Highly Specialized GSE Required for JWST Verification
Todays presentation will highlight development of the optical, mechanical, and thermal test systems for the OTIS cryotest
Engineering topics
Publications and source records attributed to Day, Robert L..
Todays presentation will highlight development of the optical, mechanical, and thermal test systems for the OTIS cryotest
In 2017, the combined Optical Telescope Element and Integrated Science Instrument Module (OTIS) of the James Webb Space Telescope (JWST) underwent functional testing and optical metrology verification under cryogenic vacuum conditions in Chamber A at the Johnson Space Center (JSC). Testing the infrared Science Instruments and OTIS optics below 50 degrees Kelvin required an environment architecture that comprehensively controlled the temperature and energy path of every seam and penetration in the over 1100 m2 of Chamber A helium shroud surfaces as well as the Ground Support Equipment (GSE) inside it. This paper outlines the design and implementation of thermal closeouts, thermal anchoring systems for electrical cables, and thermal control systems around room-temperature optical metrology equipment inside the helium shroud. It also details lessons learned from the repeated implementation and testing of these environmental control systems throughout the JWST Pathfinder test campaign.
In 2017, the James Webb Space Telescope (JWST) underwent functional testing and optical metrology verification of the combined Optical Telescope Element and Integrated Science Instrument Module (OTIS) under cryogenic vacuum conditions in Chamber A at the Johnson Space Center. Maintaining flight-like thermal boundary conditions was a critical requirement for optical testing and required unique and challenging Ground Support Equipment (GSE) design solutions. Two such GSE systems, the Integrated Science Instrument Module (ISIM) Precool Straps and the Hardpoint Struts were direct conduction interfaces to the flight hardware. Hardware safety during cooldown required detailed design of their conductivity, and thermal balance testing required zero-Q (0-Q) heater implementation to bring the heat flow to zero, thereby cutting off these non-flight conductive links after operating temperatures were achieved. This paper describes the design considerations and approach implemented to achieve the required flight hardware cool down and return to ambient conditions, ensure flight hardware safety, and minimize the non-flight-like heat flows to or from the observatory during cryo-stable testing.
In 2017, the combined Optical Telescope Element and Integrated Science Instrument Module (OTIS) of the James Webb Space Telescope (JWST) underwent functional testing and optical metrology verification under cryogenic vacuum conditions in Chamber A at the Johnson Space Center (JSC). Testing the infrared Science Instruments and OTIS optics below 50 K required an environment architecture that comprehensively controlled the temperature and energy path of every seam and penetration in the over 1100 sq m of Chamber A helium shroud surfaces as well as the Ground Support Equipment (GSE) inside it. This paper outlines the design and implementation of thermal closeouts, thermal anchoring systems for electrical cables, and thermal control systems around room-temperature optical metrology equipment inside the helium shroud. It also details lessons learned from the repeated implementation and testing of these environmental control systems throughout the JWST Pathfinder test campaign.
In 2017, the James Webb Space Telescope (JWST) underwent functional testing and optical metrology verification of the combined Optical Telescope Element and Integrated Science Instrument Module (OTIS) under cryogenic vacuum conditions in Chamber A at the Johnson Space Center. The ground support and test equipment developed and tested over the previous decade to facilitate this test event were crucial elements of its success. Ground systems required for this test fall into several groups, including thermal simulators, mechanical support hardware, telemetry systems, and metrology systems. This paper will provide a summary of these systems, their development challenges, key features, and highlight thermal performance in the cryovac test.