FRIB Beam Power Ramp-up: Status and Plans

After project completion on scope, on cost, and ahead of schedule, the Facility for Rare Isotope Beams began operations for scientific users in May of 2022. The ramp-up to a beam power of 400 kW is planned over a six-year period; 1 kW was delivered for initial user runs from in 2022, and 5 kW was delivered as of February 2023. Test runs with 10 kW 36Ar and 48Ca beams were conducted in July 2023. Upgrade plans include doubling the primary-beam energy to 400 MeV/nucleon for enhanced discovery potential (¿FRIB 400¿). This talk reports on the strategic plans towards high power operations emphasizing challenges and resolutions in beam-interception devices and targetry systems, radiation protection and controls, and legacy system renovation and integration.

43 PARTICLE ACCELERATORS↗

FRIB Transition to User Operations, Power Ramp Up, and Upgrade Perspectives

After project completion on scope, on cost, and ahead of schedule, the Facility for Rare Isotope Beams began operations for scientific users in May of 2022. During the first 12 months of user operations, the FRIB accelerator complex delivered 5250 beam hours, including 1528 hours to nine science experiments conducted with primary beams of 36Ar, 48Ca, 70Zn, 82Se, 124Xe, and 198Pt at beam energies >200 MeV/u; 2724 hours for beam developments, studies, and tuning; and 998 hours to industrial users and non-scientific programs using the FRIB Single Event Effect (FSEE) beam line. The ramp-up to a beam power of 400 kW is planned over a six-year period; 1 kW was delivered for initial user runs from in 2022, and 5 kW was delivered as of February 2023. Upgrade plans include doubling the primary-beam energy to 400 MeV/nucleon for enhanced discovery potential (¿FRIB 400¿). This talk reports on FRIB status and progress since SRF2021, emphasizing lessons learned during the transition from beam commissioning to machine operations, challenges and resolutions for the power ramp-up, progress with accelerator improvements, and R&D for the energy upgrade.

43 PARTICLE ACCELERATORS↗

Developments Towards FRIB Upgrade to 400 MeV/u for Heaviest Uranium Ions

High-Q₀ medium-velocity (beta opt = 0.6) 5-cell elliptical cavities for superconducting linacs are critical technology for advancing current and future projects such as the Proton Improvement Plan II linac and the proposed energy upgrade of Michigan State University’s Facility For Rare Isotope Beams linac, FRIB400. Previous work established the validity of the novel geometry of the FRIB400 prototype 644 MHz 5-cell elliptical β = 0.65 cavities for future high Q₀ development. In collaboration with FNAL, two leading-edge high-Q₀ recipes, N-doping and Mid-T baking, were tested in the 5-cell format. 2/0 N-doping + cold electropolishing was successful at achieving FRIB400 and PIP-II Q₀ requirements, achieving an unprecedented 3.8 x 10¹⁰ at 17.5 MV/m, satisfying the FRIB400 Q₀ requirements by 1.75 times in a low-gauss environment. Mid-T baking exceeded FRIB400 Q₀ requirements by 1.4 times, and benefitted from decreased residual resistance compared to the N-doped cavity test. Systematic ultrasonic thickness measurements in single-cell revealed bulk (150 microns) EP with the modified EP tool is consistent across the inner surfaces of the cavity walls.