Search NASA⌕ Search

Engineering topics

Denton, Caleb

Publications and source records attributed to Denton, Caleb.

The High Rigidity Spectrometer at the FRIB: Magnet Development Status

This paper presents the 2025 progress of the High Rigidity Spectrometer (HRS) project at the Facility for Rare Isotope Beams (FRIB). We report on the construction and testing of the first-article HRS-High Transmission BeamLine (HTBL) magnets. An HTBL dipole magnet has successfully completed cold testing, achieving full magnetic performance without quenching, and is now ready for field mapping at FRIBs offline test bench. HTBL quadrupole triplet coils have been fabricated and tested, with all coils reaching their design currents, some following initial training quenches. Furthermore, the preliminary design of the large-scale, large-aperture SPectrometer Section (SPS) magnets has progressed to determine the baseline of the downstream HRS-SPS subproject in 2025. This includes the introduction of novel magnet designs, such as the sweeper dipole magnet, the sector dipole magnet, and iron-free coil-dominated quadrupole magnets, representing a significant scale breakthrough and a first for FRIB.

Choi, Yoonhyuck↗

Successful cleanroom installation of PIP-II SSR2 coupler using robotic arm

To minimize the contamination of SRF cavities, remote installation techniques are needed during the installation of components. Recent work at Fermilab has been performed to begin the process of developing techniques for assembling cavities using robotics. Multiple alignment methods were prototyped including alignment and computer vision methods. Using a remotely controlled robotic arm, the alignment and installation of couplers have been successfully performed on prototype PIP-II SSR2 cavities in a cleanroom. The installation process will be shown to show to demonstrate the potential of future installations on other cavities and cavity ancillaries.

43 PARTICLE ACCELERATORS↗

Standardization of Ancillary Installation Tooling for SRF Cavities at Fermilab

For assemblies of cavities in cleanrooms, single-use tooling systems are made for the alignment and installation of ancillary components such as couplers and bellows. To try and minimize the amount of tooling sets used, a design has been created to standardize alignment features to allow for assembly of different components with one set of tooling. A prototype set of tooling has been developed to with the required degrees of freedom for multiple assemblies while minimizing deformation during the assembly process. Prototype designs have been created for PIP-II SSR2 and 650 Cavities and for AUP Crab Cavities. Using 3D printing, this tooling can be quickly adjusted to allow for different ancillary components. The development process and status of the design will be discussed.

Narug, Colin↗