Publications and source records attributed to DeNeale, Scott T..

Estimated capital costs of fish exclusion technologies for hydropower facilities

Hydropower is a reliable source of renewable energy, and its future expansion is likely to be in the form of either smaller new stream development (NSD) projects or powering existing non-powered dams. Thresholds for entrainment risk to fish and the requirements for fish exclusion at hydropower facilities often differ depending on the species involved, the characteristics of the facility, and the goals of stakeholders, but little quantitative information is present within the literature regarding the specific costs of fish exclusion measures. Cost data associated with protection, mitigation, and enhancement (PM&E) measures related to positive barrier screening were identified using keyword searches of an existing environmental mitigation cost data set and manual extraction from regulatory licensing documents available in the Federal Energy Regulatory Commission (FERC) eLibrary. This approach yielded a total of 50 p.m.&E mitigation measures with estimated capital construction costs pertaining to positive barrier screens and represented <10% of the 171 total FERC project dockets available in the data set. These data were highly skewed toward conventional relicensing projects, as <7% were associated with NSD projects. Results indicate highly variable costs are associated with fish screening, with flow-normalized costs one to two orders of magnitude higher for screening with the highest exclusion capability (≤0.09 in. spacing) compared with coarser screening (1–2 in.). These data provide an initial baseline for estimating exclusion costs for hydropower development and may help developers consider options for more fish-friendly generation technologies, though gaps remain relating to a lack of data, particularly for NSD projects.

13 HYDRO ENERGY↗

Cost of Fish Exclusion and Passage Technologies for Hydropower

Hydropower represents a reliable source of renewable energy and accounts for approximately 7% of the total electrical generation in the United States. Future expansion of hydropower is likely to be in the form of either smaller new stream development projects or powering existing non-powered dams. For these new projects to be successful, careful analysis of risks, costs, and uncertainty to offset reduced power production as well as ensuring the protection and safe passage of migratory fish to gain public support, will be required. Exclusion and passage are two common approaches to protect fish from entrainment and impingement at hydropower facilities. The thresholds for entrainment risk and requirements for exclusion and passage often differ depending on the species involved, the characteristics of the facility, and the goals of stakeholders. While the costs associated with environmental mitigations represent a large proportion of the total costs required for the licensing of hydropower facilities, little quantitative information is present within the literature regarding the specific costs of fish exclusion and passage. Working with FOA awardee Natel Energy, scientists at Oak Ridge National Laboratory were tasked with assessing the capital construction costs for downstream fish exclusion and passage infrastructure. This report used keyword searches of an existing environmental mitigation cost data set and manual extraction of additional cost data associated with protection, mitigation, and enhancement (PM&E) measures related to positive barrier screening and passage from regulatory licensing documents available in the Federal Energy Regulatory Commission (FERC) eLibrary. This approach yielded a total of 50 PM&E mitigation measures with estimated capital construction costs pertaining to positive barrier screens, 142 pertaining to passage studies, and 26 pertaining to passage-related studies. PM&E measures associated with positive barrier screens represented <10% of the 171 total FERC project dockets available in the data set. These data were highly skewed toward conventional relicensing projects, as <7% were associated with new stream development (NSD) projects. Results from these data indicate highly variable costs associated with fish screening, with flow-normalized costs one to two orders of magnitude higher for screening with the highest exclusion capability (≤0.09 in. spacing) compared with coarser screening (1 to 2 in.). Furthermore, estimated capital costs of passage infrastructure were positively related to the scale of the project based on installed capacity for some, but not all, types of passage. These data provide an initial baseline for estimating exclusion and passage costs for hydropower development and may help developers consider options for more fish-friendly generation technologies, though gaps remain relating to a lack of data, particularly for NSD projects. More data may still be available within the FERC eLibrary, but significant effort will be required to manually identify and extract the data for future analyses.

13 HYDRO ENERGY↗

Bayesian-Motivated Probabilistic Model of Hurricane-Induced Multimechanism Flood Hazards

Multimechanism floods (MMFs) are caused by the simultaneous occurrence of more than one flood mechanism such as storm surge, precipitation, tides, and waves. MMFs can lead to more severe or differing impacts than single-mechanism floods. As a result, comprehensive risk assessments require the ability to assess the multivariate probabilistic behaviors of hazards from MMFs. Here this study introduces a novel Bayesian-motivated approach for the probabilistic assessment of hurricane-induced hazards from the combination of the surge, precipitation, tides, and river antecedent flow. A Bayesian network (BN) is developed to capture the physical (conditional) relationship between variables and facilitate the generation of a hazard curve for river discharge that captures the contributions from multiple flood drivers. A case study located along the Delaware River is used to illustrate the proposed approach. Five computationally efficient representative predictive models are developed to estimate the conditional distributions required for the BN as a means of demonstrating the overall framework. The predictive models used in this study act as placeholders and can be replaced with more sophisticated and high-fidelity models depending on the desired accuracy level. While the predictive models are intended to be representative and illustrative, the model performance is evaluated using three historical storms that affected the area. Overall, the proposed framework is shown to be transparent, effective, and adaptable.

54 ENVIRONMENTAL SCIENCES↗

An Assessment of Hydropower Potential at National Conduits

In support of the mission of the US Department of Energy Water Power Technologies Office to promote domestic next-generation hydropower growth, this study provides a first-of-its-kind assessment of the hydropower development potential on existing water conduits nationwide. This study evaluates the potential for conduit hydropower development in the municipal, agricultural, and industrial sectors across the United States. The research team developed systematic methods to evaluate conduit hydropower capacity potential (MW) and energy generation potential (GWh/year) at four categories of conduits across the United States. They include the following: (1) Water supply pipelines for municipal and industrial uses, (2) Wastewater discharge conduits from municipal and industrial systems, (3) Agricultural water conduits including irrigation canals and ditches in the 17 western states that rely heavily on irrigation, and (4) Thermoelectric power plant cooling water discharge conduits. For each type of conduit, the team developed and implemented a method to estimate hydraulic head and annual water flows—and the hydropower potential—based on analyses of satellite imagery, topography, and existing data sets on water systems and power plants. These methods support a consistent, replicable estimate of conduit hydropower potential across 3 sectors and all 50 states, aggregated at the county and state levels. The assessment was conducted at the reconnaissance level, considering resources that could be available for development at the state and national levels using present-day assumptions about conduit hydropower technology.

13 HYDRO ENERGY↗

Hydropower Geotechnical Foundations: Current Practice and Innovation Opportunities for Low-Head Applications

Hydropower is a renewable energy resource that produces electricity from flowing water under pressure. Engineered hydropower structures, such as dams, are used to create a hydraulic head, enabling a turbinegenerator unit to convert pressurized flow into electricity. While hydropower has been a source of renewable energy since antiquity, new development in the United States has slowed in recent decades. Based on recent resource assessments, the largest opportunity to expand hydropower in the United States is from new stream-reach development (i.e., new hydropower development along stream-reaches that do not currently have hydroelectric facilities or other forms of infrastructure, such as dams). Roughly 75% of identified new stream-reach development potential is from low-head sites (less than 30 ft of head), which typically suffer from smaller power densities and higher normalized costs, given economies of scale. Hydropower developers and other stakeholders are thus interested in strategies to reduce initial capital costs while practicing sustainable development to maximize environmental compatibility with minimal disruption to natural aquatic life, sediment, and water flows. Historically, civil works have represented a significant cost driver for new hydropower development, with the foundation system representing a major cost component and source of uncertainty. The foundation system is the collection of engineered structural features (e.g. cutoff trenches, walls, grouting, anchors) constructed at or below the preconstruction ground surface that interfaces between the overlying structures (superstructures) and the bed material below (subsurface). Development of a hydropower foundation system must consider the various characteristics of the surrounding stream environment and subsurface while adhering to the engineering requirements of the superstructure that it supports. The care of water, excavation, and other construction activities are important features of foundation design and construction. The design and construction cost of the foundation system is largely dependent on the site geology and riverbed composition and is influenced by the level of geotechnical assessment required and conducted. Thus, a hydropower facility’s geotechnical foundation is often highly site-specific, with proper site selection and assessment being important to project success. The foundation system is designed to provide structural stability (of the foundation and dam), limit seepage, ensure public safety, and maintain functionality for the project life, during both construction and facility operations. Inadequate foundation or dam design can result in dam failure and the uncontrolled release of significant volumes of water, which could cause a high number of casualties and extensive property damage downstream of the failure. According to the Association of State Dam Safety Officials, approximately 30% of all historical dam failures in the United States are attributed to foundation or abutment defects, and another 20% are attributed to piping or seepage through the embankment, foundation, or abutment. To ameliorate these safety considerations, foundations often require massive amounts of construction material (e.g., grout, concrete, engineered dam fill) and long construction times. Foundation design also requires significant analysis prior to construction because the initial in-stream and abutment subsurface conditions are site-specific, and sufficient data for them often are lacking. Current practice requires on-site assessment, using expensive drilling and invasive and non-invasive investigation methods, to determine the expected cost of foundation material and treatment. Additionally, foundation construction often requires site dewatering (and other care of water activities), which involves constructing temporary diversion structures upstream and often downstream, called cofferdams, and water diversion systems that route water around the construction site. Cofferdams and water diversion systems can drastically increase construction costs and contribute to environmental disruption, including modification of flow patterns and benthic habitats. Given the technical, economic, and environmental challenges associated with hydropower foundations, opportunities exist to improve the current state of practice and to develop new and innovative solutions to Hydropower is a renewable energy resource that produces electricity from flowing water under pressure. Engineered hydropower structures, such as dams, are used to create a hydraulic head, enabling a turbinegenerator unit to convert pressurized flow into electricity. While hydropower has been a source of renewable energy since antiquity, new development in the United States has slowed in recent decades. Based on recent resource assessments, the largest opportunity to expand hydropower in the United States is from new stream-reach development (i.e., new hydropower development along stream-reaches that do not currently have hydroelectric facilities or other forms of infrastructure, such as dams). Roughly 75% of identified new stream-reach development potential is from low-head sites (less than 30 ft of head), which typically suffer from smaller power densities and higher normalized costs, given economies of scale. Hydropower developers and other stakeholders are thus interested in strategies to reduce initial capital costs while practicing sustainable development to maximize environmental compatibility with minimal disruption to natural aquatic life, sediment, and water flows. Historically, civil works have represented a significant cost driver for new hydropower development, with the foundation system representing a major cost component and source of uncertainty. The foundation system is the collection of engineered structural features (e.g. cutoff trenches, walls, grouting, anchors) constructed at or below the preconstruction ground surface that interfaces between the overlying structures (superstructures) and the bed material below (subsurface). Development of a hydropower foundation system must consider the various characteristics of the surrounding stream environment and subsurface while adhering to the engineering requirements of the superstructure that it supports. The care of water, excavation, and other construction activities are important features of foundation design and construction. The design and construction cost of the foundation system is largely dependent on the site geology and riverbed composition and is influenced by the level of geotechnical assessment required and conducted. Thus, a hydropower facility’s geotechnical foundation is often highly site-specific, with proper site selection and assessment being important to project success. The foundation system is designed to provide structural stability (of the foundation and dam), limit seepage, ensure public safety, and maintain functionality for the project life, during both construction and facility operations. Inadequate foundation or dam design can result in dam failure and the uncontrolled release of significant volumes of water, which could cause a high number of casualties and extensive property damage downstream of the failure. According to the Association of State Dam Safety Officials, approximately 30% of all historical dam failures in the United States are attributed to foundation or abutment defects, and another 20% are attributed to piping or seepage through the embankment, foundation, or abutment. To ameliorate these safety considerations, foundations often require massive amounts of construction material (e.g., grout, concrete, engineered dam fill) and long construction times. Foundation design also requires significant analysis prior to construction because the initial in-stream and abutment subsurface conditions are site-specific, and sufficient data for them often are lacking. Current practice requires on-site assessment, using expensive drilling and invasive and non-invasive investigation methods, to determine the expected cost of foundation material and treatment. Additionally, foundation construction often requires site dewatering (and other care of water activities), which involves constructing temporary diversion structures upstream and often downstream, called cofferdams, and water diversion systems that route water around the construction site. Cofferdams and water diversion systems can drastically increase construction costs and contribute to environmental disruption, including modification of flow patterns and benthic habitats. Given the technical, economic, and environmental challenges associated with hydropower foundations, opportunities exist to improve the current state of practice and to develop new and innovative solutions to challenges frequently encountered with traditional approaches. With this understanding, it is critically important to understand and document the current state of practice for hydropower geotechnical foundations, identify key challenges, and define opportunities for innovative solutions. To this end, this report documents the current state of practice across the three main phases of geotechnical foundation development: (1) geotechnical site assessment, (2) design, and (3) construction for hydropower systems. It also describes the major challenges with conventional approaches and identifies opportunities for innovation to reduce hydropower foundations costs, timelines, and risks. Key takeaways from this report include the following: Approximately 80% of available low-head sites are expected to have foundations on soil beds rather than rock beds, suggesting that rockfill and earthfill dams may be the most cost-effective conventional dam type for new projects.; Geotechnical and geologic investigation activities are time-consuming and expensive but are essential to define the parameters and criteria needed for foundation design.; Certain riverbed soil and bedrock types present significant technical challenges or require expensive foundation construction, which can prove financially prohibitive for low-head project development.; Modular hydropower design and prefabricated modular foundations represent a promising but unproven paradigm for new hydropower development. Design and construction approaches using optimized and highly repeatable, reliable components would benefit project cost, time, and risk but require additional research and development.; Temporary construction features for foundations, including cofferdams, water diversion, and water control systems, can prove costly and have inherent construction risk.; For economically viable development, hydropower geotechnical foundations should be limited to 4 to 15% of the project’s total initial capital costs. Many proposed projects have experienced cost overruns attributable to foundation difficulties or surprises during construction. These overruns may have been due to inadequate investigations, lack of adequate engineering effort to tailor the structures to site geology and topography, and/or contractual terms, among other considerations.; Challenges for hydropower foundations and opportunities for innovative technology solutions are identified in the following areas (consistent with the three main phases of foundation development): Geotechnical site assessment, Foundation design and materials, Construction methods and technology. Ultimately, this report aims to provide information about geotechnical foundations for low-head hydropower and to motivate transformative technologies to support hydropower growth.

13 HYDRO ENERGY↗

Multi-Mechanism Flood Hazard Assessment: Critical Review of Current Practice and Approaches

This report documents the initial findings from the Nuclear Regulatory commission (NRC)-sponsored research project Methods for Estimating Joint Probabilities of Coincident and Correlated Flooding Mechanisms for Nuclear Power Plant Flood Hazard Assessments.¹ This research project is a part of NRC’s Probabilistic Flood Hazard Assessment (PFHA) Research Program and will aid the development of guidance on the use of PFHA methods to evaluate infrastructure safety for existing and proposed US nuclear power plants (NPPs). More specifically, this project intends to provide technical background for the development of flood hazard curves for multi-mechanism floods (MMFs). MMFs are flood events caused by more than one flooding mechanism (e.g., flood events due to the simultaneous occurrence of precipitation-induced river flooding and storm surge).

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Current State-of-Practice in Dam Safety Risk Assessment

Dams provide significant benefits to the nation, serving as critical infrastructure to deliver water retention and control throughout the United States (US). Major cities could not function without the fresh water supply stored in dammed reservoirs, and many electrical systems rely on dependable hydroelectric power supply. Dams on rivers across the country protect communities against destructive flood impacts while providing navigable waters for transportation, irrigation for agriculture, and various opportunities for recreation. While dams provide many essential services, dam failure flooding can present significant risks to property and life. Over decades of experience, dam safety practices, including risk assessment, have evolved as engineering knowledge, scientific understanding, and technological advancements grow. This project summarizes the current state-of-practice in dam safety risk assessment.

13 HYDRO ENERGY↗