Launch Complex 39A, SWMU 008 2023 Long-Term Monitoring Report Kennedy Space Center, Florida

The 2023 Long-Term Monitoring (LTM) Report (LTMR) presents the annual and semi-annual groundwater monitoring results for Launch Complex 39A (LC39A), Solid Waste Management Unit (SWMU) 008, at Kennedy Space Center (KSC), Florida. The reporting period covered under this LTMR is from January to December 2023, and represents the first year of site-wide monitoring following Air Sparge (AS) system shutdown at the end of 2022. AS system operation at LC39A began operation in 2015. The AS system consisted of a total of 173 AS wells ranging in depth from 11 to 37 feet below land surface. The overall remedial objective for the AS Interim Measure was to actively decrease concentrations of COCs to less than their respective Florida Department of Environmental Protection Natural Attenuation Default Concentrations, so that LC39A can transition into an LTM program. This objective was achieved in 2022, with 2023 marking Year 1 of the LTM program to monitor the residual groundwater plume. VOC results indicate that COC concentrations have continued to decrease or stabilize, with no rebound observed since AS system shutdown. Vinyl chloride was the only COC detected above its GCTL, with the highest concentration detected at 8.0 μg/L. PFAS results detected 15 different PFAS compounds (out of 32 analyzed) between the six monitoring wells sampled. Two PFAS compounds, perfluorooctanesulfonic acid (PFOS) and perfluorooctanoic acid (PFOA), currently have FDEP Provisional GCTLs of 70 nanograms per liter (ng/L). PFOS was detected in one of the six samples above the FDEP Provisional GCTL at a concentration of 200 ng/L. PFOA was not detected above the FDEP Provisional GCTL in any of the six samples. PFOS and PFOA also currently have United States Environmental Protection Agency (USEPA) Maximum Contaminant Levels (MCLs) of 4 ng/L. PFOS was detected in all six samples above the USEPA MCL. PFOA was detected in three of the six samples above the USEPA MCL. Three other PFAS compounds, perfluorohexanesulfonic acid (PFHxS), perfluoro-n-nonanoic acid (PFNA), and hexafluoropropylene oxide dimer acid (GenX), currently have USEPA MCLs of 10 ng/L. PFHxS, PFNA, and GenX were not detected at concentrations greater than their respective USEPA MCLs in any of the six wells. Additional PFAS sampling will occur as part of a PFAS Site Assessment to be conducted in the future. Based on Year 1 LC39A LTM results, recommendations for 2024 are to continue with the second year of LTM in 2024 with the same monitoring well network as Year 1 (18 wells). The three wells that were on a semi-annual schedule will transition to an annual schedule to align with the remaining wells. The next annual event is scheduled for May 2024. The three wells that were found to be inadvertently destroyed will be properly abandoned and a replacement well in the vicinity of former monitoring well 21ST-MW0030I will be installed. This new well will be added to the LTM sampling plan upon installation.

Deborah M. Wilson↗

Launch Complex 39B, SWMU 009 Air Sparging System Expansion Implementation Work Plan Kennedy Space Center, Florida

This Implementation Work Plan (IWP) for expansion of the Air Sparging (AS) system at Launch Complex 39B (LC39B), presents the design and coordination specifics to expand the existing AS Interim Measure (IM) at LC39B located at Kennedy Space Center (KSC), Florida. The existing AS system at LC39B was installed in 2017 and included 279 AS wells. LC39B has been designated as Solid Waste Management Unit (SWMU) 009 under the KSC Resource Conservation and Recovery Act (RCRA) Corrective Action Program. Expansion of the AS IM will include installation of an additional five AS wells to depths of approximately 13 and 17 feet below land surface (bls) to remediate contaminated groundwater identified northwest of the launch pad, near the liquid oxygen (LOX) tank. The expansion will target concentrations of cis-1,2-dichloroethene (cDCE) and vinyl chloride (VC) greater than Florida Department of Environmental Protection (FDEP) Natural Attenuation Default Concentrations (NADCs) that were identified during direct push technology (DPT) sampling events between 2019-2022 in shallow intervals between 8 and 16 feet bls. The objective for this expansion is to remediate contaminated groundwater within the treatment zone to below NADCs to support transition to monitored natural attenuation (MNA) through a long-term monitoring (LTM) program. This expansion will treat approximately 0.07-acres of residual groundwater contamination. The IWP design for this expansion will utilize the existing AS system trailer that is already onsite and operating. The five new AS expansion wells will be integrated into the existing Zone Z4 distribution manifold to deliver compressed air to the new AS wells. To deliver airflow, three existing lateral lines will be split in the field at a lateral split junction point (using 2-way or 3-way splits). Each split lateral will supply air to AS wells at the same depth interval to minimize preferential pathways. The trenching layout for the new AS wells was developed to minimize ground disturbance due to the amount of utilities in the area. One new monitoring well will also be installed and added to LC39B’s performance monitoring program to evaluate the effectiveness of the AS system expansion. This well will be sampled on a semi-annual basis for volatile organic compounds, with results evaluated to determine if system adjustments may be required. The main components of this IWP were presented to the KSC Remediation Team (KSCRT) at the October 2022 Meeting (Meeting 2210-M05). DPT delineation data from the LOX area were also presented, which included some inferred boundaries due to physical restrictions of the LOX tank and associated concrete pad and infrastructure. Planned monitoring well sampling in this area will help determine if back-diffusion may be occurring from beneath the pad. Additionally, based on potential petroleum odors and staining identified at two DPT locations during the January 2022 DPT event in the 10-16 feet bls range, a KSCRT action item was assigned during the October 2022 meeting to collect soil samples for petroleum compounds if similar odors or staining are identified during IM implementation. Construction completion and performance monitoring will be incorporated into LC39B’s groundwater monitoring reports, which are currently submitted on an annual basis to FDEP to document operation and maintenance activities and results from the AS IM.

Deborah M. Wilson↗

KSC Headquarters Building Area SWMU 104 Soil Interim Measure Report for LOC 2D and LOC 2E Kennedy Space Center, Florida

This Interim Measure (IM) Report for Location of Concern (LOC) 2D and LOC 2E summarizes the activities associated with implementation of an IM to address soil and concrete contamination at the Kennedy Space Center (KSC) Headquarters Building Area (KHQA) located at KSC, Florida. KHQA has been designated Solid Waste Management Unit (SWMU) 104 under KSC’s Resource Conservation and Recovery Act Corrective Action Program. The IM consisted of excavating/removing residual polychlorinated biphenyl (PCB) contamination in soil and concrete from two separate areas, LOC 2D and LOC 2E, which were associated with electrical transformer locations. IM activities were conducted in accordance with the Interim Measure Work Plan (IMWP), Revision 1, for KHQA dated June 2018, which was approved by the Florida Department of Environmental Protection in a correspondence letter dated April 2016 and the United States Environmental Protection Agency in a correspondence letter dated August 2018. The objective of the IM was to remove all remaining contaminated media with total PCB concentrations greater than the State of Florida Residential Soil Cleanup Target Level (RSCTL) (0.5 milligrams per kilogram [mg/kg]). This cleanup goal meets unrestrictive re-use conditions in Florida, and is below federal regulations for PCB Bulk Remediation Waste Cleanup of 1 mg/kg for high occupancy, unrestricted use areas, as outlined in 40 Code of Federal Regulations (CFR) 761.61(a). The timeline of the IM was coordinated with demolition of the former KSC Headquarters Building (demolished in 2021) in order to safely remove contaminated media after electrical equipment was de-energized and removed from the site. Excavation activities were conducted between January 10, 2022, and February 8, 2022, and included two waste streams for off-site disposal: (1) PCB-remediation waste greater than or equal to 50 mg/kg, and (2) PCB-remediation waste less than 50 mg/kg. A total of approximately 347 cubic yards (478 tons) of PCB-contaminated soil and concrete was initially removed from the LOC 2D and LOC 2E areas, as defined in the IMWP. An additional 4.35 tons of soil and concrete were removed based on verification sampling, which was conducted until the cleanup goal was achieved. The total area of excavation from both LOC 2D and LOC 2E was approximately 5,186 square feet (0.12 acres), and excavation depths ranged from 0.5 to 4.0 feet below land surface Excavated soils and concrete were stockpiled based on waste stream and subsequently transported and disposed of at Waste Connections of Osceola County, LLC – JED Landfill in St. Cloud, Florida (PCBs less than 50 mg/kg) or the Chemical Waste Management Landfill in Emelle, Alabama (PCBs greater than or equal to 50 mg/kg). Following excavation, clean backfill was brought to the site and provided to the Demolition Contractor to complete backfill and grading in conjunction with their final site restoration activities from building demolition. Post-IM groundwater sampling was conducted in May 2022 at three monitoring wells installed in April 2022 to confirm that PCBs did not leach into groundwater. These wells were installed where the highest PCB concentrations were detected at LOC 2D, LOC 2E, and from the Building Perimeter IM (previously completed in 2020). All PCB results in groundwater were non-detect. Volatile organic compounds were also analyzed based on potential past use of solvents in transformers with PCB-dielectric fluids and the potential release of dielectric fluids containing volatile organic compounds, and all results were non-detect. Based on completion of a successful IM at LOC 2D and LOC 2E, as well as previous remedial actions that have addressed other contamination at KHQA (SWMU 104), No Further Action without controls will be recommended for SWMU 104. NASA will submit separate Site Rehabilitation Completion Order request documentation for SWMU 104 to support an NFA without controls recommendation.

PCB↗