Publications and source records attributed to Delgado, Hector N..

Transforming a Single-Use Spaceport to Multi-Use

The end of the Space Shuttle program brought new challenges as well as new opportunities to the John F. Kennedy Space Center. The challenge is to engineer a more flexible Spaceport to be capable of supporting manufacturing, assembly, testing, processing and launch operations for multiple spacecrafts and launch vehicle configurations. The new spaceport must support multiple commercial as well as government entities while leveraging existing infrastructure to the greatest extent possible. This paper addresses key engineering challenges during Spaceport design and development and will look at possible engineering solutions while considering reusability of legacy systems and infrastructure adaptability with emphasis on flexibility and reduction of operating cost.

Delgado, Hector N.↗

Adapting New Space System Designs into Existing Ground Infrastructure

As routine space operations extend beyond earth orbit, the ability for ground infrastructures to take on new launch vehicle systems and a more complex suite of spacecraft and payloads has become a new challenge. The U.S. Vision for Space Exploration and its Constellation Program provides opportunities for our space operations community to meet this challenge. Presently, as new flight and ground systems add to the overall groundbased and space-based capabilities for NASA and its international partners, specific choices are being made as to what to abandon, what to retain, as well as what to build new. The total ground and space-based infrastructure must support a long-term, sustainable operation after it is all constructed, deployed, and activated. This paper addresses key areas of engineering concern during conceptual design, development, and routine operations, with a particular focus on: (1) legacy system reusability, (2) system supportability attributes and operations characteristics, (3) ground systems design trades and criteria, and (4) technology application survey. Each key area explored weighs the merits of reusability of the infrastructure in terms of: engineering analysis methods and techniques; top-level facility, systems, and equipment design criteria; and some suggested methods for making the operational system attributes (the "-ilities") highly visible to the design teams and decisionmakers throughout the design process.

ground system↗

Results of a NASA Kennedy Space Center Earned Value Management Pilot Project

The Earn Value Management Pilot provided a tremendous amount of data on the strengths and weaknesses of the new financial system, the ability to support EVM from many viewpoints, the lack of tools for small to medium projects implementing EVM, and the training and environment necessary to successfully deploy EVM to all projects. This data along with other pilots will prove invaluable. Deploying EVM should not be taken lightly - a full assessment of capabilities and supporting infrastructure should be done prior to any deployment, and some very basic questions should be asked. For instance, will sufficient training be provided? Can the project managers readily and easily obtain all the necessary data? If EVM is to thrive in all projects regardless of cost, the transition should be as seamless as possible, minimizing cost and effort, and with the end user in mind. In setting up an EVM implementation, the question, "How does the project manager benefit from this process?" must remain at the forefront. Further research in this area is needed to answer the question,"Is EVM cost effective in small projects?" The authors welcome knowledge sharing with other organizations that are striving to gain the benefits of EVM on small projects.

Delgado, Hector N.↗