Search NASA⌕ Search

Engineering topics

Eldred, Jeff

Publications and source records attributed to Eldred, Jeff.

Fermilab Neutrino Program – Accelerators & Experiments

We provide an overview of the Fermilab neutrino program, including details for both the accelerator and experiment aspect of the program. On the accelerator side, the current operation of the proton complex is presented, alongside the status of the upcoming PIP-II upgrade and the newly proposed ACE-MIRT upgrade. On the detector side, the SBN and NOVA programs are presented, as well as the status of the upcoming DUNE/LBNF upgrade. The Fermilab neutrino program planning is contextualized in terms of the recent P5 report, as well as ongoing discussions on future flavor and collider programs.

43 PARTICLE ACCELERATORS↗

Bayesian Optimization For Accelerator Tuning

Tuning the accelerator during operational hours is a tedious yet essential aspect of managing any experimental facility. This process significantly reduces the beam time available for experimenters, as diagnosing issues and making corrections can take hours. Automating or facilitating the normal beam line tuning process would be highly beneficial.

43 PARTICLE ACCELERATORS↗

Accelerator challenges in the Fermilab Neutrino Program

In Fermilab's 2022-2023 proton complex run, Fermilab recovered from an unexpected failure in the neutrino focusing horn to achieve a record beam power of 960 kW. For Snowmass and P5, Fermilab recently proposed a new upgrade plan known as Accelerator Complex Evolution (ACE) to occur after PIP-II upgrade in tandem with DUNE/LBNF operation. The first phase of ACE, is the ACE Main Injector Ramp and Targetry upgrade, would raise the LBNF beam power from 1.2 MW to 2 MW by shortening the Main Injector cycle time to around 0.65s. The second phase of ACE, the ACE Booster Replacement, would replace the Booster with a new machine and achieve 2.4 MW for DUNE/LBNF. The core accelerator challenges, present and future, for operating intense neutrino beams at Fermilab will be highlighted.

43 PARTICLE ACCELERATORS↗

ACE: Proton beam upgrade plan at Fermilab

aFor Snowmass and P5, Fermilab recently proposed a new upgrade plan known as Accelerator Complex Evolution (ACE) to occur after PIP-II upgrade in tandem with DUNE/LBNF operation. The first phase of ACE, ACE-MIRT, is the ACE Main Injector Ramp and Targetry upgrade, which would raise the LBNF beam power from 1.2 MW to 2 MW by shortening the Main Injector cycle time to around 0.65s. The second phase of ACE, AC-BR, is the ACE Booster Replacement, which would replace the Booster with a new machine and achieve 2.4 MW for DUNE/LBNF. The implications for the Fermilab neutrino program and future experiments hosted at Fermilab will be discussed.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Harmonic Slip-Stacking

Particle accelerators employ slip-stacking configurations to store two particle beams with disparate momenta within a single ring. Additionally, A novel slip-stacking configuration employing a harmonic RF cavity was proposed and studied. Anticipated benefits of the harmonic cavity include mitigating parametric resonances, minimizing emittance growth, and significantly expanding the stable longitudinal phase-space area. By surpassing the requirements of PIP-II operation, the harmonic RF cavity will support extending slip-stacking operation for subsequent beam power upgrades of Main Injector, including a proposed cycle rate improvement. Our ongoing research will verify the simulation of harmonic slip-stacking (HSS) operation under RF phase-errors, such as those causes by beam-loading effects.

Habibeh, Mohammad↗

SBN-BD: O(10 GeV) Proton Beam Dump at Fermilab’s PIP-II Linac

Proton beam dumps are prolific sources of mesons enabling a powerful technique to search for vector mediator coupling of dark matter to neutral pion and higher mass meson decays. By the end of the decade the PIP-II linac will be delivering up to 1 MW of proton power to the FNAL campus. This includes a significant increase of power to the Booster Neutrino Beamline (BNB) which delivers 8 GeV protons to the Short Baseline Neutrino (SBN) detectors. By building a new dedicated beam dump target station, and using the SBN detectors, a greater than an order of magnitude increase in search sensitivity for dark matter relative to the recent MiniBooNE beam dump search can be achieved. This modest cost upgrade to the BNB would begin testing models of the highly motivated relic density limit predictions and provide novel ways to test explanations of the anomalous excess of low energy events seen by MiniBooNE.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

SBN-BD: $\mathcal{O}$(10 GeV) Proton Beam Dump at Fermilab's PIP-II Linac

Proton beam dumps are prolific sources of mesons enabling a powerful technique to search for vector mediator coupling of dark matter to neutral pion and higher mass meson decays. By the end of the decade the PIP-II linac will be delivering up to 1 MW of proton power to the FNAL campus. This includes a significant increase of power to the Booster Neutrino Beamline (BNB) which delivers 8 GeV protons to the Short Baseline Neutrino (SBN) detectors. By building a new dedicated beam dump target station, and using the SBN detectors, a greater than an order of magnitude increase in search sensitivity for dark matter relative to the recent MiniBooNE beam dump search can be achieved. This modest cost upgrade to the BNB would begin testing models of the highly motivated relic density limit predictions and provide novel ways to test explanations of the anomalous excess of low energy events seen by MiniBooNE.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗