Search NASASearch

Engineering topics

Deshpande, G. K.

Publications and source records attributed to Deshpande, G. K..

Rail transit fare collection: Policy and technology assessment

The impact of fare policies and fare structure on the selection of equipment was investigated, fare collection systems are described, hardware and technology related problems are documented, and the requirements of a fare collection simulation model are outlined. Major findings include: (1) a wide variation in the fare collection systems and equipment, caused primarily by historical precedence; (2) the reliability of AFC equipment used at BART and WMATA discouraged other properties from considering use of similar equipment; (3) existing equipment may not meet the fare collection needs of properties in the near future; (4) the cost of fare collection operation and maintenance is high; and (5) the relatively small market in fare collection equipment discourages new product development by suppliers. Recommendations for fare collection R&D programs include development of new hardware to meet rail transit needs, study of impacts of alternate fare policies increased communication among policymakers, and consensus on fare policy issues.

Deshpande, G. K.

Escalator design features evaluation

Escalators are available with design features such as dual speed (90 and 120 fpm), mat operation and flat steps. These design features were evaluated based on the impact of each on capital and operating costs, traffic flow, and safety. A human factors engineering model was developed to analyze the need for flat steps at various speeds. Mat operation of escalators was found to be cost effective in terms of energy savings. Dual speed operation of escalators with the higher speed used during peak hours allows for efficient operation. A minimum number of flat steps required as a function of escalator speed was developed to ensure safety for the elderly.

Zimmerman, W. F.

Evaluation of ADAM/1 model for advanced coal extraction concepts

Several existing computer programs for estimating life cycle cost of mining systems were evaluated. A commercially available program, ADAM/1 was found to be satisfactory in relation to the needs of the advanced coal extraction project. Two test cases were run to confirm the ability of the program to handle nonconventional mining equipment and procedures. The results were satisfactory. The model, therefore, is recommended to the project team for evaluation of their conceptual designs.

Deshpande, G. K.