Environmental requirements management: Maintaining an effective compliance program is key to a robust environmental management system - 15184

CH2M HILL Plateau Remediation Company (CH2M HILL) is the U.S. Department of Energy (DOE) prime contractor responsible for the environmental cleanup of the Hanford Site Central Plateau. As part of this responsibility, the CH2M HILL is faced with the task of complying with thousands of environmental requirements which originate from over 200 federal, state, and local laws and regulations, DOE Orders, waste management and effluent discharge permits, Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) response and Resource Conservation and Recovery Act (RCRA) corrective action documents, and official regulatory agency correspondence. The challenge is to manage this vast number of requirements to ensure they are appropriately and effectively integrated into CH2M HILL operations. Ensuring compliance with a large number of environmental requirements relies on an organisation's ability to identify, evaluate, communicate, and verify those requirements. To ensure that compliance is maintained, all changes need to be tracked. The CH2M HILL identified that the existing system used to manage environmental requirements was difficult to maintain and that improvements should be made to increase functionality. CH2M HILL established an environmental requirements management procedure and tools to assure that all environmental requirements are effectively and efficiently managed. Having a complete and accurate set of environmental requirements applicable to CH2M HILL operations will promote a more efficient approach to: - Communicating requirements- Planning work - Maintaining work controls - Maintaining compliance. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Central plateau remediation optimization study

The Central Plateau is a 195-km2 (75 mi 2 ) area located in the center of the 1,517 km2 (586 mi 2 ) Hanford Site in south central Washington State (Figure ES-1). The Hanford Site was established in 1943 and was originally designed, built, and operated to produce plutonium for nuclear weapons. During World War II, plutonium production reactors were constructed along the Columbia River. Separations facilities (canyon buildings) were constructed in the Central Plateau to chemically extract plutonium from irradiated fuel. While plutonium production continued at the Hanford Site through the 1980s, additional mission activities, such as energy research/development and isotope separation, began in the 1950s. The Hanford Site mission, managed by the US Department of Energy (DOE) is now focused on treatment of wastes generated during past operations, and the cleanup of excess facilities and environmental contamination to mitigate impacts to human health and the environment. On the Central Plateau, there are hundreds of currently active and excess facilities and more than 1,000 soil waste sites and pipelines that will require remediation as part of final cleanup.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗