Subsurface H 2 Storage: A Williston Basin Commercial-Scale Resource Study

Poster for the 2024 NETL Resource Sustainability Project Review Meeting, Pittsburgh, Pennsylvania, April 2-4, 2024. This poster presents a commercial‑scale assessment of subsurface hydrogen storage potential in the North Dakota portion of the Williston Basin, evaluating saline formations, depleted oil and gas reservoirs, and salt formations. The study integrates laboratory characterization, reservoir simulation, and basinwide analysis to assess storage capacity, injectivity, recovery, and risks related to geochemical, microbial, and wellbore interactions. Results support the feasibility of large‑volume, secure hydrogen storage and provide a framework to guide future hydrogen commercialization and infrastructure development.

08 HYDROGEN↗

EERC Final Topical Report – Findings on Subtask 3.2 – Produced Water Management Through Geologic Homogenization, Conditions, and Reuse

The Energy & Environmental Research Center (EERC) was awarded a contract by the North Dakota Industrial Commission (NDIC) Oil and Gas Research Program (NDIC No. G-051-101) to conduct a study on the recycling of water used in oil and gas operations, also known as produced water, from oil- and gas-producing regions of North Dakota as directed by Section 19 of North Dakota House Bill 1014. This final report provides a compilation of results of the study, which include regulatory, scientific, technological, and feasibility methods and considerations associated with North Dakota produced water management. The report provides a synopsis of this project’s previously submitted produced water assessment report entitled “Produced Water Management and Recycling Options in North Dakota” (Energy & Environmental Research Center, 2020), with updated values provided as appropriate. The report provides the results from the investigation of a novel produced water management strategy, referred to as geologic homogenization, conditioning, and reuse (GHCR), which aims to use a subsurface geologic formation as a natural medium for managing produced water recycling and reuse. Water management is a significant technical and economic challenge for sustainable oil and gas production, and water volumes are intrinsically linked to oil production volumes. North Dakota oil production rose to over 1.5 million barrels (MMbbl)/day in 2019, and despite a downturn in oil price in early 2020, North Dakota oil production has recovered to 1.1 MMbbl/day as of August 2021. Bakken petroleum system development between 2008 and 2020 has resulted in a nearly fourfold increase in produced water volumes to 642 MMbbl/yr in 2020 after peaking at 740 MMbbl/yr in 2019 and a fivefold increase in saltwater disposal (SWD) volumes to 565 MMbbl/yr in 2020 after a peak of 682 MMbbl/yr in 2019. Produced water and SWD volumes are forecasted to double by 2030. SWD is the primary method of produced water management used in North Dakota, with approximately 95% of the SWD volume occurring through subsurface injection into sandstones of the Dakota Group (Dakota). Localized pressurization of the Dakota resulting from SWD and projected increases in produced water volumes could impact the economics of North Dakota oil production. As a result, there is an emerging need to pursue alternative produced water management approaches, including recycling and reuse. While produced water recycling is not yet widespread, commercial operators are making strides in overcoming the technical challenges of using high salinity produced water in completion operations (Marathon Oil, 2020). As water management continues to be a key focal point in companies’ environmental, social, and governance (ESG) initiatives, focus on water management, including recycling, will likely continue to increase. Laboratory column testing, field sample collection, geologic modeling and numerical simulation, and techno-economic analysis all indicate that GHCR could feasibly be implemented as a potential water management option. Laboratory column testing and field sample collection indicate that the Inyan Kara sandstone and native formation fluid are capable of homogenizing with the Bakken produced water to a point where the fluid composition appears to stabilize. Extracting that stabilized fluid could be considered homogeneous and capable of providing individual batches of hydraulic fracturing fluid. Numerical simulation results indicate that extraction of fluids from the Inyan Kara in a GHCR implementation scenario is capable of reducing formation pressure, which would help ease localized pressurization of the Inyan Kara and extend the available capacity for nearby existing SWD wells. Economic analysis indicates that there are scenarios where GHCR implementation can be a competitive or even lower-cost option than a conventional water management approach. Site-specific conditions will dictate the economic potential of GHCR, but potentially attractive sites for GHCR implementation will be those that are located above a pressurized zone of the Inyan Kara, need six or more Bakken infill wells, and face high costs for conventional SWD and/or freshwater. Based on the regulatory review, drilling into the Inyan Kara for SWD and to harness as a source water for industrial use have precedent in North Dakota, and a workable regulatory solution for GHCR seems likely. However, restrictions in the state regarding surface storage and transport of produced fluids may limit some activities, which will affect how GHCR could ultimately be implemented. In summary, this study reveals pursuing GHCR can be a viable approach to water management in North Dakota. The GHCR concept addresses some of the challenges that hinder the more traditional approaches to recycling in the industry. Furthermore, an assessment of the current landscape of water management within the state reveals the ongoing trend of increasing volumes of produced water and SWD. Projections reveal that the volumes of produced water that need to be managed are expected to double over the next decade (Energy & Environmental Research Center, 2020). With the continued development of the Bakken and continuing driving factors related to ESG initiatives, implementing a practice such as GHCR is a feasible approach to adding recycling of produced water to industry within the state. This subtask was cofunded through the EERC–U.S. Department of Energy Joint Program on Research and Development for Fossil Energy-Related Resources Cooperative Agreement No. DE-FE0024233. Nonfederal funding was provided by the North Dakota Industrial Commission Oil and Gas Research Program. References Energy & Environmental Research Center, 2020, Produced water management and recycling options in North Dakota: Final Report for North Dakota Legislative Management Energy Development and Transmission Committee and North Dakota Industrial Commission. Marathon Oil, 2020, Sustainability report: https://cdn.sanity.io/files/ghcnw9z2/website/ 91744eb6ef8fbe59505a911c6b8d2e8dd9a537fa.pdf?dl (accessed November 2021).

02 PETROLEUM↗

A simulation study of carbon storage with active reservoir management

As part of the Integrated Midcontinent Stacked Carbon Storage Hub (IMSCS-Hub) project led by Battelle Memorial Institute, a study was conducted to determine the feasibility of storing carbon dioxide (CO 2 ) in the stacked saline rock formations of the Sleepy Hollow Field (SHF), located in Red Willow County, southern Nebraska. A series of CO 2 injection simulation scenarios, with and without active reservoir management (ARM; brine extraction), were evaluated to investigate the feasibility of storing 50+ million tonnes (Mt) of CO 2 . The results indicated CO 2 injection combined with ARM may enable permanent storage of 50+ Mt of CO 2 . The area of review (AOR), the area in which underground sources of drinking water (USDWs) might be endangered during CO 2 injection, was assessed for the simulation scenarios. In comparison to a case without ARM, brine extraction resulted in a much smaller AOR, covering an area of 42 square miles (108.8 km 2 ), roughly one-fourth the size of an AOR resulting from CO 2 injection without ARM. Our findings, presented in this paper, indicate that CO 2 injection with ARM can improve the CO 2 storage capacity of a geologic storage complex up to 100% while also reduce the rate of pressure buildup in the subsurface, resulting in a 75% reduction in AOR. This may help in lowering carbon capture and storage project costs, risks, and effort needed to meet monitoring requirements for a storage project.

54 ENVIRONMENTAL SCIENCES↗

Development of Intelligent Monitoring System (IMS) Modules for the Aquistore CO 2 Storage Project

The monitoring data generated at a CO 2 storage site can quickly result in large amounts of data, often requiring significant labor- and time-intensive efforts to process and analyze before being able to make operational decisions. Implementing an intelligent monitoring system (IMS) can reduce the associated data-processing and analysis costs, which can thereby improve the efficiency of the monitoring process and enable real-time operational decision-making. The Energy & Environmental Research Center (EERC) has completed a 3-year project focused on developing an IMS comprising new workflows, algorithms, and a user interface for the automation and integration of geologic carbon dioxide (CO 2 ) storage site-monitoring and simulation data. The design for the IMS was based on using injection and monitoring data acquired from Aquistore, an operating CO 2 storage project. Managed by the Petroleum Technology Research Centre, the Aquistore Project is injecting CO 2 captured from SaskPower’s coal-fired Boundary Dam Power Station into a deep saline formation for geologic storage. Using data from the Aquistore Project provided a real-world basis to develop an IMS.

47 OTHER INSTRUMENTATION↗

Nebraska Integrated Carbon Capture and Storage Pre-Feasibility Study

In collaboration with the Nebraska Public Power District (NPPD), the Energy & Environmental Research Center (EERC) has conducted a pre-feasibility study for a commercial-scale carbon dioxide (CO 2 ) geologic storage complex in western Nebraska integrated with potential CO 2 capture at Gerald Gentleman Station (GGS). GGS is the largest coal-fired electricity-generating station in Nebraska, emitting 8.5 million metric tons (Mt) of CO 2 annually, and is located near the town of Sutherland. This pre-feasibility (Phase 1) project has been executed as part of the U.S. Department of Energy (DOE) CarbonSAFE program, a multiphase initiative to support the deployment of large-scale carbon capture and storage (CCS) projects. Each CarbonSAFE project is required to demonstrate the potential to capture and store at least 50 million tonnes (Mt) of CO 2 over a 25-year operational period. The EERC and NPPD established a coordination team to identify challenges to a potential Nebraska CCS project, comprising local stakeholder organizations, which met twice in Lincoln and via several Webinars, providing feedback and guidance throughout the pre-feasibility study. The EERC also secured the technical support of Schlumberger Carbon Services and Computer Modelling Group Ltd. (CMG). The project comprised four technical themes, all using published information sources. Regional and stakeholder analysis, including identification of sensitive environmental areas, potential resource conflicts, and strategies for public outreach. A review of geographic and socioeconomic characteristics, in combination with geologic characterization in the subbasinal analysis described below, identified an area to the southwest and within a 75-mile radius of GGS as the most prospective for development of a storage site. This area largely avoided lands with protected status such as wetlands. A public outreach plan has also been developed for implementation in any further phases of CCS assessment in western Nebraska, for example a CarbonSAFE Phase 2 feasibility study. Scenario analysis, addressing economic and regulatory factors. GGS is the only single major source of CO 2 emissions capable of satisfying the CarbonSAFE 50-Mt scale requirement within the study region. Chemical absorption using amines was identified as the most viable technology for postcombustion CO 2 capture at GGS. The total cost of a CCS project at GGS was estimated to be between $67/tonne CO 2 for capture and auxiliary boiler to minimize parasitic load and $70/tonne CO 2 avoided cost, using the Carnegie-Mellon University Integrated Environmental Control Model (IECM). The total avoided cost included the capture facility and parasitic load, a flue gas desulfurization plant required for the use of amine solvent technology, transport via pipeline, and dedicated storage infrastructure. Nebraska has no legislation in place to address typical CCS-specific issues, for example pore space ownership for storage. Long-term liability, therefore, falls under the U.S. Environmental Protection Agency Underground Injection Control (UIC) Class 6 program regulations. Subbasinal analysis, addressing the potential for a dedicated subsurface “container” to store the required 50-Mt quantity of CO 2 . Modeling and simulation studies identified an area to the southwest of GGS with the potential for storage of 50 Mt CO 2 in the Cloverly Formation, comprising sandstones with interbedded and intermingled shales. The area of review (AOR) that would be required for monitoring under a Class VI operating permit was estimated to be as high as 400–700 square miles, due to uncertain pressure effects. The viability of this storage option is subject to significant uncertainty due to the relatively limited amount of existing characterization data available to the pre-feasibility study; for example, dynamic simulation indicated that the proposed storage rate might require as little as two or as many as 14 injection wells. A key uncertainty is the relative proportion and distribution of sandstone and shale within the Cloverly Formation. A preliminary, semiquantitative risk assessment also suggested uncertainty over storage capacity and injectivity constitute the most significant project risks at this pre-feasibility stage. No assessed risks were considered to rule out the possibility of a project moving to deployment. National Risk Assessment Partnership (NRAP) validation, using software tools developed by the National Energy Technology Laboratory (NETL) to assess risks associated with the potential 50-Mt CO 2 storage complex. NRAP tools were used to assess hypothetical leakage scenarios. Results broadly supported the conclusion of the semiquantitative risk analysis – for example, even worst-case analysis of theoretical leakage scenarios found limited migration rates and impacts. In summary, the work undertaken in this Phase 1 pre-feasibility study has shown that western Nebraska has potential to host a commercial-scale CCS project, including a dedicated storage “container” for 50 Mt of CO 2 . However, the following key challenges would need to be overcome: The business case for deploying CCS projects is uncertain; recently announced federal tax credits and sales of CO 2 for enhanced oil recovery may not cover the full costs of a CCS project at GGS, as estimated by this pre-feasibility study. The potential 50-Mt CO 2 dedicated storage container defined in this pre-feasibility study should be regarded as having a relatively low level of readiness to support a CCS project. Public outreach would be a vital element in western Nebraska, where sensitivities around such environmental issues as water resource protection and pipeline construction would need to be carefully addressed.

54 ENVIRONMENTAL SCIENCES↗

Aquistore CO 2 Storage Project: Numerical Modeling and Simulation Update

This updated simulation model at the EERC is now capable of reproducing (with a global history-matching error of around 7%) not only the continuous pressure response but also the well logging monitoring data such as CO 2 flow distributions at the injection well and the CO 2 breakthrough profile at the observation well. The first arrival of CO 2 at the observation well is not known. The PNL data collected in February 2016 showed clear evidence of CO 2 presence with saturation values as high as 60% at the observation well while a monitoring logging event (a pulsed-neutron decay [PND]) prior to that one, performed on December 4, 2015, showed no sign of CO 2 . The history-matching results indicate that CO 2 appears to have first arrived at the iv observation well around mid-December 2015, after approximately 8 months of injection. At the end of the history-matching process, the simulated CO 2 plume extent appears the largest in Perforation 2 with a diameter of 540 m around the injection well.

54 ENVIRONMENTAL SCIENCES↗

FIELD IMPLEMENTATION PLAN FOR A WILLISTON BASIN BRINE EXTRACTION AND STORAGE TEST

The Energy & Environmental Research Center (EERC) successfully completed all technical work of Phase I, including development of a field implementation plan (FIP) for a brine extraction and storage test (BEST) in the North Dakota portion of the Williston Basin. This implementation plan was commissioned by the U.S. Department of Energy (DOE) National Energy Technology Laboratory (NETL) as a proxy for managing formation pressure plumes and measuring/monitoring the movement of differential pressure and CO2 plumes in the subsurface for future saline CO2 storage projects. BEST comprises the demonstration and validation of active reservoir management (ARM) strategies and extracted brine treatment technologies. Two prospective commercial brine injection sites were evaluated for BEST to satisfy DOE’s goals. Ultimately, an active saltwater disposal (SWD) site, Johnsons Corner, was selected because it possesses an ideal combination of key factors making it uniquely suited to host BEST. This site is located in western North Dakota and operated by Nuverra Environmental Solutions (Nuverra), a national leader in brine handling, treatment, and injection. An integrated management approach was used to incorporate local and regional geologic characterization activities with geologic and simulation models, inform a monitoring, verification, and accounting (MVA) plan, and to conduct a risk assessment. This approach was used to design a FIP for an ARM schema and an extracted brine treatment technology test bed facility. The FIP leverages an existing pressure plume generated by two commercial SWD wells. These wells, in conjunction with a new brine extraction well, will be used to conduct the ARM schema. Results of these tests will be quantified based on their impact on the performance of the existing SWD wells and the surrounding reservoir system. Extracted brine will be injected into an underlying deep saline formation through a new injection well. The locations of proposed extraction and injection wells were selected during the Phase I efforts. These wells will be permitted as North Dakota Administrative Code Underground Injection Control Class II wells and will yield additional characterization data which will further refine the FIP in Phase II. An array of surface and downhole monitoring techniques will validate ARM performance against predictive simulation results. Infrastructure will be constructed to manage extracted fluids at the surface and provide brine to a treatment test bed facility. Treatment of extracted brine can provide a means of reducing extracted brine disposal volumes, an alternate source of water, and/or salable products for beneficial use. A test bed facility will be constructed to provide a means of demonstrating these technologies on a wide range of brine concentrations. Screening criteria based on a techno-economic and life cycle assessment were developed to select high-salinity brine treatment technologies for extended duration treatment (30–60 days) in Phase II. A detailed cost assessment determined total implementation costs for BEST of $19,901,065 million (DOE share $15,680,505). These costs are inclusive of all necessary equipment, infrastructure construction, operations and project closeout costs required to implement BEST. An ideal combination of key factors makes the Johnsons Corner site uniquely suited to be the BEST demonstration.

10 SYNTHETIC FUELS↗