Search NASASearch

Engineering topics

Cyr, Kelley J.

Publications and source records attributed to Cyr, Kelley J..

The role of cost analysis in manned spacecraft development

This paper describes the methods used by NASA for finding the 'best' design approach for meeting the objectives of space exploration. Models of the design process and the role that cost analysis plays in the process are described. The state-of-the-art of cost estimating is discussed, and a cost model designed for the exploration initiative is presented. The Space Exploration Initiative is discussed, and a cost estimate presented.

Cyr, Kelley J.

Budget availability

A forecast of the total NASA budget required to achieve a manned mission to Mars at around the end of this century is described. A methodology is presented for projecting the major components of the NASA budget, including the NASA base, space flight, space station, Shuttle Derived Launch Vehicle, and the Manned Mars Mission. The NASA base, including administrative expenses, construction of facilities and research and development other than manned flight, is assumed to level off at the present (1985) level and remain constant at approximately $3.5 billion (constant fiscal year 1985 dollars). The budget for space flight, which consists of Shuttle research and development, operations, and tracking and data acquisition costs, is projected to decrease from approximately $4 billion in 1985 to just under $2.5 billion by 1989 and then level off. Planning profiles for three major programs are constructed: a permanently manned space station; a Shuttle Derived Vehicle; and a Manned Mars Mission. It is concluded that all of the programs can be conducted by the year 2002 with a 3 percent real growth rate in the NASA budget.

Cyr, Kelley J.