Improved resistive plate chambers for HL-LHC upgrade of CMS
Not Available
Engineering topics
Publications and source records attributed to De Filippis, N..
Not Available
Not Available
During Run2 the high instantaneous luminosity, up to 2.2 · 10 34 cm -2 s -1 , lead to a substantial hit rate in the Compact Muon Solenoid experiment’s muon chambers due to multiple background sources to physics processes sought for at LHC. In this article we will describe the analysis method devised to measure and identify the contributions to such background in the Resistive Plate Chambers. Thorough understanding of the background rates provides the base for the upgrade of the muon detectors for the High-Luminosity LHC.
During Run-3, the LHC is preparing to deliver instantaneous luminosity in the range from 5 × 10 34 cm -2 s -1 to 7.5 × 10 34 cm -2 s -1 . To ensure stable data taking, providing redundant information for robust muon triggering, reconstruction and identification, the CMS RPC collaboration has used the opportunity given by the LHC long shutdown 2 (LS2), to perform a series of maintenance and preparation activities for the new data taking period. The overall performance of the RPC system after the LS2 commissioning period and the activities in preparation for future data taking will be presented.
With the HL-LHC upgrade of the LHC machine, an increase of the instantaneous luminosity by a factor of five is expected and the current detection systems need to be validated for such working conditions to ensure stable data taking. At the CERN Gamma Irradiation Facility (GIF++) many muon detectors undergo such studies, but the high gamma background can pose a challenge to the muon trigger system which is exposed to many fake hits from the gamma background. A tracking system using RPCs is implemented to clean the fake hits, taking profit of the high muon efficiency of these chambers. This work will present the tracking system configuration, used detector analysis algorithm and results.