Search NASA⌕ Search

Engineering topics

Eddy, N

Publications and source records attributed to Eddy, N.

Observation of Instabilities of Coherent Transverse Ocillations in the Fermilab Booster

The Fermilab Booster - built more than 40 years ago - operates well above the design proton beam intensity of 4 {center_dot} 10{sup 12} ppp. Still, the Fermilab neutrino experiments call for even higher intensity exceeding 5.5 {center_dot} 10{sup 12} ppp. A multitude of intensity related effects must be overcome in order to meet this goal including suppression of coherent dipole instabilities of transverse oscillations which manifest themselves as a sudden drop in the beam current. In this report we present the results of observation of these instabilities at different tune, coupling and chromaticity settings and discuss possible cures.

43 PARTICLE ACCELERATORS↗

Status of the ATF Damping Ring BPM Upgrade Project

A substantial upgrade of the beam position monitors (BPM) at the ATF (Accelerator Test Facility) damping ring is currently in progress. Implementing digital read-out signal processing techniques in line with an optimized, low-noise analog downconverter, a resolution well below 1 mum could be demonstrated at 20 (of 96) upgraded BPM stations. The narrowband, high resolution BPM mode permits investigation of all types of non-linearities, imperfections and other obstacles in the machine which may limit the very low target aimed vertical beam emittance of < 2 pm. The technical status of the project, first beam measurements and an outlook to it's finalization are presented.

43 PARTICLE ACCELERATORS↗

High Resolution BPM Upgrade for the ATF Damping Ring at KEK

A beam position monitor (BPM) upgrade at the KEK Accelerator Test Facility (ATF) damping ring has been accomplished, carried out by a KEK/FNAL/SLAC collaboration under the umbrella of the global ILC R&D effort. The upgrade consists of a high resolution, high reproducibility read-out system, based on analog and digital down-conversion techniques, digital signal processing, and also implements a new automatic gain error correction schema. The technical concept and realization as well as results of beam studies are presented. The next generation of linear colliders require ultra-low vertical emittance of <2 pm-rad. The damping ring at the KEK Accelerator Test Facility (ATF) is designed to demonstrate this mission critical goal. A high resolution beam position monitor (BPM) system for the damping ring is one of the key tools for realizing this goal. The BPM system needs to provide two distnict measurements. First, a very high resolution ({approx}100-200nm) closed-orbit measurement which is averaged over many turns and realized with narrowband filter techniques - 'narrowband mode'. This is needed to monitor and steer the beam along an optimum orbit and to facilitate beam-based alignment to minimize non-linear field effects. Second, is the ability to make turn by turn (TBT) measurements to support optics studies and corrections necessary to achieve the design performance. As the TBT measurement necessitates a wider bandwidth, it is often referred to as 'wideband mode'. The BPM upgrade was initiated as a KEK/SLAC/FNAL collaboration in the frame of the Global Design Initiative of the International Linear Collider. The project was realized and completed using Japan-US funds with Fermilab as the core partner.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

A Wire Position Monitor System for the 1.3 FHZ Tesla-Style Cryomodule at the Fermilab New-Muon-Lab Accelerator

The first cryomodule for the beam test facility at the Fermilab New-Muon-Lab building is currently under RF commissioning. Among other diagnostics systems, the transverse position of the helium gas return pipe with the connected 1.3 GHz SRF accelerating cavities is measured along the {approx}15 m long module using a stretched-wire position monitoring system. An overview of the wire position monitor system technology is given, along with preliminary results taken at the initial module cooldown, and during further testing. As the measurement system offers a high resolution, we also discuss options for use as a vibration detector. An electron beam test facility, based on superconducting RF (SRF) TESLA-style cryomodules is currently under construction at the Fermilab New-Muon-Lab (NML) building. The first, so-called type III+, cryomodule (CM-1), equipped with eight 1.3 GHz nine-cell accelerating cavities was recently cooled down to 2 K, and is currently under RF conditioning. The transverse alignment of the cavity string within the cryomodule is crucial for minimizing transverse kick and beam break-up effects, generated by the high-order dipole modes of misaligned accelerating structures. An optimum alignment can only be guaranteed during the assembly of the cavity string, i.e. at room temperatures. The final position of the cavities after cooldown is uncontrollable, and therefore unknown. A wire position monitoring system (WPM) can help to understand the transverse motion of the cavities during cooldown, their final location and the long term position stability after cryo-temperatures are settled, as well as the position reproducibility for several cold-warm cycles. It also may serve as vibration sensor, as the wire acts as a high-Q resonant detector for mechanical vibrations in the low-audio frequency range. The WPM system consists out of a stretched-wire position detection system, provided with help of INFN-Milano and DESY Hamburg, and RF generation and read-out electronics, developed at Fermilab.

43 PARTICLE ACCELERATORS↗

Using the transverse digital damper as a real-time tune monitor for the Booster synchrotron at Fermilab

The Fermilab Booster is a fast ramping (15Hz) synchrotron which accelerates protons from 400MeV to 8GeV. During commissioning of a transverse digital damper system, it was shown that the damper could provide a measurement of the machine tune throughout the cycle by exciting just 1 of the 84 bunches with minimal impact on the machine operation. The algorithms used to make the measurement have been incorporated into the damper FPGA firmware allowing for real-time tune monitoring of all Booster cycles. A new Booster tune monitor was implemented in the digital damper which has minimal impact on the Booster operation. The tune measures the tunes in two planes over the energy ramping cycle with an accuracy of 0.01 in real time.

43 PARTICLE ACCELERATORS↗

Transverse instability of the antiproton beam in the Recycler Ring

The brightness of the antiproton beam in Fermilab's 8 GeV Recycler ring is limited by a transverse instability. This instability has occurred during the extraction process to the Tevatron for large stacks of antiprotons even with dampers in operation. This paper describes observed features of the instability, introduces the threshold phase density to characterize the beam stability, and finds the results to be in agreement with a resistive wall instability model. Effective exclusion of the longitudinal tails from Landau damping by decreasing the depth of the RF potential well is observed to lower the threshold density by up to a factor of two.

43 PARTICLE ACCELERATORS↗

Higher Order Modes in Third Harmonic Cavities for XFEL/FLASH

We analyse higher order modes in the 3.9 GHz bunch shaping cavities recently installed in the FLASH facility at DESY. We report on recent experimental results on the frequency spectrum from probe based measurements made at CMTB at DESY. These are compared to those predicted by finite difference and finite element computer codes. This study is focused mainly on the dipole component of the multi-pole expansion of the wakefield. The modes are readily identifiable as single-cavity modes provided the frequencies of these modes are below the cut-off of the inter-connecting beam pipes. The modes above cut-off are coupled to the 4 cavities and are distinct from single cavity modes.

71 CLASSICAL AND QUANTUM MECHANICS, GENERAL PHYSIC↗

High resolution BPMS with integrated gain correction system

High resolution beam position monitors (BPM) are an essential tool to achieve and reproduce a low vertical beam emittance at the KEK Accelerator Test Facility (ATF) damping ring. The ATF damping ring (DR) BPMs are currently upgraded with new high resolution read-out electronics. Based on analog and digital down-conversion techniques, the upgrade includes an automatic gain calibration system to correct for slow drift effects and ensure high reproducible beam position readings. The concept and its technical realization, as well as preliminary results of beam studies are presented.

43 PARTICLE ACCELERATORS↗

Status of antiproton accumulation and cooling at Fermilab's Recycler

The Recycler ring is an 8 GeV permanent magnet storage ring where antiprotons are accumulated and prepared for Fermilab's Tevatron Collider program. With the goal of maximizing the integrated luminosity delivered to the experiments, storing, cooling and extracting antiprotons with high efficiency has been pursued. Over the past two years, while the average accumulation rate doubled, the Recycler continued to operate at a constant level of performance thanks to changes made to the Recycler Electron Cooler (energy stability and regulation, electron beam optics), RF manipulations and operating procedures. In particular, we discuss the current accumulation cycle in which {approx} 400 x 10{sup 10} antiprotons are accumulated and extracted to the Tevatron every {approx}15 hours.

43 PARTICLE ACCELERATORS↗