HFVMTF will support two U.S. national programs under the DOE Office of Science: the U.S. Fusion Energy Science (FES) program and the Magnet Development Program (MDP). It will enable the testing of HTS samples in high magnetic fields across a wide range of temperatures and facilitate the development of hybrid magnets combining LTS and HTS superconductors. This paper presents an overview of the current progress in constructing the facility, including updates on the test cryostat, power supplies, and systems for quench protection and monitoring.

Velev, G. [Fermilab]