Evans, Nicholas

Publications and source records attributed to Evans, Nicholas.

Progress towards the completion of the proton power upgrade project

The Proton Power Upgrade project at the Spallation Neutron Source at Oak Ridge National Laboratory will increase the proton beam power capability from 1.4 to 2.8 MW. Upon completion in early 2025, 2 MW of beam power will be available for neutron production at the existing first target station (FTS) with the remaining beam power available for the future second target station (STS). The project has installed seven superconducting radio-frequency (RF) cryomodules and supporting RF power systems to increase the beam energy by 30% to 1.3 GeV, and the beam current will be increased by 50%. The injection and extraction region of the accumulator ring are being upgraded, and a new 2 MW mercury target has been developed along with supporting equipment for high-flow gas injection to mitigate cavitation and fatigue stress. The first four cryomodules and supporting systems were commissioned in 2022-2023 and supported neutron production at 1.05 GeV, 1.7 MW with high reliability. The first-article 2 MW target was operated successfully for approximately 4400 MW-Hours over two run periods. The long outage began in August 2023 for installation of the remaining technical equipment and construction of the Ring-to-Target Beam Transport tunnel stub that will enable connection to the STS without interrupting operation of the FTS. The upgrade is proceeding on-schedule and on-budget, and resumption of neutron production for the user program is planned for July 2024.

43 PARTICLE ACCELERATORS↗

Proposed muon collider R&D at SNS

Generation of a muon beam at a Muon Collider requires relatively short, high-charge proton bunches. They are produced in a high-average-power proton driver by first accumulating a proton beam from a super-conducting linac, then bunching the beam and finally compressing and combining the bunches into a single high-intensity proton pulse. All of these beam formation stages involve handling of unprecedentedly high beam charges. Validation of these intricate beam manipulations requires better understanding of extreme space-charge effects and experimental demonstration. A facility perhaps most closely resembling the proton driver configuration and beam parameters is the Spallation Neutron Source (SNS) accelerator complex at Oak Ridge National Laboratory (ORNL). Considering the energy scaling of the space-charge parameters, many of the beam formation steps planned for the proton driver can be experimentally checked at the SNS at the relevant space-charge interaction levels. This paper discusses potential proton driver and other muon-collider-related R\&D at the SNS.

43 PARTICLE ACCELERATORS↗

Progress towards the completion of the proton power upgrade project

The Proton Power Upgrade project at the Spallation Neutron Source at Oak Ridge National Laboratory will increase the proton beam power capability from 1.4 to 2.8 MW. Upon completion in early 2025, 2 MW of beam power will be available for neutron production at the existing first target station (FTS) with the remaining beam power available for the future second target station (STS). The project has installed seven superconducting radio-frequency (RF) cryomodules and supporting RF power systems to increase the beam energy by 30% to 1.3 GeV, and the beam current will be increased by 50%. The injection and extraction region of the accumulator ring are being upgraded, and a new 2 MW mercury target has been developed along with supporting equipment for high-flow gas injection to mitigate cavitation and fatigue stress. The first four cryomodules and supporting systems were commissioned in 2022-2023 and supported neutron production at 1.05 GeV, 1.7 MW with high reliability. The first-article 2 MW target was operated successfully for approximately 4400 MW-Hours over two run periods. The long outage began in August 2023 for installation of the remaining technical equipment and construction of the Ring-to-Target Beam Transport tunnel stub that will enable connection to the STS without interrupting operation of the FTS. The upgrade is proceeding on-schedule and on-budget, and resumption of neutron production for the user program is planned for July 2024.

Champion, Mark↗

Progress on the Proton Power Upgrade Project at the Spallation Neutron Source

The Proton Power Upgrade Project at the Spallation Neutron Source at Oak Ridge National Laboratory will increase the proton beam power capability from 1.4 to 2.8 MW. Upon completion of the project, 2 MW of beam power will be available for neutron production at the existing first target station with the remaining beam power available for the future second target station. The project will install seven superconducting RF cryomodules and supporting RF power systems and ancillaries to increase the beam energy to 1.3 GeV . The injection and extraction region of the accumulator ring will be upgraded, and a new 2 MW mercury target has been developed along with supporting equipment for high-flow gas injection to mitigate cavitation and fatigue stress. Equipment is being received from vendors and partner laboratories, and installation is underway with three major installation outages planned in 2022-2024. The project is planned to be completed in 2025.

43 PARTICLE ACCELERATORS↗

Progress on the Proton Power Upgrade Project at the Spallation Neutron Source

The Proton Power Upgrade Project at the Spallation Neutron Source at Oak Ridge National Laboratory will increase the proton beam power capability from 1.4 to 2.8 MW. Upon completion of the project, 2 MW of beam power will be available for neutron production at the existing first target station with the remaining beam power available for the future second target station. The project will install seven superconducting RF cryomodules and supporting RF power systems and ancillaries to increase the beam energy to 1.3 GeV . The injection and extraction region of the accumulator ring will be upgraded, and a new 2 MW mercury target has been developed along with supporting equipment for high-flow gas injection to mitigate cavitation and fatigue stress. Equipment is being received from vendors and partner laboratories, and installation is underway with three major installation outages planned in 2022-2024. The project is planned to be completed in 2025.

Barbier, Charlotte↗

Four-dimensional emittance measurement at the Spallation Neutron Source

A coasting hadron beam with an elliptical transverse profile, uniform charge density, and small transverse four-dimensional (4D) emittance could improve accelerator performance in several contexts. A phase space painting method to generate such a distribution is being tested in the Spallation Neutron Source (SNS) accumulator ring. A critical component of these efforts is to measure the 4D emittance of the beam during accumulation. The 4D emittance can be reconstructed from measured beam profiles in two ways: in the multi-optics method, the optics between a reconstruction and measurement location are varied; in the fixed-optics method, multiple measurement locations are used without modifying the optics. The fixed-optics method is faster but can lead to large uncertainty in the reconstructed 4D emittance. In this paper, we implement a variant of the multi-optics method using the four available wire-scanners near the SNS target. We also modify the wire-scanner region to reduce the uncertainty of the fixed-optics method. We then demonstrate the usefulness of the fixed-optics method by reconstructing the 4D emittance evolution during accumulation in the SNS ring.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Progress on the Proton Power Upgrade at the Spallation Neutron Source

The Proton Power Upgrade Project at the Spallation Neutron Source (SNS) at Oak Ridge National Laboratory will double the proton power capability from 1.4 to 2.8 MW. This will be accomplished through an energy increase from 1.0 to 1.3 GeV and a beam current increase from 26 to 38 mA. The energy increase will be accomplished through the addition of 7 cryomodules to the linear accelerator (Linac). The beam current increase will be supported by upgrading several radio-frequency systems in the normal-conducting section of the Linac. Upgrades to the accumulator ring injection and extraction regions will accommodate the increase in beam energy. A new 2-MW-capable target and supporting systems will be developed and installed. Conventional facility upgrades include build-out of the existing klystron gallery and construction of a tunnel stub to facilitate future beam transport to the second target station. The project received approval to proceed with construction in October 2020. Procurements are in progress, and some installation activities have already occurred. Most of the installation will take place during three outages in 2022-2023. The project early finish is planned for 2025.

Barbier, Charlotte↗

Thermal loading analysis of the ring injection dump for the Spallation Neutron Source facility

The ring injection dump (RID) is the largest beam dump in the Spallation Neutron Source facility at Oak Ridge National Laboratory and accepts a fraction of the beam from the ring that is not captured in the ring during injection. Thermo-fluid modeling of the RID components was performed during the initial design by using the software ANSYS CFX to characterize the power rating for the RID. From the calculations, the power rating was lowered from 200 kW to 150 kW, at 1.3 GeV beam energy due to concerns regarding the heating of the concrete structure. The Proton Power Upgrade project scope included reevaluating the power limit to the RID in anticipation that increasing it would provide more operational flexibility. The focus was on the shielding because it was the limiting factor, and data collected from thermocouples installed on the structure were used to benchmark the analysis. A three-stage process was adopted in the latest study. First, the already existing steady-state calculations were validated and extended with the latest Monte Carlo N-Particle source term calculations. Second, transient calculations were conducted to capture the dynamic state of the system in response to the energy dumped to the RID during the following operational period of the beam from 2005–2019 (14 years), and sensitivity analyses of crucial parameters were performed to benchmark the model with reasonable accuracy. Finally, an idealized transient cycle analysis was conducted with realistic duty factors to predict the temperature distribution at higher beam powers. Overall, the results confirmed the accuracy of the original steady state model but allowed the development of a new validated transient model with higher accuracy for future analyses.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗