Cyber Restoration of Power Systems: Concept and Methodology for Resilient Observability
Not Available
Engineering topics
Publications and source records attributed to Edib, Shamsun Nahar.
Not Available
The wide-area measurement system (WAMS) is a key enabler of real-time monitoring of power grids. The essential goals of WAMS design are fast and resilient data transfer from phasor measurement units (PMU) to phasor data concentrators (PDC). We propose a scalable two-stage PDC placement technique for minimizing the end-to-end delay while maintaining resiliency. In the prescreening stage, the plausible candidates of PDC configurations are identified based on a graph theory-based multi-median function (MMF). Here, in this article, a computationally efficient meta-heuristic algorithm is used to address scalability. In the candidate selection stage, two different algorithms, namely, Suurballe's and Dijkstra's, are employed to identify the best of those plausible PDC configurations as the final design. This technique not only minimizes the hop paths between PMUs and PDCs, but also ensures network resiliency against single PMU, PDC, or communication link failure by incorporating the roles of PMUs in power grid observability into routing policy. Simulation results on the IEEE 57-bus test power system and the 2000-bus test power system demonstrate the effectiveness and scalability of the proposed technique.
Phasor measurement units (PMUs) play a crucial role in real-time monitoring and control of power grids. They rely on a communication network to transfer measurement data to the phasor data concentrator (PDC) for further processing and analysis. In this paper, a resilient cross-domain PMU and communication link placement method for minimizing the overall installation cost of the wide-area measurement system (WAMS) is proposed. Here, the main idea is to break down the barrier between the power grid domain and the communication domain, and consider the impact of one when design the other. The PMU placement in the power grid domain takes into account the cost of communication links by generating multiple solutions with equally minimum PMU costs for communication link placement evaluation. On the other hand, the communication link placement problem reduces the cost by customizing the routing policies based on the different roles of PMUs in grid observability. The proposed WAMS design is capable of withstanding any single component failure in the power domain (PMU failure or power branch failure) or in the communication domain (communication link failure or PDC failure). Numerical study on the IEEE 57-bus system reveals that the developed cross-domain optimization framework can significantly reduce the overall installation cost of WAMS while attaining multi-domain resiliency.
This paper is concerned about recovering the observability of cyber-physical power grids after massive cyber attacks, which helps to achieve the cyber-physical resilience of the grids. For recovering the observability of the grid, the measurability of the Phasor Measurement Units (PMUs) and the connectivity of the communication network are needed to be restored. The PMU and communication infrastructure restoration problem is jointly formulated as a Mixed Integer Linear Programming (MILP) problem to minimize the observability loss of the grid over time after a cyber attack while considering the constraint of limited resources. The efficacy of the proposed optimal restoration strategy is verified by comparing with heuristic methods on the IEEE 57-bus system.