Search NASA⌕ Search

Engineering topics

Dale, Gregory E.

Publications and source records attributed to Dale, Gregory E..

At least 19 records

A new method for quantifying 64 Cu in nuclear debris samples

Quantifying 64 Cu in post-detonation nuclear debris samples can provide important diagnostic information regarding the structural materials used within a nuclear device. However, this task is challenging due to the weak gamma emissions associated with the decay of 64 Cu, its short half-life (12.701 h), and the presence of interfering fission product radioisotopes. Large quantities of debris sample are generally needed to accurately quantify 64 Cu, which can be problematic in sample-limited scenarios where other radiometric analyses are required. Herein, we present a new method for the separation of 64 Cu from solutions of mixed fission products and demonstrate the quantification of its activity through use of gas-flow proportional beta counting. Here, the new method was validated through a series of rigorous tests and was shown to improve the detection limit of 64 Cu by over two orders of magnitude, from 2.5 × 10 6 to 1.3 × 10 4 atoms/sample for 100 min measurements.

38 RADIATION CHEMISTRY, RADIOCHEMISTRY, AND NUCLEA↗

LAMP Low-Energy Region Options: Workshop Report and Ranking Assessment

The LANSCE accelerator complex at Los Alamos National Laboratory provides beam to five user facilities: IPF, pRad, UCN, WNR and the Lujan Center. Each user facility receives a beam tailored to its specific requirements, including species (H+ or H- ) and beam pulse format. The capabilities and beam requirements of the LANSCE user facilities are documented elsewhere. The core components of the LANSCE accelerator complex – the beam source area, drift-tube and cavity-coupled linear accelerators – are more than 50 years old; a critical subsystem for beam delivery to the Lujan Center, the proton storage ring (PSR), is approximately 40 years old, with its last major refresh being completed in the late 1990s. The LAMP project is intended to begin a revitalization and update of the LANSCE accelerator complex, starting with the beam source region, drift-tube linac, and PSR.

43 PARTICLE ACCELERATORS↗

LANSCE Accelerator Modernization Project (LAMP) Overview [Slides]

LANSCE is based on a high-current 800 MeV proton accelerator capable of delivering 1 MW of beam power to the central target area. The LANSCE accelerator provides beam simultaneously to 5 separate experimental areas. LANSCE operates with 650 µs RF macro pulses at 120 Hz. Within this macro pulse several different beam timing patterns are utilized. LANSCE also accelerates H + and H – simultaneously. LANSCE celebrated 50 years of beam delivery in 2022.

43 PARTICLE ACCELERATORS↗

Chemical separation and measurement of platinum activation products

Here, a method has been developed to purify and measure platinum radioisotopes in the presence of fission products and environmental constituents. The method uses a combination of cation exchange and anion exchange chromatography and selective precipitation steps to remove other radioisotopes from the sample. The addition of stable platinum carrier allows for a gravimetric determination of the chemical yield of the procedure. Overall, the method is fast, simple, and potentially applicable for rapid turnaround of unknown samples. Using this method, multiple platinum radioisotopes were measured in two different irradiation experiments. The measured ratios of the platinum radioisotopes clearly reflect the neutron spectrum of the irradiation, suggesting that platinum radioisotopes could be valuable signatures in nuclear forensic analyses.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

The LANSCE experimental program: accelerator requirements

The LANSCE accelerator complex exploits a flexible, high power 800 MeV proton linear accelerator to enable a broad swath of experimental work supporting multiple scientific programs. The beam requirements for these programs are diverse and change over time. The purpose of this document is to record, at a high level, the experimental requirements driving the beam delivery requirements for each experimental facility at LANSCE. Revision 0 serves to baseline the current set of experiments, and we expect to revise the document on an as-needed basis when either the experimental requirements change or are found to require a more complete definition.

43 PARTICLE ACCELERATORS↗

Beam Breakup Simulations for the Scorpius Flash-Radiography Accelerator

Beam breakup (BBU) in linear induction accelerators (LIAs) used for flash radiography is problematic because the high-frequency beam motion can blur the source spot, thereby degrading resolution. Amplification of BBU depends directly on details of cell design and is suppressed in operation by the solenoidal magnetic field focusing on the electron beam. Therefore, much effort has gone into design of the cells and magnetic focusing for the new Scorpius radiography LIA. Here, in this article, we use computer simulations to demonstrate that BBU in Scorpius should be no more than in present radiography LIAs at the Los Alamos National Laboratory.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Compact, high-efficiency accelerators driven by low-voltage solid-state amplifiers

A compact particle accelerator can include two or more cavities disposed along an axis of the particle accelerator, each of which is coupled to two or more drivers. The accelerator can also include a power supply coupled to the two or more drivers such that a particle beam traveling along the axis is accelerated. The power supply can be an interface with a commercial power outlet, battery power, or a combination thereof depending upon the use case. Example configurations of the accelerator include hand held or mobile devices that are capable of delivering up to and greater than a 1 MeV electron beam.

Nguyen, Dinh Cong↗

Apparatus for preparing medical radioisotopes

Apparatus for radioisotope production includes housing, a plurality of target disks inside the housing and a curved windows positioned convex inward toward the disks. During operation, coolant flows though the housing across the disks and windows while electron beams passes through the window and the disks. The window temperature increases, rising the fastest in the middle of the window where the electron beam hits the window. A flat window would buckle because the center would deform during thermal expansion against the relatively unaffected periphery, but the curved window shape allows the window to endure high thermal and mechanical stress created by a combination of heating from the electron beam(s) and elevated pressure from coolant on the inside of the window. Such a window may be used for applications in which a pressurized coolant acts on only one side of the window.

Woloshun, Keith A.↗

Production Facility Prototype Blower 1000 Hour Test Results IV

Long duration operations tests of the Aerzen GM 12.4 roots style blower in a closed loop configuration provides valuable data and lessons learned for long-term operation at the Mo-99 production facility. The blower was operated in a closed loop configuration with the flow conditions anticipated in plant operation with a Mo-100 target inline. The additional thermal energy generated from beam heating of the Mo-100 disks was not included in these tests. Twelve long duration 500 to 1000 hour tests have been completed since the first test was performed in January of 2016. All twelve long duration tests have proven successful in exposing preventable issues related to oil and helium leaks. All blower tests to this date have resulted in stable blower performance and consistency. A summary of the results for the end of the ninth test to the twelfth test is included in this report. Complete details for the previous tests are shown in the reports, Production Facility Prototype Blower 1000 Hour Test Results, II, and III.

42 ENGINEERING↗

Off-Normal Scenarios Using Resistively Heated Targets

This report describes the continuation of thermal experiments using the resistively heated target assembly within the helium flow loop at LANSCE that is described in the report, Resistively Heated Target Tests Using Helium Flow Loop, by Alexander Wass et al. In order to replicate off-normal operating scenarios of the helium cooled Mo-100 plant design disks during beam heating, an array of resistive heaters were placed within the helium flow loop, cooled via helium, and modified slightly. The resistively heated test piece is comprised of seven ceramic electric heaters with embedded thermocouples allowing temperature measurements of each heater. A total of three scenarios were performed. One unmodified scenario, and two off-normal scenarios were conducted to simulate a blocked cooling channel due to debris within the flow loop and a broken disk during in-beam heating at the Mo-99 production facility. A removable insert was placed within a cooling channel to block the flow of helium, and a resistive heater was removed to simulate a broken disk that had been evacuated from the target assembly. The inlet and outlet cooling pipe employs rectangular tubing to make a 90° bend at a radius consistent with and practical for the actual plant design.

36 MATERIALS SCIENCE↗

Space-Borne Electron Accelerator Design

Renewed interest in active experiments with relativistic particle beams in space has led to the development of solid-state radio-frequency (RF) linear accelerators (linac) that can deliver MeV electron beams but operate with low-voltage DC power supplies. The solid-state RF amplifiers used to drive the accelerator are known as high-electron mobility transistors (HEMTs), and at C-band (5–6 GHz) are capable of generating up to 500 watts of RF power at 10% duty factor in a small package, i.e., the size of a postage stamp. In operation, the HEMTs are powered with 50 V DC as their bias voltage; they thus can tap into the spacecraft batteries or electrical bus as the primary power source. In this paper we describe the initial testing of a compact space-borne RF accelerator consisting of individual C-band cavities, each independently powered by a gallium nitride (GaN) HEMT. We show preliminary test results that demonstrate the beam acceleration in a single C-band cavity powered by a single HEMT operating at 10% duty factor. An example of active beam experiments in space that could benefit from the HEMT-powered accelerators is the proposed Magnetosphere-Ionosphere Connection (CONNEX) experiment (Dors et al., 2017).

43 PARTICLE ACCELERATORS↗

Sideline radio-frequency power coupler

Provided is a resonant structure including a microwave cavity and a sideline radio-frequency (RF) power coupler including: an inner conductor; an outer conductor sharing a central axis with the inner conductor, the outer conductor being electrically coupled to an outer wall of the microwave cavity; and an insulation layer between the inner conductor and the outer conductor.

42 ENGINEERING↗

Resistively Heated Target Tests Using Helium Flow Loop

A helium flow and heat transfer experiment has been conducted using the helium flow loop facility at the Los Alamos National Laboratory. In order to replicate the helium cooled Mo-100 plant design disks during beam heating, an array of resistive heaters were placed within the helium flow loop, and cooled via helium. The resistively heated test piece is comprised of seven ceramic electric heaters with embedded thermocouples allowing temperature measurements of each heater.Computation fluid dynamic (CFD) simulations and analysis from theory are compared to the experiment results in order to have predictable capabilities for future experiments.

42 ENGINEERING↗

Production Facility Prototype Blower 1000 Hour Test Results III

Long duration operations tests of the Aerzen GM 12.4 roots style blower in a closed loop configuration provides valuable data and lessons learned for long-term operation at the Mo-99 production facility. The blower was operated in a closed loop configuration with the flow conditions anticipated in plant operation with a Mo-100 target inline. The additional thermal energy generated from beam heating of the Mo-100 disks was not included in these tests. Eight long duration 500 and 1000 hour tests have been completed since the first test was performed in January of 2016. All eight long duration tests have proven successful in exposing preventable issues related to oil and helium leaks.

47 OTHER INSTRUMENTATION↗

Production Facility Prototype Blower 1000 Hour Test Results II

Long duration tests of the Aerzen GM 12.4 roots style blower in a closed loop configuration provides valuable data and lessons learned for long-term operation at the Mo-99 production facility. The blower was operated in a closed loop configuration with the flow conditions anticipated in plant operation with a Mo-100 target inline. The additional thermal energy generated from beam heating of the Mo-100 disks were not included in these tests. Five 1000 hour tests have been completed since the first test was performed in January of 2016. All five 1000 hour tests have proven successful in exposing preventable issues related to oil and helium leaks. All blower tests to this date have resulted in stable blower performance and consistency. A summary of the results for each test, including a review of the first and second tests, are included in this report.

42 ENGINEERING↗