Review of Exploration Systems Development (ESD) Integrated Hazard Development Process: Appendices - Volume 1

The Chief Engineer of the Exploration Systems Development (ESD) Office requested that the NASA Engineering and Safety Center (NESC) perform an independent assessment of the ESD's integrated hazard development process. The focus of the assessment was to review the integrated hazard analysis (IHA) process and identify any gaps/improvements in the process (e.g., missed causes, cause tree completeness, missed hazards). This document contains the outcome of the NESC assessment.

Smiles, Michael D.↗

Review of Exploration Systems Development (ESD) Integrated Hazard Development Process: Volume 2 - Appendices

The Chief Engineer of the Exploration Systems Development (ESD) Office requested that the NASA Engineering and Safety Center (NESC) perform an independent assessment of the ESD's integrated hazard development process. The focus of the assessment was to review the integrated hazard analysis (IHA) process and identify any gaps/improvements in the process (e.g. missed causes, cause tree completeness, missed hazards). This document contains the outcome of the NESC assessment.

Smiles, Michael D.↗

Review of the Constellation Level II Safety, Reliability, and Quality Assurance (SR&QA) Requirements Documents during Participation in the Constellation Level II SR&QA Forum

At the request of the Exploration Systems Mission Directorate (ESMD) and the Constellation Program (CxP) Safety, Reliability; and Quality Assurance (SR&QA) Requirements Director, the NASA Engineering and Safety Center (NESC) participated in the Cx SR&QA Requirements forum. The Requirements Forum was held June 24-26; 2008, at GRC's Plum Brook Facility. The forums purpose was to gather all stakeholders into a focused meeting to help complete the process of refining the CxP to refine its Level II SR&QA requirements or defining project-specific requirements tailoring. Element prime contractors had raised specific questions about the wording and intent of many requirements in areas they felt were driving costs without adding commensurate value. NESC was asked to provide an independent and thorough review of requirements that contractors believed were driving Program costs, by active participation in the forum. This document contains information from the forum.

Cameron, Kenneth D.↗

Command and Telemetry Latency Effects on Operator Performance during International Space Station Robotics Operations

International Space Station (ISS) operations will require the on-board crew to perform numerous robotic-assisted assembly, maintenance, and inspection activities. Current estimates for some robotically performed maintenance timelines are disproportionate and potentially exceed crew availability and duty times. Ground-based control of the ISS robotic manipulators, specifically the Special Purpose Dexterous Manipulator (SPDM), is being examined as one potential solution to alleviate the excessive amounts of crew time required for extravehicular robotic maintenance and inspection tasks.

Currie, Nancy J.↗