Improved resistive plate chambers for HL-LHC upgrade of CMS
Not Available
Engineering topics
Publications and source records attributed to El Sawy, M..
Not Available
Not Available
During Run2 the high instantaneous luminosity, up to 2.2 · 10 34 cm -2 s -1 , lead to a substantial hit rate in the Compact Muon Solenoid experiment’s muon chambers due to multiple background sources to physics processes sought for at LHC. In this article we will describe the analysis method devised to measure and identify the contributions to such background in the Resistive Plate Chambers. Thorough understanding of the background rates provides the base for the upgrade of the muon detectors for the High-Luminosity LHC.
During Run-3, the LHC is preparing to deliver instantaneous luminosity in the range from 5 × 10 34 cm -2 s -1 to 7.5 × 10 34 cm -2 s -1 . To ensure stable data taking, providing redundant information for robust muon triggering, reconstruction and identification, the CMS RPC collaboration has used the opportunity given by the LHC long shutdown 2 (LS2), to perform a series of maintenance and preparation activities for the new data taking period. The overall performance of the RPC system after the LS2 commissioning period and the activities in preparation for future data taking will be presented.