The EIC accelerator: design highlights and project status

The design of the electron-ion collider (EIC) at Brookhaven National Laboratory is well underway, aiming at a peak electron-proton luminosity of 10e+34 cm^-1·sec^-1. This high luminosity, the wide center-of-mass energy range from 29 to 141 GeV (e-p) and the high level of polarization require innovative solutions to maximize the performance of the machine, which makes the EIC one of the most challenging accelerator projects to date. The complexity of the EIC will be discussed, and the project status and plans will be presented.

43 PARTICLE ACCELERATORS↗

Progress towards the completion of the proton power upgrade project

The Proton Power Upgrade project at the Spallation Neutron Source at Oak Ridge National Laboratory will increase the proton beam power capability from 1.4 to 2.8 MW. Upon completion in early 2025, 2 MW of beam power will be available for neutron production at the existing first target station (FTS) with the remaining beam power available for the future second target station (STS). The project has installed seven superconducting radio-frequency (RF) cryomodules and supporting RF power systems to increase the beam energy by 30% to 1.3 GeV, and the beam current will be increased by 50%. The injection and extraction region of the accumulator ring are being upgraded, and a new 2 MW mercury target has been developed along with supporting equipment for high-flow gas injection to mitigate cavitation and fatigue stress. The first four cryomodules and supporting systems were commissioned in 2022-2023 and supported neutron production at 1.05 GeV, 1.7 MW with high reliability. The first-article 2 MW target was operated successfully for approximately 4400 MW-Hours over two run periods. The long outage began in August 2023 for installation of the remaining technical equipment and construction of the Ring-to-Target Beam Transport tunnel stub that will enable connection to the STS without interrupting operation of the FTS. The upgrade is proceeding on-schedule and on-budget, and resumption of neutron production for the user program is planned for July 2024.

43 PARTICLE ACCELERATORS↗

Design Status of the Electron-Ion Collider

The Electron-Ion Collider is gearing up for "Critical Decision 2", theproject baseline with defined scope, cost and schedule.Lattice designs are beingfinalized, and preliminary component design is being carried out. Beam dynamicsstudies such as dynamic aperture optimization, instability and polarizationstudies, and beam-beam simulations are continuing in parallel. We report onthe latest developments and the overall status of the project, and presentthe plans for future activities.

43 PARTICLE ACCELERATORS↗

Design and Prototyping of the Electron Ion Collider Electron Storage Ring SRF cavity

Among the EIC?s numerous RF subsystems, the electron storage ring?s (ESR) 591 MHz fundamental RF system is one of the most challenging. Each cavity in the system will handle up to 2.5 A of beam current and supply up to 600 kW beam power under a wide range of voltage. The EIC R&D plan includes the design, fabrication and testing of such a cavity. In this paper, we will report the latest status and findings of the ongoing design and prototyping of this cavity, including the RF and mechanical/thermal design, fabrication design, and the progress of fabrication.

Guo, Jiquan↗

DEVELOPMENT OF A PROTOTYPE 197 MHz CRAB CAVITY FOR THE ELECTRON-ION COLLIDER AT JLAB

Thomas Jefferson National Accelerator Facility (JLab) is currently developing a prototype 197MHz Radio-Frequency Dipole (RFD) crab cavity as part of the Electron-Ion Collider (EIC) to be built at Brookhaven National Laboratory (BNL). Cryomodules containing these cavities will be part of the Hadron Storage Ring (HSR) of the EIC. The prototype cavity is constructed primarily of formed niobium sheets of thickness 4.17mm, with machined niobium parts used as interfaces where tight tolerancing is required. The cavity?s large size and complex features present sever-al challenges in fabrication, tuning, and RF testing. Structural and forming analyses have been carried out to optimize the design and fabrication processes. An overview of the design phase and the current state of fabrication are presented in this paper.

Huque, Naeem↗

Development of a Prototype Superconducting Radio-Frequency Cavity for Conduction-Cooled Accelerators

Recent progress in the development of high-quality Nb?Sn film coatings along with the availability of cryocoolers with high cooling capacity at 4 K makes it feasible to operate SRF cavities cooled by thermal conduction at relevant accelerating gradients for use in accelerators. We have developed a prototype single-cell cavity to prove the feasibility of operation up to the accelerating gradient required for 1 MeV energy gain, cooled by conduction with cryocoolers. The cavity has a ~3 ¿m thick Nb?Sn film on the inner surface, deposited on a ~4 mm thick bulk Nb substrate and a bulk ~7 mm thick Cu outer shell with three Cu attachment tabs. The cavity was tested up to a peak surface magnetic field of 53 mT in liquid He at 4.3 K. A horizontal test cryostat was designed and built to test the cavity cooled with three cryocoolers. The rf tests of the conduction-cooled cavity achieved a peak surface magnetic field of 50 mT and stable operation was possible with up to 18.5 W of rf heat load. The peak frequency shift due to microphonics was 23 Hz. These results represent the highest peak surface magnetic field achieved in a conduction-cooled SRF cavity to date

Ciovati, Gianluigi↗

Design and Prototyping of the Electron Ion Collider Electron Storage Ring SRF cavity

Among the EIC?s numerous RF subsystems, the electron storage ring?s (ESR) 591 MHz fundamental RF system is one of the most challenging. Each cavity in the system will handle up to 2.5 A of beam current and supply up to 600 kW beam power under a wide range of voltage. The EIC R&D plan includes the design, fabrication and testing of such a cavity. In this paper, we will report the latest status and findings of the ongoing design and prototyping of this cavity, including the RF and mechanical/thermal design, fabrication design, and the progress of fabrication.

Guo, Jiquan↗

Progress on the Proton Power Upgrade Project at the Spallation Neutron Source

The Proton Power Upgrade Project at the Spallation Neutron Source at Oak Ridge National Laboratory will increase the proton beam power capability from 1.4 to 2.8 MW. Upon completion of the project, 2 MW of beam power will be available for neutron production at the existing first target station with the remaining beam power available for the future second target station. The project will install seven superconducting RF cryomodules and supporting RF power systems and ancillaries to increase the beam energy to 1.3 GeV . The injection and extraction region of the accumulator ring will be upgraded, and a new 2 MW mercury target has been developed along with supporting equipment for high-flow gas injection to mitigate cavitation and fatigue stress. Equipment is being received from vendors and partner laboratories, and installation is underway with three major installation outages planned in 2022-2024. The project is planned to be completed in 2025.

43 PARTICLE ACCELERATORS↗

Design of the Electron Ion Collider Electron Storage Ring SRF cavity

The Electron Ion Collider (EIC) under construction at Brookhaven National Laboratory is a high luminosity collider as the next major research facility for the nuclear physics community. Among the numerous RF subsystems in the EIC, the electron storage ring (ESR) fundamental RF cavities system is one of the most challenging. This system will handle a high beam current of up to 2.5 A and replenish up to 10 MW of beam power losses from synchrotron radiation and HOM. Variable coupling is required in the cavities due to the wide range of required total RF voltage and beam current combinations. In this paper, we will present the status of the design and future plans.

Guo, Jiquan↗

Improvements to LCLS-II Cryomodule Transportation

The Linear Coherent Light Source (LCLS-II) is currently being constructed at the SLAC National Laboratory. A total of 35 cryomodules will be fabricated at Jefferson Lab (JLab) in Virginia and Fermi National Laboratory (FNAL) in Illinois and transported via road to SLAC. A shipping frame with an inner bed isolated by springs was designed to protect the CMs from shocks and vibrations during shipments. Successful road testing of the JLab prototype paved the way for production CM shipments. The initial production shipments lead to several catastrophic failures in beamline vacuum in the cryomodules. The failures were determined to be due to fatigue in Fundamental Power Coupler (FPC) bellows due to excessive motion during shipment. A series of instrumented CM shipping tests and component tests were undertaken to develop a solution. A modified spring layout was tested and implemented, which reduced shocks on the CMs. FPC coupler bellows restraints were tested on a shaker table and on a CM during shipping; they were able to reduce bellows motion by a factor of three. The updated shipping system is currently in use and has successfully delivered six cryomodules to SLAC from JLab and FNAL.

43 PARTICLE ACCELERATORS↗

UPGRADES TO CRYOGENIC CAPABILITIES FOR CRYOMODULE TESTING AT JLAB

The cryogenic facilities for cryomodule testing at Jefferson Lab (JLab) have been modified and to enable testing of Linear Coherent Light Source-II (LCLS-II) cryomodules. Temporary changes in u-tube connec-tions at the Cryogenic Test Facility (CTF) has enabled rates of cavity cooling that are a factor of 10 higher than previously achieved. Cryogenic connections at JLab?s Low Energy Recirculator Facility (LERF) have been repurposed to enable two LCLS-II cryomodules to be tested in series. This testing shares the helium space with the Central Helium Liquefier (CHL) that is also used by the Continuous Electron Beam Accelera-tor Facility (CEBAF). Cryomodule testing can occur while beam operation is ongoing at CEBAF. Improve-ments to these facilities have allowed the testing of the JLab?s highest ever performing cryomodules.

Huque, Naeem↗

Study on Cleaning of Copper Plated Bellows for LCLS-II

Inter-cavity copper plated bellows are part of the LCLS-II cryomodule beamline components. Since the bellows are close to superconducting radio frequency (SRF) cavities during accelerator operation, it is desirable that these bellows have similar cleanliness as SRF cavi-ties. Studies have been done to help evaluate bellows interior cleanliness after the standard bellows cleaning procedure at Jefferson Lab.

Zhao, Liang↗

RESULTS OF ACCELERATED LIFE TESTING OF LCLS-II CAVITY TUNER MOTOR

An Accelerated Life Test (ALT) of the Phytron stepper motor used in the LCLS-II cavity tuner has been conducted at JLab. Since the motor will reside inside the cryomodule, any failure would lead to a very costly and arduous repair. As such, the motor was tested for the equivalent of 30 lifetimes before being approved for use in the production cryomodules. The 9-cell LCLS-II cavity is simulated by disc springs with an equivalent spring constant. Plots of the motor position vs. tuner position ' measured via an installed linear variable differential transformer (LVDT) ' are used to measure motor motion. The titanium spindle was inspected for loss of lubrication. The motor passed the ALT, and is set to be installed in the LCLS-II cryomodules.

Huque, Naeem↗

MAGNETIC HYGIENE CONTROL ON LCLS-II CRYOMODULES FABRICATED AT JLAB

Jefferson Lab (JLab) is in collaboration with Fermi Na-tional Accelerator Laboratory (Fermilab) to build 18 cryomodules to install at the SLAC National Accelerator Laboratory?s tunnel as part of the Linac Coherent Light Source upgrade project (LCLS-II). Each LCLS-II cry-omodule hosts 8 superconducting niobium cavities that adopt the nitrogen doping technique, which aims to en-hance the cavity quality factor Qo to reduce the consumption of liquid helium used to cool down the cavities. It is known that the Qo of niobium cavities is affected by cavity surface magnetic field. Traditionally, magnetic shields made of high magnetic permeability mu-metals are employed as a passive shielding of the ambient magnetic fluxes. During the LCLS-II cryomodule development, magnetic hygiene control that includes magnetic shielding and demagnetization of parts and the whole-machine is implemented. JLab and Fermilab worked closely on developing magnetic hygiene control procedures, identifying relevant tools, investigating causes of magnetization, magnetic field monitoring, etc. This paper focuses on JLab?s experiences with LCLS-II cryomodule magnetic hygiene control during its fabrication.

Cheng, Guangfeng↗

LCLS-II Cryomodule Production at JLAB

The LCLS-II cryomodule construction program leverages the mature XFEL cryomodule design to produce technologically sophisticated cryomodules with a minimum of R&D according to an accelerated manufacturing schedule. Jlab, as one of the partner labs, is producing 18 cryomodules for LCLS-II. To meet the quality and schedule demands of LCLS-II, many upgrades to the JLAB cryomodule assembly infrastructure and techniques have been made. JLab has installed a new cleanroom for string assembly and instituted new protocols to minimize particulate transfer into the cavities during the cryomodule construction process. JLab has also instituted a set of magnetic hygiene protocols to be used during the assembly process to minimize magnetic field impingement on the finished cavity structure. The goal has been to have gradients, both maximum and field emission onset, that do not degrade between the cavity vertical test and final cryomodule qualification, while maximizing the Q0 of each finished cavity. Results from the prototype and first production cryomodule assembly are presented.

Davis, Giles↗

OPERATION OF THE CEBAF 100 MV CRYOMODULES

The Continuous Electron Beam Accelerator Facility (CEBAF) 12 GeV upgrade reached its design energy in December of 2015. Since then CEBAF has been deliver-ing 12 GeV beam to experimental Hall D and 11 GeV to experimental halls A and B in support of Nuclear physics. To meet this energy goal, ten new 100 MV cryomodules (80 cavities) and RF systems were installed in 2013. The superconducting RF cavities are designed to operate CW at a maximum accelerating gradient of 19.3 MV/m. To support the higher gradients and higher QL (~ 3×107) op-erations, the RF system uses 13 kW klystrons and digital LLRF to power and control each cavity. This paper re-ports on the C100 operation and optimization improve-ments of the RF system and cryomodules.

Hovater, James↗

First attempt of at-cavity cryogenic X-ray detection in a CEBAF cryomodule for field emission monitoring

We report on the first result of at-cavity X-ray detection in a CEBAF cryomodule for field emission monitoring. In the 8-cavity cryomodule F100, two silicon diodes were installed near the end flange of each cavity. Each cavity was individually tested during the cryomodule test in JLab’s cryomodule test facility. The behaviors of these at-cavity cryogenic X-ray detectors were compared with those of the standard ‘in air’ Geiger-Muller (G-M) tubes. Our initial experiments establish correlation between X-ray response of near diodes and the field emission source cavity in the 8-cavity string. For two out of these eight cavities, we also carried out at-cavity X-ray detection experiment during their vertical testing. The aim is to track field emission behavior uniquely from vertical cavity testing to horizontal cavity testing in the cryomodule. These preliminary results confirmed our expectation and warrant further effort toward the establishment of permanent at-cavity cryogenic X-ray detection for SRF development and operation.

43 PARTICLE ACCELERATORS↗