Savannah River Site HB-Line Plutonium Oxide Production Process Simulation Model - 17458
The AFS II/Plutonium Oxide Production process is in its initial operational phase at the Savannah River Site's (SRS) HB-Line. The process is new for the facility where it is being performed, but the facility itself has been in use on and off for over 50 years. Beginning this process inside the facility has resulted in multiple process delays, due to both equipment issues and process restrictions. In order to better understand the process and to identify ways to improve facility performance, Savannah River Nuclear Solutions (SRNS), in conjuncture with Newport News Shipbuilding (NNS), developed the HB-Line Process Simulation Model. This tool completely replicates the operations that comprise the HB-Line process and simulates all of the constraints associated with the process. The model realistically accounts for the number of personnel required for a process step, the time required for a process step to occur, rules related to the parallel operation of process steps, and realistic equipment and operational delay data. The result is a tool that allows SRNS to test different scenarios for improving the process throughput, while realistically accounting for potential process delays and restrictions. The tool is currently in use and has allowed SRNS to present to their customer, the National Nuclear Security Administration (NNSA), estimated production capabilities over wide-ranging timetables and assumptions. (authors)