Search NASA⌕ Search

Engineering topics

David Wilson

Publications and source records attributed to David Wilson.

NASA Earth Science Technology Office (ESTO) Advanced Information Systems Technology (AIST) New Observing Strategies (NOS)

NASA's Advanced Information Systems Technology (AIST) Program is one of several Technology programs managed by the Earth Science Technology Office (ESTO) in the Earth Science Division (ESD). The AIST Program focuses on advanced information systems and novel computer science technologies that will be needed by NASA Earth Science in the next 5 to 10 years. New Observing Strategies is one the three main thrusts of the AIST Program. Each year, all the PI's present the technical advancements of their projects during a Grouped Technical Session.

Jacqueline Le Moigne-stewart↗

Red Dragon Drill Missions to Mars

We present the concept of using a variant of a Space Exploration Technologies Corporation (SpaceX) Dragon space capsule as a low-cost, large-capacity, near-term, Mars lander (dubbed "Red Dragon") for scientific and human precursor missions. SpaceX initially designed the Dragon capsule for flight near Earth, and Dragon has successfully flown many times to low-Earth orbit (LEO) and successfully returned the Dragon spacecraft to Earth. Here we present capsule hardware modifications that are required to enable flight to Mars and operations on the martian surface. We discuss the use of the Dragon system to support NASA Discovery class missions to Mars and focus in particular on Dragon's applications for drilling missions. We find that a Red Dragon platform is well suited for missions capable of drilling deeper on Mars (at least 2 m) than has been accomplished to date due to its ability to land in a powered controlled mode, accommodate a long drill string, and provide payload space for sample processing and analysis. We show that a Red Dragon drill lander could conduct surface missions at three possible targets including the ice-cemented ground at the Phoenix landing site (68degN), the subsurface ice discovered near the Viking 2 (49degN) site by fresh impact craters, and the dark sedimentary subsurface material at the Curiosity site (4.5degS).

Drill↗

Lunar Mega Project: Processes, Work Flow and Terminology of the Terrestrial Construction Industry versus the Space Industry

Recent developments around the world show an increased interest and international activity toward developing a lunar surface human and robotic presence with a long term, sustainable vision. In Europe, the construction of a "Moon Village" has been proposed, and China has stated its intention to build a research station with a crew at the lunar South Pole. Russia stated it will land cosmonauts on the Moon in the 2030's. India has sent an orbiter, a robotic lander, and rover to the Moon. The USA intends to land the first woman and a man on the Moon by 2024 to initiate a sustained human lunar presence.A lunar research station with associated commercial activities will require infrastructure to become a permanent capability. Landing and launch pads, propellant storage and distribution farms, spacecraft access and handling structures, cranes, blast protection berms or walls, roads, graded areas, dust stabilized areas, foundations, parking lots, radiation shelters, micro-meteorite protection hangars, habitats and other human shelters, greenhouse farms, utility trenches, power plants, industrial water and oxygen extraction plants, communications antenna towers, thermal protection, mining zones, crater access and sub-surface access will be required to create a safe and sustainable lunar operations capability. This infrastructure will require significant construction activities in an extreme environment, with risky and expensive operations. On Earth, there are similar large and expensive projects (>$1 Billion) in difficult locations that attract a lot of public attention. These are known as "Mega Projects" and examples include bridges, tunnels, highways, railways, airports, seaports, power plants, dams, wastewater projects, Special Economic Zones (SEZ), oil and natural gas extraction projects, public buildings, information technology systems, aerospace projects, and weapons systems. Large consortiums consisting of public and private entities typically implement these infrastructure Mega-Projects.This paper will compare the typical design process, project management process, and work flow in the terrestrial construction industry to the space industry in order to create a better understanding between the terrestrial construction industry and the space industry, to further enable collaboration on a lunar Mega Project to build infrastructure on the Moon. In addition, a glossary of respective industry terminology with annotated linkages and definitions has been compiled. This information will enable contracts and business practices to be formulated for generating requests for proposals (RFP) by governments to consortiums consisting of construction and space industry companies that will bid on Lunar Infrastructure Projects that could lead to contracts to build the permanent capabilities.

Robert P Mueller↗

Taming the Untamable: Making An Enceladus-Like Plume by Hypervelocity Oblique Impacts at the NASA Ames Vertical Gun Range (AVGR) Facility

Enceladus’ plume was extensively investigated by the Cassini-Huygens mission [1-4], giving information about the icy moon interior, and the existence of a plausibly inhabited global ocean. The plume is a mixture of gas, sub-micrometer to micrometer ice, and non-ice particles, expanding into space from vents in the Tiger Stripes region [5]. Collecting plume’s ice particles for signs of Life is a fundamental objective of future fly-by missions to Enceladus, and other icy moons, e.g., Europa, where icy plumes could exist. However, understanding particle collection on high-speed flybys through a plume environment is a challenging task. To address the above, in collaboration with the Applied Physics Laboratory (APL), we have been testing the collection of impact-generated ice grains from simulated ice plumes at the NASA Ames Vertical GunRange (AVGR) facility [e.g., 6-7].Of particular interest is the alteration of organic material in the particles during the high-speed collection process. Any such alteration could degrade the ability of instruments to detect biomarkers in the samples collected. An experimental and theoretical understanding of the organic alteration as a function of collection speed could be used to unravel these effects. Methods: Plumes of -170°C ice particles traveling at an initial speed of 2 – 3 km/s were created by shooting 3-mm hollow Aluminum (Al) projectiles (up to 6 km/s) at liquid-nitrogen-cooled ice targets of synthetic seawater (SSW). An Al witness foil is positioned to determine particle size, and ice particle impact speed is determined by high-speed video. The ice particles smash and sublimate on impact leaving salt residue, dents, and pits on the Al witness foil. We characterized Ice grains type, abundance, density, shape, and distribution caliper (Ferret)diameter via image pattern recognition analysis (ImageJ Software) of still camera photographs of the Al target. Results: Our hyper-velocity impact experiments generated an Enceladus plume analog with an ice particle mean diameter within the particle size distribution (i.e., 2 micrometers to 50 micrometers) as determined by Cassini’s multiple instruments [8]. Simulated impact speed ranged0.2 km/s to 1-2 km/s. The continued experimental production of high-velocity, micrometer-sized ice grains is underway at the AVGR. The relevance of ice particle generation is multifold, so are its applications. These include testing for fragmentation of molecular organics to interpret Cassini’s data (e.g., Cassini Data Analysis Program) and studies of forwarding contamination (a planetary protection issue).

Rosalba Bonaccorsi↗

Supervisory On-line Optimal Control of an Electric Power Microgrid Design for Lunar Habitation

The following article describes an optimal control algorithm for the operation and study of an electric microgrid designed to power a lunar habitat. A photovoltaic (PV) generator powers the habitat and the presence of predictable lunar eclipses necessitates a system to prioritize and control loads within the microgrid. The algorithm consists of a reduced order model (ROM) that describes the microgrid, a discretization of the equations that result from the ROM, and an optimization formulation that controls the microgrid’s behavior. In order to validate this approach, the paper presents results from simulation based on lunar eclipse information and a schedule of intended loads.

Joseph Young↗