Designing to Sample the Unknown: Lessons from OSIRIS-REx Project Systems Engineering

On September 8, 2016, the third NASA New Frontiers mission launched on an Atlas V 411. The Origins, Spectral Interpretation, Resource Identification, Security-Regolith Explorer (OSIRIS-REx) will rendezvous with asteroid Bennu in 2018, collect a sample in 2020, and return that sample to Earth in September 2023. The development team has overcome a number of challenges in order to design and build a system that will make contact with an unexplored, airless, low-gravity body. This paper will provide an overview of the mission, then focus in on the system-level challenges and some of the key system-level processes. Some of the lessons here are unique to the type of mission, like discussion of operating at a largely-unknown, low-gravity object. Other lessons, particularly from the build phase, have broad implications. The OSIRIS-REx risk management process was particularly effective in achieving an on-time and under-budget development effort. The systematic requirements management and verification and the system validation also helped identify numerous potential problems. The final assessment of the OSIRIS-REx performance will need to wait until the sample is returned in 2023, but this post-launch assessment will capture some of the key systems-engineering lessons from the development team.

Asteroid

The OSIRIS-REx Asteroid Sample Return Mission

Interpretation, Resource Identification, Security, Regolith EXplorer) spacecraft will depart for asteroid (101955) Bennu, and when it does, humanity will turn an important corner in the exploration of the Solar System. After arriving at the asteroid in the Fall of 2018, it will undertake a program of observations designed to select a site suitable for retrieving a sample that will be returned to the Earth in 2023..

reentry

Global Precipitation Measurement - Report 9 Core Coverage Trade Space Analysis

This paper summarizes the GPM-Core coverage trade space analysis. The goal of this analysis was to determine the GPM-Core sensitivity to changes in altitude and inclination for the three onboard instruments: the radiometer, the KU band radar and the KA band radar. This study will enable a better choice of the nominal GPM-Core orbit as well as the optimal size of the maintenance box (+/-1 km, +/-5 km..). For this work, we used two different figures-of-merit: (1) the time required to cover 100% of the +/-65 deg latitude band and (2) the coverage obtained for a given propagation time (7 days and 30 days). The first figure-of-merit is used for the radiometer as it has a sensor cone half-angle between 3 to 5 times bigger than the radars. Thus, we anticipate that for this instrument the period of the orbit (i.e. altitude) will be the main driver and that the 100% coverage value will be reached within less than a week. The second figure-of-merit is used for the radar instruments as they have small sensor cone half-angle and will, in some cases, never reach the 100% coverage threshold point.

Mailhe, Laurie