The Necessity for Iteration in the Application of Numerical Simulation to EGS: Examples from the EGS Collab Test Bed 1

The United States Department of Energy, Geothermal Technologies Office (GTO) is funding a collaborative investigation of enhanced geothermal systems (EGS) processes at the meso-scale. This study, referred to as the EGS Collab project, is a unique opportunity for scientists and engineers to investigate the creation of fracture networks and circulation of fluids across those networks under in-situ stress conditions. The EGS Collab project is envisioned to comprise three experiments and the site for the first experiment is on the 4850 Level in phyllite of the Precambrian Poorman formation, at the Sanford Underground Research Facility, located at the former Homestake Gold Mine, in Lead, South Dakota. Principal objectives of the project are to develop a number of intermediate-scale field sites and to conduct well-controlled in situ experiments focused on rock fracture behavior and permeability enhancement. Data generated during these experiments will be compared against predictions of a suite of computer codes specifically designed to solve problems involving coupled thermal, hydrological, geomechanical, and geochemical processes. Comparisons between experimental and numerical simulation results will provide code developers with direction for improvements and verification of process models, build confidence in the suite of available numerical tools, and ultimately identify critical future development needs for the geothermal modeling community. Moreover, conducting thorough comparisons of models, modelling approaches, measurement approaches and measured data, via the EGS Collab project, will serve to identify techniques that are most likely to succeed at the Frontier Observatory for Research in Geothermal Energy (FORGE), the GTO’s flagship EGS research effort. As noted, outcomes from the EGS Collab project experiments will serve as benchmarks for computer code verification, but numerical simulation additionally plays an essential role in designing these meso-scale experiments. This paper reviews specific numerical simulations supporting the design of experiments within Test Bed 1, a volume of phyllite rock under in-situ stress conditions off the western side of the West Access Drift on the 4850 Level, near Governor’s Corner. Numerical simulations were executed prior to the start of hydraulic stimulation activities within Test Bed 1 following standard practices, using best estimates of principal stress conditions, thermal conditions, and the rock petrophysical properties, including geomechanical properties. These simulations indicated notching of the borehole would promote the initiation of transverse fractures, seismic magnitudes during the hydraulic stimulation would be below 0.1 magnitude on the Richter scale, a rock thermal conductivity of 5.0 W/m K yielded agreement with kISMET borehole temperature logs, back pressure on the production borehole would increase circulation across the test bed, and the production borehole would serve to halt propagation of the hydraulic fracture to the drift. Pre-existing natural fractures, heterogeneities in the rock properties, monitoring boreholes, and overlooked mine elements have prompted a second look at numerically modeling stimulation, fluid circulation, tracer migration, and thermal breakthrough. Numerical simulation is an invaluable tool for providing insight and understanding to complex physical processes. The success of simulations, however, often depends on including all of the salient features of the system in the founding conceptual model. This paper takes a retrospective look at examples where the conceptual model and simulation was sufficient to provide accurate forecasts and those where elements were missing, necessitating rethinking of the simulation.

numerical simulation, EGS Collab, enhanced geother↗

TOUGH3 User’s Guide, Version 1.0

TOUGH3 is a general-purpose numerical simulator for multi-dimensional fluid and heat flows of multiphase, multicomponent fluid mixtures in porous and fractured media. It is developed as an enhanced, more efficient version of the TOUGH2 suite of codes. The present report provides a summary of the mathematical models and numerical methods, discusses new user features, and gives complete specifications for preparing input data. It also includes a quick start guide to TOUGH3 that describes how to install the code, set up the problem, execute the simulation, and analyze the output. To make this report self-contained, we include much of the material that was covered in the TOUGH2 user’s guide (Pruess et al., 2012).

97 MATHEMATICS AND COMPUTING↗

Fracture and Flow Designs for the Collab/SIGMA-V Project

The first experiment of the Enhanced Geothermal Systems (EGS) Collab (a.k.a Stimulation Investigations for Geothermal Modeling Analysis and Validation (SIGMA-V)) project is designed to comprehensively monitor a series of hydraulic fracture stimulations and subsequent flow tests. This experiment is planned for the 4850 Level in the Sanford Underground Research Facility (SURF), located at the former Homestake Gold Mine, in Lead, South Dakota. The target host rock for these stimulations and flow tests is a phyllite schist known as the Poorman formation. This paper discusses at a high level the engineering design for the stimulation and fracture monitoring system, the considerations for the test bed construction, and the preliminary stimulation modeling. Furthermore, this paper will highlight the intricate ways that predictive modeling can be used for testbed and stimulation design. This project is funded by the United States Department of Energy, Geothermal Technologies Office (GTO).

Knox, Hunter↗

GeoVision Analysis: Reservoir Maintenance and Development Task Force Report (GeoVision Analysis Supporting Task Force Report : Reservoir Maintenance and Development)

This report documents the key findings from the Reservoir Maintenance and Development (RM&D) Task of the U.S. Department of Energy's (DOE), Geothermal Technologies Office (GTO) Geothermal Vision Study (GeoVision Study). The GeoVision Study had the objective of conduc ting analyses of future geothermal growth based on sets of current and future geothermal technology developments. The RM&D Task is one of seven tasks within the GeoVision Study with the others being, Exploration and Confirmation, Potential to Penetration, Institutional Market Barriers, Environmental and Social Impacts, Thermal Applications, and Hybrid Systems. The full set of findings and the details of the GeoVision Study can be found in the final GeoVision Study report on the DOE-GTO website. As applied here, RM&D refers to the activities associated with developing, exploiting, and maintaining a known geothermal resource. It assumes that the site has already been vetted and that the resource has been evaluated to be of sufficient quality to move towards full-scale development. It also assumes that the resource is to be developed for power generation, as opposed to low-temperature or direct use applications. This document presents the key factors influencing RM&D from both a technological and operational standpoint and provides a baseline of its current state. It also looks forward to describe areas of research and development that must be pursued if the development geothermal energy is to reach its full potential.

15 GEOTHERMAL ENERGY↗

Assessing the nexus between groundwater and solar energy plants in a desert basin with a dual-model approach under uncertainty

Globally, many solar power plants and other types of renewable energy are being located in water-scarce regions. Many projects rely on groundwater resources whose sustainability is uncertain. In the Chuckwalla Basin in California, quantification of recharge and trans-valley underflow is needed to estimate the impacts of solar project withdrawals on the water table. However, such estimates are highly challenging due to data scarcity, heterogeneous soils and long residence times. Conventional assessment employs isolated groundwater models configured with crude and uniform estimates of recharge. Here, we employ a data-constrained surface subsurface processes model, PAWS+CLM, to provide an ensemble of recharges and underflows with perturbed parameters. Then, the Parameter Estimation (PEST) package is used to calibrate MODFLOW aquifer conductivity and filter out implausible recharges. The novel dual-model approach, potentially applicable in other arid regions, can effectively assimilate groundwater head observations, reject unrealistic parameters, and narrow the range of estimated drawdowns. Simulated recharge concentrates along alluvial fans at the mountain fronts and ephemeral washes where run-off water infiltrates. If an evenly distributed recharge was assumed, it resulted in under-estimated drawdown and larger uncertainty bounds. The withdrawals are approaching total inflow, suggesting the system will be nearing, if not exceeding, its sustainable groundwater production capacity, and a boom of such projects will not be sustainable. Especially, the cost/benefit of pumped-storage projects is called into question as the initial-fill phase depletes entire area’s recharge. Our study highlights the stress on groundwater resources of solar development, and that the speed of groundwater recovery does not indicate sustainability.

14 SOLAR ENERGY↗

Impact of Water Use by Utility-Scale Solar on Groundwater Resources of the Chuckwalla Basin, CA: Final Modeling Report

The DOE and BLM identified 285,000 acres of desert land in the Chuckwalla valley in the western U.S., for solar energy development. In addition to several approved solar projects, a pumped storage project was recently proposed to pump nearly 8000 acre-ft-yr of groundwater to store and stabilize solar energy output. This study aims at providing estimates of the amount of naturally-occurring recharge, and to estimate the impact of the pumping on the water table. To better provide the locations and intensity of natural recharge, this study employs an integrated, physically-based hydrologic model, PAWS+CLM, to calculate recharge. Then, the simulated recharge is used in a parameter estimation package to calibrate spatially-distributed K field. This design is to incorporate all available observational data, including soil moisture monitoring stations, groundwater head, and estimates of groundwater conductivity, to constrain the modeling. To address the uncertainty of the soil parameters, an ensemble of simulations are conducted, and the resulting recharges are either rejected or accepted based on calibrated groundwater head and local variation of the K field. The results indicate that the natural total inflow to the study domain is between 7107 and 12,772 afy. During the initial-fill phase of pumped storage project, the total outflow exceeds the upper bound estimate of the inflow. If the initial-fill is annualized to 20 years, the average pumping is more than the lower bound of inflows. The results indicate after adding the pumped storage project, the system will nearing, if not exceeding, its maximum renewable pumping capacity. The accepted recharges lead to a drawdown range of 24 to 45 ft for an assumed specific yield of 0.05. However, the drawdown is sensitive to this parameter, whereas there is insufficient data to adequately constrain this parameter.

14 SOLAR ENERGY↗

The Sim-SEQ Project: Comparison of Selected Flow Models for the S-3 Site

Sim-SEQ is an international initiative on model comparison for geologic carbon sequestration, with an objective to understand and, if possible, quantify model uncertainties. Model comparison efforts in Sim-SEQ are at present focusing on one specific field test site, hereafter referred to as the Sim-SEQ Study site (or S-3 site). Within Sim-SEQ, different modeling teams are developing conceptual models of CO2 injection at the S-3 site. In this paper, we select five flow models of the S-3 site and provide a qualitative comparison of their attributes and predictions. These models are based on five different simulators or modeling approaches: TOUGH2/EOS7C, STOMP-CO2e, MoReS, TOUGH2-MP/ECO2N, and VESA. In addition to model-to-model comparison, we perform a limited model-to-data comparison, and illustrate how model choices impact model predictions. We conclude the paper by making recommendations for model refinement that are likely to result in less uncertainty in model predictions.

Carbon sequestration↗

Preliminary Model Comparison Results From the Sim-SEQ Project Using TOUGH2, STOMP, Eclipse, and VESA Approach

Sim-SEQ is an international initiative on model comparison for geologic carbon sequestration (GCS), with an objective to understand and, if possible, quantify model uncertainties. Model comparison efforts in Sim-SEQ are initially limited to one specific field test site, hereafter referred to as the Sim-SEQ Study site (or S-3 site). Within Sim-SEQ, different modeling teams are developing conceptual models of CO2 injection at the S-3 site. One of the conceptual models, developed by the LBNL team, is based on TOUGH2/EOS7C. In this paper, we present some preliminary model predictions of the S-3 site using the TOUGH2/EOS7C simulator. We also compare the predictions of the TOUGH2 simulator with three other conceptual models, developed by three different organizations, of the S-3 site.

carbon sequestration↗

Model Comparison and Uncertainty Quantification for Geologic Carbon Storage. The Sim-SEQ Initiative

Sim-SEQ is a model comparison initiative for geologic carbon storage (GCS). In Sim-SEQ, fifteen different modeling teams are developing conceptual models for flow and transport of an injected CO 2 plume at the Sim-SEQ study site (or the S-3 site) located near Cranfield, Mississippi. The objective of the project is to understand the sources of model uncertainty in GCS, and if possible, to quantify these uncertainties through comparison of the different conceptual models and also through comparison with observed data from the S-3 site. In this paper, we compare six different conceptual models of the S-3 site, and present a preliminary uncertainty analysis of these six models using a generalized linear model approach. We show that differences in model conceptualization and interpretation of site characterization data caus a significant range in predictions.

54 ENVIRONMENTAL SCIENCES↗