Search NASA⌕ Search

Engineering topics

De Robertis, G.

Publications and source records attributed to De Robertis, G..

Performance of the LHCb muon detector in Run 3

In Run 3 of the LHC, the instantaneous luminosity at the LHCb interaction point has been increased by a factor of five, from to $\mathscr{L}$ = 4 x 10 32 cm -2 s -2 to $\mathscr{L}$ = 2 x 10 33 cm -2 s -1 . Several hardware interventions, including a complete overhaul of the readout electronics, have been carried out on the muon detector. The muon identification algorithms in the software trigger were improved with the aim of ensuring Run 2 performance under a higher particle rate. The operation and calibration of the upgraded muon detector are presented. The muon detection efficiency and muon identification performance are evaluated on data calibration samples collected during the year 2024. A muon identification efficiency above 90% with sub-percent hadron misidentification probability is achieved by exploiting the pattern of hits in the muon detector.

Gaseous detectors↗

Performance of prototype GE1/1 chambers for the CMS muon spectrometer upgrade

The high-luminosity phase of the Large Hadron Collider (HL-LHC) will result in ten times higher particle background than measured during the first phase of LHC operation. In order to fully exploit the highly-demanding operating conditions during HL-LHC, the Compact Muon Solenoid (CMS) Collaboration will use Gas Electron Multiplier (GEM) detector technology. The technology will be integrated into the innermost region of the forward muon spectrometer of CMS as an additional muon station called GE1/1. The primary purpose of this auxiliary station is to help in muon reconstruction and to control level-1 muon trigger rates in the pseudo-rapidity region 1.6 ≤ |η| ≤ 2.2. The new station will contain trapezoidal-shaped GEM detectors called GE1/1 chambers. The design of these chambers is finalized, and the installation is in progress during the Long Shutdown phase two (LS-2) that started in 2019. Several full-size prototypes were built and operated successfully in various test beams at CERN. Here, we describe performance measurements such as gain, efficiency, and time resolution of these prototype chambers, developed after years of R&D, and summarize their behavior in different gas compositions as a function of the applied voltage.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Layout and assembly technique of the GEM chambers for the upgrade of the CMS first muon endcap station

Triple-GEM detector technology was recently selected by CMS for a part of the upgrade of its forward muon detector system as GEM detectors provide a stable operation in the high radiation environment expected during the future High-Luminosity phase of the Large Hadron Collider (HL-LHC). In a first step, GEM chambers (detectors) will be installed in the innermost muon endcap station in the 1.6<|η|<2.2 pseudo-rapidity region, mainly to control level-1 muon trigger rates after the second LHC Long Shutdown. These new chambers will add redundancy to the muon system in the η-region where the background rates are high, and the bending of the muon trajectories due to the CMS magnetic field is small. A novel construction technique for such chambers has been developed in such a way where foils are mounted onto a single stack and then uniformly stretched mechanically, avoiding the use of spacers and glue inside the active gas volume. We describe the layout, the stretching mechanism and the overall assembly technique of such GEM chambers.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗