Search NASA⌕ Search

Engineering topics

Di Carlo, S.

Publications and source records attributed to Di Carlo, S..

Technological developments and accelerator improvements for the FRIB beam power ramp-up

The Facility for Rare Isotope Beams (FRIB) began operation with 1 kW beam power for scientific users in May 2022 upon completion of 8 years of project construction. The ramp-up to the ultimate beam power of 400 kW, planned over a 6-year period, will enable the facility to reach its full potential for scientific discovery in isotope science and applications. In December 2023, a record-high beam power of 10.4 kW uranium was delivered to the target. Technological developments and accelerator improvements are being made over the entire facility and are key to completion of the power ramp-up. Major technological developments entail the phased deployment of high-power beam-intercepting systems, including the charge strippers, the charge selection systems, the production target, and the beam dump, along with support systems, including non-conventional utilities (NCU) and remote handling facilities. Major accelerator improvements include renovations to aging legacy systems associated with experimental beam lines and system automation for improved operational efficiency and better machine availability. Experience must be gained to safely handle the increased radiological impacts associated with high beam power; extensive machine studies and advanced beam tuning procedures are needed to minimize uncontrolled beam losses for the desired operating conditions. This paper discusses the technological developments and accelerator improvements with emphasis on major R&D efforts.

43 PARTICLE ACCELERATORS↗

Measurements of beam backgrounds in SuperKEKB Phase 2

The high design luminosity of the SuperKEKB electron-positron collider will result in challenging levels of beam-induced backgrounds in the interaction region. Understanding and mitigating these backgrounds is critical to the success of the Belle II experiment. We report on the first background measurements performed after roll-in of the Belle II detector, utilizing both the BEAST II system of dedicated background sensors and the Belle II detector itself. Here we also report on first revisions to the background simulation made in response to our findings. Backgrounds measured include contributions from synchrotron radiation, beam-gas, Touschek, and injection backgrounds. At the end of Phase 2, single-beam backgrounds originating from the 4 GeV positron Low Energy Ring (LER) agree reasonably well with simulation, while backgrounds from the 7 GeV electron High Energy Ring (HER) are approximately one order of magnitude higher than simulation. We extrapolate these backgrounds forward and conclude it is safe to proceed to installation of the Belle II vertex detector.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Measurement of the integrated luminosity of the Phase 2 data of the Belle II experiment

From April to July 2018, a data sample at the peak energy of the Υ(4S) resonance was collected with the Belle II detector at the SuperKEKB electron-positron collider. This is the first data sample of the Belle II experiment. Using Bhabha and digamma events, we measure the integrated luminosity of the data sample to be (496.3±0.3±3.0)pb –1 , where the first uncertainty is statistical and the second is systematic. This work provides a basis for future luminosity measurements at Belle II.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗