Search NASA⌕ Search

Engineering topics

DiMarco, Joseph

Publications and source records attributed to DiMarco, Joseph.

Challenges and Lessons Learned From Fabrication, Testing, and Analysis of Eight MQXFA Low Beta Quadrupole Magnets for HL-LHC

By the end of October 2022, the US HL-LHC Accelerator Upgrade Project (AUP) had completed fabrication of ten MQXFA magnets and tested eight of them. The MQXFA magnets are the low-beta quadrupole magnets to be used in the Q1 and Q3 Inner Triplet elements of the High Luminosity LHC. This AUP effort is shared by BNL, Fermilab, and LBNL, with strand verification tests at NHMFL. An important step of the AUP QA plan is the testing of MQXFA magnets in a vertical cryostat at BNL. The acceptance criteria that could be tested at BNL were all met by the first four production magnets (MQXFA03-MQXFA06). Subsequently, two magnets (MQXFA07 and MQXFA08) did not meet some of the criteria and were disassembled. Furthermore, lessons learned during the disassembly of MQXFA07 caused a revision to the assembly specifications that were used for MQXFA10 and subsequent magnets. In this article, we present a summary of 1) the fabrication and test data for all the MQXFA magnets; 2) the analysis of MQXFA07/A08 test results with characterization of the limiting mechanism; 3) the outcome of the investigation, including the lessons learned during MQXFA07 disassembly; and 4) the finite element analysis correlating observations with test performance.

75 CONDENSED MATTER PHYSICS, SUPERCONDUCTIVITY AND↗

Fabrication of the Fermilab Pre-Series Cold Mass for the HL-LHC Accelerator Upgrade Project

Fermilab is fabricating ten full length cold masses for the high-luminosity Large Hadron Collider Accelerator Upgrade Project (HL-LHC AUP). One practice assembly and one pre-series assembly have been completed. Here this paper summarizes the construction details. Topics include incoming inspection, bus assembly, component machining, shell forming, beam tube insertion, bus expansion loop installation, instrumentation installation, electrical testing, heat exchanger installation and final assembly welding. In-process surveys, alignment measurements and testing are presented and explained. Problems encountered during construction and their solutions are discussed.

43 PARTICLE ACCELERATORS↗

A New PCB Rotating Coil at NSLS-II

Several R&D projects are underway at NSLS-II towards an upgrade of its storage ring with a new lattice that will use high field magnets with small bores of 16-22 mm. A large fraction of the high field magnets are expected to be of permanent magnet technology that will require precise magnetic measurements and field harmonics corrections. A new magnetic measurement bench has been built based on a printed circuit board (PCB) coil of 12 mm diameter and 270 mm active length. This PCB coil has the capabil-ity of measuring field quality to a level of 10 ppm of the main field up to the 15th harmonic with a sensitivity between 0.01 m2 and 0.02 m2 at the reference radius of 5 mm. This paper will describe the main features of the rotating coil bench and discuss the measurement results of a permanent-magnet Halbach quadrupole of 12.7 mm bore diameter.

43 PARTICLE ACCELERATORS↗

A New Magnetic Measurement System for the Future Low Emittance NSLS-II Storage Ring

A new magnetic measurement system is under construc-tion at BNL for accurate field harmonic measurements and fiducialization of magnets for a future upgrade of the NSLS- II storage ring. The entire storage ring is envi-sioned to be replaced with a new lattice concept, known as Complex Bend, which superimposes dipole and high-gradient quadrupole fields. The magnetic measurement system will use rotating wire and a PCB rotating coil specifically designed for small-aperture (< 15 mm) high gradient magnets. In this paper we describe in detail the mechanical design and the data acquisition hardware and software.

43 PARTICLE ACCELERATORS↗

Lessons Learned From the Prototypes of the MQXFA Low-Beta Quadrupoles for HL-LHC and Status of Production in the US

With the successful test of the first two pre-series magnets the US HL-LHC Accelerator Upgrade Project has started production of the MQXFA magnets to be used in Q1/Q3 inner triplet elements of the HL-LHC. This good start comes after the test of two prototypes with limited performance, and it demonstrates the importance of learning from past issues. Therefore, in this paper we want to share the most important lessons learned so far, focusing on those which may be more interesting for similar projects. Additionally, we will present the status of MQXFA fabrication in the US.

43 PARTICLE ACCELERATORS↗

Development and performance of a 2.9 Tesla dipole magnet using high-temperature superconducting CORC® wires

Although the high-temperature superconducting (HTS) REBa 2 Cu 3 O x (REBCO, RE-rare earth elements) material has a strong potential to enable dipole magnetic fields above 20 T in future circular particle colliders, the magnet and conductor technology needs to be developed. As part of an ongoing development to address this need, here we report on our CORC® canted cosθ magnet called C2 with a target dipole field of 3 T in a 65 mm aperture. The magnet was wound with 70 m of 3.8 mm diameter CORC® wire on machined metal mandrels. The wire had 30 commercial REBCO tapes from SuperPower Inc. each 2 mm wide with a 30 µm thick substrate. The magnet generated a peak dipole field of 2.91 T at 6.290 kA, 4.2 K. The magnet could be consistently driven into the flux-flow regime with reproducible voltage rise at an engineering current density between 400-550 A mm -2 , allowing reliable quench detection and magnet protection. The C2 magnet represents another successful step towards the development of high-field accelerator magnet and CORC® conductor technologies. The test results highlighted two development needs: continue improving the performance and flexibility of CORC® wires and develop the capability to identify locations of first onset of flux-flow voltage.

75 CONDENSED MATTER PHYSICS, SUPERCONDUCTIVITY AND↗

The Application of Coordination to Magnetic Measurement Automation: An SSW System Example

Magnetic measurements are an integral part of the development cycle of accelerator magnets, a part which provides necessary feedback to drive design and manufacturing improvements and corrections. Automation of these measurements allows for reduction of human errors and reproducibility of measurements. Realization of automation via coordination that is separated at the architectural level from the functional code provides flexibility in defining measurement procedures and substantial extensibility. The described Single Stretched Wire (SSW) system herein is an implementation of such a solution with the use of a component-based framework designed to build a family of measurement systems.

43 PARTICLE ACCELERATORS↗

First Field Measurements of the 15 T Nb 3 Sn Dipole Demonstrator MDPCT1

Within the US Magnet Development Program (MDP) a 15 T Nb 3 Sn dipole was developed, to demonstrate a magnet design for a post-LHC pp Collider. Specifically, the magnet design is based on 60 mm aperture 4-layer shell-type coils, graded between the inner and outer layers to maximize the magnet performance. The cable in the two innermost layers has 28 strands 1.0 mm in diameter and the cable in the two outermost layers has 40 strands 0.7 mm in diameter. Both cables use RRP Nb3Sn wires produced by Bruker-OST. Magnet coils are surrounded by vertically-split thick iron laminations, con-nected by aluminum I-clamps, and a thick stainless-steel skin. The magnet was tested at the Vertical Magnet Test Facility (VMTF) at Fermilab. This paper reports the first results of magnetic measure-ments of the 15 T Nb 3 Sn dipole demonstrator including geometrical harmonics, coil magnetization and iron saturation effects. The ex-perimental data are compared with the magnetic calculations.

43 PARTICLE ACCELERATORS↗