Search NASA⌕ Search

Engineering topics

Ding, X

Publications and source records attributed to Ding, X.

50 records · Page 3

SU-E-T-340: Use of Intensity Modulated Proton Therapy (IMPT) for Reducing the Dose to Cochlea in Craniospinal Irradiation (CSI) of Pediatric Patients

Purpose: To evaluate use of intensity modulated proton therapy (IMPT) and number of beams for sparing cochlea in treatment of whole brain for pediatric medulloblastoma patients. Methods: In our institution, craniospinal irradiation patients are treated in supine position on our proton gantries using pencil beam scanning with each beam uniformly covering the target volume (SFUD). Each treatment plan consists of two opposed lateral whole brain fields and one or two spinal fields. For sparing the cochlea for the whole brain treatment, we created three different plans using IMPT for five pediatric patients. The first plan consisted of two lateral fields, the second two lateral fields and a superior-inferior field, and the third two lateral fields and two superior oblique fields. Optimization was performed with heavy weights applied to the eye, lens and cochlea while maintaining a dose prescription of 36 Gy to the whole brain. Results: IMPT plans reduce the dose to the cochlea. Increasing the number of treatment fields was found to lower the average dose to the cochlea: 15.0, 14.5 and 12.5 Gy for the two-field, three-field, and four-field plans respectively. The D95 for the two-field plan was 98.2%, compared to 100.0% for both the three-field and four-field plan. Coverage in the mid-brain was noticeably better in the three- and four-field plans, with more dose conformality surrounding the cochlea. Conclusion: IMPT plans for CSI and the whole brain irradiations are capable of sparing cochlea and reduce the dose considerably without compromising treating brain tissues. The reduction in average dose increases with three and four field plans as compared to traditional two lateral beam plans.

60 APPLIED LIFE SCIENCES↗

SU-E-T-474: IMRT Verification Using the On-Board EPID

Purpose: To verify IMRT and Rapid Arc (RA) plan's agreement with treatment delivery for radiation therapy using an on-board EPID compared to MapCHECK2 and ArcCHECK. Methods: On-board EPID (Exact arm) is commissioned using manufacturer's Preconfigured Data Input Package (PDIP). Portal dose calculation engine for comparison with measurement was commissioned with PDIP. The absolute dosimetric calibration of the EPID is performed using 10×10cm field size at 105cm source to image detector distance with 90.7 CU in the integrated mode. The dark and flood field of EPID were also calibrated in the integrated mode for all energies and dose rates. The output dose-response data from the manufacturer was verified. The improved gamma test method was used for EPID data analysis. Gamma test were used for MapCHECK2 (or ArcCHECK). The sensitivity of the method was tested using collimator rotation at 3 degree and 5 degree. Student T-test was used to distinguish the difference among the groups. Results: IMRT: The average of Gamma passing rate using EPID and MapCHECK2 is 98.9±1.6% and 98.7±2.0% (p = 0.342). There is no statistical difference between two groups.RA: The average of Gamma passing rate using EPID and ArcCHECK is 97.2±2.3% and 93.2±4.1%. (p = 0.002). EPID significantly improved the RapidARC plan passing rate compared to the ArcCHECK. 5% dose change typically causes between 3 – 55% change in Gamma. Conclusion: Using the EPID, we were able to perform QA verification on IMRT plans comparable to MapCHECK2 (p=0.342) and superior to that of ArcCHECK (p=0.002) using Gamma 3%, 3mm criteria. The sensitivity of EPID was found to be comparable to that of the MapCHECK2 and ArcCHECK. EPID dosimetry is faster (4.3 mins vs. 10 mins) due to easier setup and integrated data processing.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Mercury Handling for the Target System for a Muon Collider

The baseline target concept for a Muon Collider or Neutrino Factory is a free-stream mercury jet being impacted by an 8-GeV proton beam. The target is located within a 20-T magnetic field, which captures the generated pions that are conducted to a downstream decay channel. Both the mercury and the proton beam are introduced at slight downward angles to the magnetic axis. A pool of mercury serves as a receiving reservoir for the mercury and a dump for the unexpended proton beam. The impact energy of the remaining beam and jet are substantial, and it is required that splashes and waves be controlled in order to minimize the potential for interference of pion production at the target. Design issues discussed in this paper include the nozzle, splash mitigation in the mercury pool, the mercury containment vessel, and the mercury recirculation system.

43 PARTICLE ACCELERATORS↗

Status of Studies of Achromat-based 6D Ionization Cooling Rings for Muons

Six dimensional ionization cooling of muons is needed to achieve the necessary luminosity for a muon collider. If that cooling could occur over multiple turns in a closed ring, there would be significant cost savings over a single-pass cooling channel. We report on the status of a cooling ring with achromatic arcs. The achromatic design permits the design to easily switch between a closed ring and a snaking geometry on injection or extraction from the ring. The ring is designed with sufficient space in each superperiod for injection and extraction magnets. We describe the ring's lattice design, performance, and injection/extraction requirements.

43 PARTICLE ACCELERATORS↗

6D mu (+/-) cooling using a solenoid-dipole ring cooler for a muon collider

Six dimensional cooling of large emittance {mu}{sup +} and {mu}{sup -} beams is required in order to obtain the desired luminosity for a muon collider. We propose to use a ring cooler that employs both dipoles and solenoids with the additional requirement that the arcs of the ring be achromatic. We describe the lattice and the beam dynamics of the proposed ring, and demonstrate that the lattice gives substantial cooling in all 6 phase space dimensions.

43 PARTICLE ACCELERATORS↗

Optimized Parameters for a Mercury Jet Target

A study of target parameters for a high-power, liquid mercury jet target system for a neutrino factory or muon collider is presented. Using the MARS code, we simulate particle production initiated by incoming protons with kinetic energies between 2 and 100 GeV. For each proton beam energy, we maximize production by varying the geometric parameters of the target: the mercury jet radius, the incoming proton beam angle, and the crossing angle between the mercury jet and the proton beam. The number of muons surviving through an ionization cooling channel is determined as a function of the proton beam energy. We optimize the mercury jet target parameters: the mercury jet radius, the incoming proton beam angle and the crossing angle between the mercury jet and the proton beam for each proton beam energy. The optimized target radius varies from about 0.4 cm to 0.6 cm as the proton beam energy increases. The optimized beam angle varies from 75 mrad to 120 mrad. The optimized crossing angle is near 20 mrad for energies above 5 GeV. These values differ from earlier choices of 67 mrad for the beam angle and 33 mrad for the crossing angle. These new choices for the beam parameters increase the meson production by about 20% compared to the earlier parameters. Our study demonstrates that the maximum meson production efficiency per unit proton beam power occurs when the proton kinetic energy is in the range of 5-15 GeV. Finally, the dependence on energy of the number of muons at the end of the cooling channel is nearly identical to the dependence on energy of the meson production 50 m from the target. This demonstrates that the target parameters can be optimized without the additional step of running the distribution through a code such as ICOOL that simulates the bunching, phase rotation, and cooling.

43 PARTICLE ACCELERATORS↗

A 4-MW Target Station for a Muon Collider or Neutrino Factory

We outline a program of engineering design and simulation for a target station and pion production/capture system for a 4-MW proton beam at the front end of a Muon Collider or a Neutrino Factory. The target system consists of a free liquid-metal (nominally mercury) jet immersed in a high-field solenoid magnet capture system that also incorporates the proton beam dump. Topics to be studied include optimization of proton beam and jet target parameters, of the magnetic configuration for capture and subsequent transport of pions and muons, of the beam dump, of the radiation/thermal shielding of the capture magnets, and of the beam windows. While the principle of a liquid-metal jet target inside a 20-T solenoid has been validated by the MERIT experiment for beam pulses equivalent to 4-MW beam power at 50 Hz, substantial effort is still required to turn this concept into a viable engineering design. We are embarking on a several-year program of simulation and technical design for a 4-MW target station in preparation for the Muon Collider Design Feasibility Study and the International Design Study for a Neutrino Factory.

43 PARTICLE ACCELERATORS↗

A Pion Production and Capture System for a 4 MW Target Station

A study of a pion production and capture system for a 4 MW target station for a neutrino factory or muon collider is presented. Using the MARS code, we simulate the pion production produced by the interaction of a free liquid mercury jet with an intense proton beam. We study the variation of meson production with the direction of the proton beam relative to the target. We also examine the influence on the meson production by the focusing of the proton beam. The energy deposition in the capture system is determined and the shielding required in order to avoid radiation damage is discussed. The exploration for the multiple proton beam entry directions relative to mercury jet in the 8GeV proton beam case demonstrates that an asymmetric layout is required in order to achieve the same beam/jet crossing angle at the jet axis. We find a correlation between the distance of beam relative to the jet and the meson production. The peak meson production is 8% higher than for the lowest case. The examination of the influence on the meson production by the focusing of the proton beam shows the meson production loss is negligible (<1%) for a beta function to be 0.3m or higher for the proton beam. By investigating the energy deposition in the target/capture system, we see that the bulk of 4-MW proton beam power is deposited in the water cooled tungsten-carbide (WC) shielding, the mercury jet and the capture beam pipe. In addition, high power deposition in the first superconducting coil causes an issue for its operation and life time. Enhanced shielding is necessary to lower the radiation damage.

43 PARTICLE ACCELERATORS↗

Meson Production Simulations for a Mercury Jet Target

A study of target parameters for a high-power, liquid mercury jet target system for a neutrino factory or muon collider is presented. Using the MARS15 code, we simulate particle production initiated by incoming protons below the jet with kinetic energies between 2 and 100 GeV. For each proton beam energy, we maximize production by varying the geometric parameters of the target: the mercury jet radius, the incoming proton beam angle, and the crossing angle between the mercury jet and the proton beam. With an 8 GeV proton beam, we study the variation of meson production with the direction of the proton beam relative to the jet.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗