Search NASASearch

Engineering topics

Feinberg, Lee

Publications and source records attributed to Feinberg, Lee.

At least 19 records

Optical Engineering History of the James Webb Space Telescope (JWST)

Mission Objective: Study the origin and evolution of galaxies, stars and planetary systems; Optimized for infrared observations (0.6 to 28 microns). Organization: Mission Lead, Goddard Space Flight Center; International collaboration with ESA (European Space Agency) & CSA (Canadian Space Agency); Prime Contractor, Northrop Grumman Aerospace Systems; Telescope Subcontractors, Ball Aero-pace, Harris Corp, Orbital ATK. Instruments: Near Infrared Camera (NIRCam) - University of Arizona; Near Infrared Spectrograph (NIRSpec) - ESA; Mid-Infrared Instrument (MIRI) - JPL (Jet Propulsion Lab)/ESA; Fine Guidance Sensor (FGS) - CSA; Operations: Space Telescope Science Institute (STScI). Description: Deployable telescope with 6.5-meter-diameter segmented adjustable primary mirror; Cryogenic temperature telescope and instruments for infrared performance; 50 degrees Kelvin, minus 370 degrees Fahrenheit; 5-year science mission (10-year goal).

Feinberg, Lee

Breakthroughs in Picometer Ultra-Stable Spatial Metrology Systems for Next Generation Telescopes

Goal is to discover and characterize habitable planet candidates around Sun-like stars. Need 10(exp -10) contrast between reflected earth like planet and sun like stars. Options are internal Coronagraphs (LUVOIR and Habex) and large starshades (Habex) which each have pros and cons. Coronagraphs require 10(exp -10)contrast stability which means the primary mirror must be stable to roughly 10 picometers RMS wavefront over an exposure(minutes). Simplistically: Primary mirror instabilities of 10 picometers in certain spatial frequencies look like planets!

Feinberg, Lee

Sub-Picometer Dynamic Measurements of a Diffuse Surface

Future space observatory missions are forecasting the need for sensing and controlling wave front error and system alignment stability to picometer scale. Picometer stability performance demands precision knowledge of the mirror and metering structure materials to the same degree. A high-speed electronic speckle pattern interferometer was designed and built to demonstrate measurements of both static and dynamic responses of picometer amplitudes in materials of diffuse surface subjected to very low energy disturbances. This paper describes the details of a test to impart a dynamic disturbance of picometer scale and measure the response of a composite material.The results of the test are also reported and show conclusively that sub-picometer scale effects can be accurately measured in an open test environment outside a vacuum chamber.

Saif, Babak

Breaking the Cost Curve: Applying Lessons Learned from the James Webb Space Telescope Development

This paper looks at the key programmatic and technical drivers of the James Webb Space Telescope and assesses ways to building more cost-effective telescopes in the future. The paper evaluates the top level programmatics for JWST along with the key technical drivers from design through integration and testing. Actual data and metrics from JWST are studied to identify what ultimately drove cost on JWST. Finally, the paper assesses areas where applying lessons learned can reduce costs on future observatories and will provide better insights into critical areas to optimize for cost.

Feinberg, Lee

Thermal Model Performance for the James Webb Space Telescope OTIS Cryo-Vacuum Test

The James Webb Space Telescope (JWST), set to launch in early 2019, is currently undergoing a series of system-level environmental tests to verify its workmanship and end-to-end functionality. As part of this series, the Optical Telescope Element and Integrated Science Instrument Module (OTIS) Cryo-Vacuum (CV) test, the most complex cryogenic test executed to date by NASA, has recently been completed at the Johnson Space Center's Chamber A facility. The OTIS CV test was intended as a comprehensive test of the integrated instrument and telescope systems to fully understand its optical, structural, and thermal performance within its intended flight environment. Due to its complexity, extensive pre-test planning was required to ensure payload safety and compliance with all limits and constraints. A system-level pre-test thermal model was constructed which fully captured the behavior of the payload, ground support equipment, and surrounding test chamber. This thermal model simulated both the transient cooldown to and warmup from a 20K flight-like environment, as well as predicted the payload performance at cryo-stable conditions. The current work is a preliminary assessment of thermal model performance against actual payload response during the OTIS CV test. It examines both the benefits and shortcomings of assumptions made pre-test to simplify model execution when compared against test data. It explores in detail the role of temperature-dependent emissivities during transition to cryogenic temperatures, as well as the impact that model geometry simplifications have on tracking of critical hardware limits and constraints. This work concludes with a list of recommendations to improve the accuracy of thermal modeling for future large cryogenic tests. It is hoped that the insight gained from the OTIS CV test thermal modeling will benefit planning and execution for upcoming cryogenic missions.

JWST

JWST Lessons Learned

While there is a lot of focus on how a few key parameters like aperture size and pixel count drive costs of large space telescopes, the JWST experience suggests that a lot more insight is needed to understand and control costs.

Feinberg, Lee

Breaking the Cost Curve: Applying Lessons Learned from the James Webb Space Telescope Development to Build More Cost-Effective Large Space Telescopes in the Future

This paper looks at the key programmatic and technical drivers of the James Webb Space Telescope and assesses ways to building more cost-effective telescopes in the future. The paper evaluates the top level programmatics for JWST along with the key technical drivers from design through integration and testing. Actual data and metrics from JWST are studied to identify what ultimately drove cost on JWST. Finally, the paper assesses areas where applying lessons learned can reduce costs on future observatories and will provide better insights into critical areas to optimize for cost.

ATLAST

JWST Optical Telescope Element Center of Curvature Test

The James Webb Space Telescope (JWST) Optical Telescope Element (OTE) and Integrated Science Instrument Module (ISIM) completed element level integration and test programs and were integrated to the next level of assembly called OTE/ISIM (OTIS) at Goddard Space Flight Center (GSFC) in Greenbelt, Maryland in 2016. Before shipping the OTIS to Johnson Space Center (JSC) for optical test at cryogenic temperature a series of vibration and acoustic tests were performed. To help ensure that the OTIS was ready to be shipped to JSC an optical center of curvature (CoC) test was performed to measure changes in the mirror's optical performance to verify that the telescope's primary mirror was not adversely impacted by the environmental testing and help us in understanding potential anomalies identified during the JSC tests. The primary is a 6.5 meter diameter mirror consisting of 18 individual hexagonal segments. Each segment is an off-axis asphere. There are a total of three prescriptions repeated six times each. As part of the CoC test each segment was individually measured using a high-speed interferometer (HSI) designed and built specifically for this test. This interferometer is capable of characterizing both static and dynamic characteristics of the mirrors. The latter capability was used, with the aid of a vibration stinger applying a low-level input force, to measure the dynamic characteristic changes of the PM backplane structure. This paper describes the CoC test setup and both static and dynamic test results.

interferometer

Ultra-Stable Segmented Telescope Sensing and Control Architecture

The LUVOIR team is conducting two full architecture studies Architecture A 15 meter telescope that folds up in an 8.4m SLS Block 2 shroud is nearly complete. Architecture B 9.2 meter that uses an existing fairing size will begin study this Fall. This talk will summarize the ultra-stable architecture of the 15m segmented telescope including the basic requirements, the basic rationale for the architecture, the technologies employed, and the expected performance. This work builds on several dynamics and thermal studies performed for ATLAST segmented telescope configurations. The most important new element was an approach to actively control segments for segment to segment motions which will be discussed later.

Telescope

Ultra-Stable Segmented Telescope Sensing and Control Architecture

The LUVOIR team is conducting two full architecture studies. Architecture A - 15 meter telescope that folds up in an 8.4m SLS Block 2 shroud is nearly complete. Architecture B - 9.2 meter that uses an existing fairing size will begin study this Fall. This talk will summarize the ultra-stable architecture of the 15m segmented telescope including the basic requirements, the basic rationale for the architecture, the technologies employed, and the expected performance. This work builds on several dynamics and thermal studies performed for ATLAST segmented telescope configurations. The most important new element was an approach to actively control segments for segment to segment motions which will be discussed later.

Telescope

LUVOIR Tech Notes

We present nine "tech notes" prepared by the Large UV/Optical/Infrared (LUVOIR) Science and Technology Definition Team (STDT), Study Office, and Technology Working Group. These tech notes are intended to highlight technical challenges that represent boundaries in the trade space for developing the LUVOIR architecture that may impact the science objectives being developed by the STDT. These tech notes are intended to be high-level discussions of the technical challenges and will serve as starting points for more in-depth analysis as the LUVOIR study progresses.

large aperture

Path to a UV/Optical/IR Flagship: Review of ATLAST and Its Predecessors

Our recently completed study for the Advanced Technology Large-Aperture Space Telescope (ATLAST) was the culmination of three years of initially internally funded work that built upon earlier engineering designs, science objectives, and technology priorities. Beginning in the mid-1980s, multiple teams of astronomers, technologists, and engineers developed concepts for a large-aperture UV/optical/IR space observatory intended to follow the Hubble Space Telescope (HST). Here, we summarize since the first significant conferences on major post-HST ultraviolet, optical, and infrared (UVOIR) observatories the history of designs, scientific goals, key technology recommendations, and community workshops. Although the sophistication of science goals and the engineering designs both advanced over the past three decades, we note the remarkable constancy of major characteristics of large post-HST UVOIR concepts. As it has been a priority goal for NASA and science communities for a half-century, and has driven much of the technology priorities for major space observatories, we include the long history of concepts for searching for Earth-like worlds. We conclude with a capsule summary of our ATLAST reference designs developed by four partnering institutions over the past three years, which was initiated in 2013 to prepare for the 2020 National Academies' Decadal Survey.

exoplanets

James Webb Space Telescope Optical Telescope Element/Integrated Science Instrument Module (OTIS) Status

The James Webb Space Telescope Optical Telescope Element (OTE) and Integrated Science Instrument Module (ISIM) are integrated together to form the OTIS. Once integrated, the OTIS undergoes primary mirror center of curvature optical tests, electrical and operational tests, acoustics and vibration testing at the Goddard Space Flight Center before being shipped to the Johnson Space Center for cryogenic optical testing of the OTIS. In preparation for the cryogenic optical testing, the JWST project has built a Pathfinder telescope and has completed two Optical Ground System Equipment (OGSE) cryogenic optical tests with the Pathfinder. In this paper, we will summarize optical test results to date and status the final Pathfinder test and the OTIS integration and environmental test preparations

Feinberg, Lee

James Webb Space Telescope Optical Telescope Element Integrated Science Instrument Module (OTIS) Status

The James Webb Space Telescope Optical Telescope Element (OTE) and Integrated ScienceInstrument Module (ISIM)are integrated together to form the OTIS. Once integrated, the OTIS undergoes primary mirrorcenter of curvatureoptical tests, electrical and operational tests, acoustics and vibration testing at the Goddard SpaceFlight Center beforebeing shipped to the Johnson Space Center for cryogenic optical testing of the OTIS. In preparationfor the cryogenicoptical testing, the JWST project has built a Pathfinder telescope and has completed two OpticalGround SystemEquipment (OGSE) cryogenic optical tests with the Pathfinder. In this paper, we will summarize opticaltest results todate and status the final Pathfinder test and the OTIS integration and environmental test preparations

Feinberg, Lee

Initial Technology Assessment for the Large-Aperture UV-Optical-Infrared (LUVOIR) Mission Concept Study

The NASA Astrophysics Division's 30-Year Roadmap prioritized a future large-aperture space telescope operating in the ultra-violet/optical/infrared wavelength regime. The Association of Universities for Research in Astronomy envisioned a similar observatory, the High Definition Space Telescope. And a multi-institution group also studied the Advanced Technology Large Aperture Space Telescope. In all three cases, a broad science case is outlined, combining general astrophysics with the search for biosignatures via direct-imaging and spectroscopic characterization of habitable exoplanets. We present an initial technology assessment that enables such an observatory that is currently being studied for the 2020 Decadal Survey by the Large UV/Optical/Infrared (LUVOIR) surveyor Science and Technology Definition Team. We present here the technology prioritization for the 2016 technology cycle and define the required technology capabilities and current state-of-the-art performance. Current, planned, and recommended technology development efforts are also reported.

technology development