Search NASA⌕ Search

Engineering topics

Duque, Natalia

Publications and source records attributed to Duque, Natalia.

Using GIS for Processing, Analysis and Visualization of Hydrological Model Data - 16202

The Applied Research Center at Florida International University (ARC-FIU) is supporting the soil and groundwater remediation efforts of the U.S. Department of Energy's (DOE's) Savannah River Site (SRS) by developing a surface water model to simulate the hydrology and the fate and transport of contaminants and sediment in the Tims Branch watershed. Advances in ArcGIS software through the development of spatial GIS database (geo-database) technology, coupled with the development of data models such as ArcHydro which possesses a spatial relational database management system (RDMS) schema and relationship structure specific to hydrologic systems, provides modelers with tools and applications to assist in the processing, analysis and visualization of flow and contaminant transport data. In addition, the coupling of this type of geo-database structure with a numerical modeling package such as MIKE SHE/MIKE 11 can serve as an efficient tool that significantly reduces the time needed for data preparation. The MIKE modeling system has a geographic information systems (GIS) user interface built into its system that can directly use GIS data for model inputs. GIS-based hydrologic models can provide a spatial element that other hydrologic models lack. GIS is important for processing and analysis of large spatio-temporal datasets derived from multiple sources that are being used for setting up of models, model calibration and simulation of flow and contaminant fate and transport. GIS-based approaches in hydrological modeling can also provide the benefit of combining different layers of geographic data to create new integrated information which can be quite useful for creating dependent or independent hydrological variables. ARC-FIU has developed an ArcGIS geo-database to support the hydrological modeling work being conducted at SRS. The SRS geo-database was developed based on the ArcHydro and ArcGIS Base Map data models with modifications made for project specific input parameters. The significance of this approach was to ensure its replicability for potential application at other DOE sites. The SRS geo-database assists in the storage and management of GIS and time series data being used for hydrological model development at Savannah River Site. Other GIS tools such as ArcGIS Model Builder coupled with Python scripting have enabled the automation of many of the repetitive geo-processing tasks required for pre- and post-processing of the hydrological modeling data. Automation of many of the data processing tasks has facilitated faster and hence more complex analyses of field test data. The toolbox created is also a scalable and reusable application that can be implemented in other watersheds. This paper describes the use of ArcGIS tools for the pre-processing, spatial delineation and analysis of hydrological model data; for automation of repetitive geo-processing tasks; and for visualization of different hydrological components of the Tims Branch watershed. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Development of an Integrated Hydrological Model for Simulation of Surface Runoff and Stream Flow in Tims Branch Watershed, Savannah River Site, South Carolina - 16203

This research is part of continued efforts to develop an integrated transport model to predict the distribution of tin within the overland flow in Tims Branch Watershed (TBW) at Savannah River Site (SRS), South Carolina. Tin was introduced into TBW during the application of an innovative mercury remediation technology implemented by the U.S. Department of Energy's Office of Environmental Management, which involved the injection of stannous (tin) chloride into mercury contaminated groundwater. Understanding the fate and transport of tin and its compounds is of primary importance due to their potential impact on the environment. In this study, we developed an overland hydrology model (MIKE SHE) capable of simulating surface hydrology throughout the TBW. The modeling application used historical precipitation, groundwater levels, geological data, and river discharges that were retrieved from government databases and input to the model. The model was developed to simulate spatio-temporal distribution of flow discharges, flow duration, and water levels in the TBW. The preliminary simulation results indicated that the model was capable of predicting flow depth and velocity within the study area during extreme climate events. The developed hydrology model will later on be coupled with transport model to simulate tin distribution within Tims Branch stream during seasonal storm events. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Modeling and Quantitative Assessment of Green and Sustainable Remediation Options for the M1 Air Stripper System at DOE SRS - 15660

The effectiveness of remediation systems needs to be reviewed periodically to assess their performance over the years relative to efficiency and effectiveness. New technologies and Best Management Practices have emerged that can improve existing remediation systems. From a Green and Sustainable Remediation analysis, the higher energy and/or water usage of older systems might not be justified from an environmental protection rationale. For example, remediation systems can run intermittently and with slower flow rates, use less power, and still provide the required level of environmental remediation and protection. This research by the Applied Research Center at Florida International University (FIU) is the preliminary phase of a Green and Sustainable Remediation (GSR) analysis of the operations of the M1 air stripper and the A/M Area groundwater remediation system at the Savannah River Site (SRS). An initial baseline analysis has helped identify opportunities for implementing Green and Sustainable Remediation (GSR) practices while maintaining the hydraulic containment and effectiveness of the remediation system. This study included the collection of contaminant recovery data from SRS reports into a database of trichloroethene (TCE) and tetrachloroethene (PCE) removal from contaminant recovery wells RWM-1 through RWM-12. Presented below are data and preliminary findings from these recovery wells. Findings show that 7 of 12 recovery wells have transitioned to more PCE removal than TCE removal; the nearby steam injection remediation of 'Dynamic Underground Stripping' mobilized DNAPL and resulted in increased recovery in nearby wells. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Quantitative assessment of sustainable remediation options for the M-1 air stripper system at SRS - 15702

The US Department of Energy (DOE) Savannah River Site (SRS) covers 310 sq. miles and is located south of Aiken, SC. The site produced materials used in the production of nuclear weapons from the 1950's to the 1980's. Trichloroethylene (TCE) and tetrachloroethylene (PCE) were the main solvents used in degreasing and other industrial operations. These solvents are categorized as dense non-aqueous phase liquids (DNAPLs), semi-volatile, and hazardous chemical compounds. In the 1980's, operations were initiated to remediate the contaminated soil and groundwater which continues today. The M-1 air stripper and well network has operated continuously since 1985 at an average electrical load of 150 kW and flow rate of 420 gpm. The influent TCE concentration to the air stripper has decreased exponentially from 25,200 ug/L in 1986 to 2,230 ug/L by the end of 2012, with the same energy consumption and water pumping rate. To analyze the operation of the SRS A/M Area groundwater remediation system using state-of-the-art modeling tools to provide suggested engineering and operational improvements to expend less resources while still containing the contaminant plume. Implementation of improvements will help DOE-EM apply sustainable remediation at its sites and help DOE achieve DOE-wide sustainability performance metrics. Located in the northern part of SRS within the lower reaches of the Tims Branch watershed (topographic elevation from ∼420 X to ∼ 118 X). Consists of facilities that fabricated reactor fuel and target assemblies (M-Area), and administrative and support facilities (A-Area). M-1 Air Stripper and Recovery Well Network Installed in 1985 to treat groundwater in order to reduce chlorinated solvent concentrations. 17 recovery wells have been installed over the years. Currently recovery wells 1-12 feed the M1 air stripper. The treated groundwater is discharged to a stream in Tims Branch. The monthly removal rate and the cumulative mass removed for TCE and PCE in the 12 recovery wells was analyzed for 1985-2012. 7 of 12 recovery wells have transitioned to more PCE than TCE removed. This is an expected result since TCE was initially used and then replaced by PCE. The rate of recovery in some wells was affected by the Dynamic Underground Stripping process. 7 wells exhibit exponential decay in contaminant removal while 5 exhibit steady concentrations, and 2 exhibit linear decreases. Future Work: Identify opportunities to improve efficiencies related to electrical energy, water usage, and the use of other resources, beginning with mechanical design modifications. Investigate operational strategies to increase system performance by optimizing the hydraulic loads, pumping rates, contaminant mass flow rates and well drawdown levels. Determine a set of metrics which will correlate the pumping rates, the cone of depression, and the interaction between the wells with the contaminant mass flow rates.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗