Search NASASearch

Engineering topics

Donohue, John T.

Publications and source records attributed to Donohue, John T..

Workforce Challenges and Retention Success Stories

This viewgraph document discusses the current and future challenges in building and retaining the required workforce of scientist and engineers for NASA. Specifically, the talk reviews the current situation at the Goddard Space Flight Center in Greenbelt, Maryland. Several programs at NASA for high school and college students to assist in inspiring the next generation of scientist and engineers are reviewed. The issue of retention of the best of the young scientists and engineers is also reviewed, with a brief review of several young engineers and their success with and for NASA.

Donohue, John T.

Endpoint Security Using Biometric Authentication for Secure Remote Mission Operations

We propose a flexible security authentication solution for the spacecraft end-user, which will allow the user to interact over Internet with the spacecraft, its instruments, or with the ground segment from anywhere, anytime based on the user's pre-defined set of privileges. This package includes biometrics authentication products, such as face, voice or fingerprint recognition, authentication services and procedures, such as: user registration and verification over the Internet and user database maintenance, with a configurable schema of spacecraft users' privileges. This fast and reliable user authentication mechanism will become an integral part of end-to-end ground-to-space secure Internet communications and migration from current practice to the future. All modules and services of the proposed package are commercially available and built to the NIST BioAPI standard, which facilitates "pluggability" and interoperability.

Donohue, John T.

Grand Challenge Problems in Real-Time Mission Control Systems for NASA's 21st Century Missions

Space missions of the 21st Century will be characterized by constellations of distributed spacecraft, miniaturized sensors and satellites, increased levels of automation, intelligent onboard processing, and mission autonomy. Programmatically, these missions will be noted for dramatically decreased budgets and mission development lifecycles. Current progress towards flexible, scaleable, low-cost, reusable mission control systems must accelerate given the current mission deployment schedule, and new technology will need to be infused to achieve desired levels of autonomy and processing capability. This paper will discuss current and future missions being managed at NASA's Goddard Space Flight Center in Greenbelt, MD. It will describe the current state of mission control systems and the problems they need to overcome to support the missions of the 21st Century.

Pfarr, Barbara B.

Refurbishment and Automation of the Thermal/Vacuum Facilities at the Goddard Space Flight Center

The thermal/vacuum facilities located at the Goddard Space Flight Center (GSFC) have supported both manned and unmanned space flight since the 1960s. Of the 11 facilities, currently 10 of the systems are scheduled for refurbishment and/or replacement as part of a 5-year implementation. Expected return on investment includes the reduction in test schedules, improvements in the safety of facility operations, reduction in the complexity of a test and the reduction in personnel support required for a test. Additionally, GSFC will become a global resource renowned for expertise in thermal engineering, mechanical engineering and for the automation of thermal/vacuum facilities and thermal/vacuum tests. Automation of the thermal/vacuum facilities includes the utilization of Programmable Logic Controllers (PLCs) and the use of Supervisory Control and Data Acquisition (SCADA) systems. These components allow the computer control and automation of mechanical components such as valves and pumps. In some cases, the chamber and chamber shroud require complete replacement while others require only mechanical component retrofit or replacement. The project of refurbishment and automation began in 1996 and has resulted in the computer control of one Facility (Facility #225) and the integration of electronically controlled devices and PLCs within several other facilities. Facility 225 has been successfully controlled by PLC and SCADA for over one year. Insignificant anomalies have occurred and were resolved with minimal impact to testing and operations. The amount of work remaining to be performed will occur over the next four to five years. Fiscal year 1998 includes the complete refurbishment of one facility, computer control of the thermal systems in two facilities, implementation of SCADA and PLC systems to support multiple facilities and the implementation of a Database server to allow efficient test management and data analysis.

Donohue, John T.