Mechanical Design of the PIP-II ORBUMP Pulsed Dipole Magnet

The Proton Improvement Plan-II (PIP-II) is a vital upgrade to Fermilab's accelerator complex. The upgrade is designed to power the world s most intense high-energy neutrino beam in future experiments. The magnet pulse repetition rate of the PIP-II injection system is being upgraded from 15 Hz to 20 Hz and requires a roughly 30% increase in the magnetic field of the new Orbital Bump (ORBUMP) magnets in the Booster. The magnet is secured in a vacuum box and the core is made up of 0.127 mm thick, low carbon steel laminations with a C-5 inorganic coating. The core is clamped using external tie bars welded to the core end plates. ANSYS Finite Element Analysis (FEA) was used to evaluate the clamping design to minimize the deflection of the core post welding of the tie bars. The water-cooled single turn coil is electrically isolated from the core using virgin PEEK insulating material in the gap. An investigation into the high voltage performance of the virgin PEEK insulator was conducted. The design of the coil which shapes the magnetic field by acting as the pole tips is critical for the integrated field homogeneity. The coil manufacturing tolerances and fabrication techniques were evaluated to ensure the magnetic properties of the magnet could be obtained. The ORBUMP magnet mechanical design is presented in this paper.

Karas, Dino [Fermilab] (ORCID:0000000304340670)↗

Design Challenges in High-Current Pulsed Striplines

The Long Baseline Neutrino Facility (LBNF) will produce the worlds most intense neutrino beam. Three series connected magnetic horns will require 5 kV, 300 kA, 800 $\mu$s pulses at a rate of 1.4 Hz to focus the beam. Connecting a single power supply to these focusing horns will require a low impedance connection measuring over 60 m in length. To meet the challenging requirements of connecting the horns to the power supply, this connection is engineered as a nine-conductor, high-current pulsed stripline. It must pass through a harsh radiation environment, be passively cooled, and have an operational lifetime of at least 30 years. This paper discusses mechanical and electrical considerations such as high-voltage holdoff, clamped joint performance, and Lorentz force mitigations in order to meet the specified requirements. The results of tests and experiments on several prototypes of key design features will be presented and discussed.

43 PARTICLE ACCELERATORS↗