Fields, Keith

Publications and source records attributed to Fields, Keith.

Spacecraft Environmental Testing SMAP (Soil, Moisture, Active, Passive)

Testing a complete full up spacecraft to verify it will survive the environment, in which it will be exposed to during its mission, is a formidable task in itself. However, the ''test like you fly'' philosophy sometimes gets compromised because of cost, design and or time. This paper describes the thermal-vacuum and mass properties testing of the Soil Moisture Active Passive (SMAP) earth orbiting satellite. SMAP will provide global observations of soil moisture and freeze/thaw state (the hydrosphere state). SMAP hydrosphere state measurements will be used to enhance understanding of processes that link the water, energy, and carbon cycles, and to extend the capabilities of weather and climate prediction models. It will explain the problems encountered, and the solutions developed, which minimized the risk typically associated with such an arduous process. Also discussed, the future of testing on expensive long lead-time spacecraft. Will we ever reach the ''build and shoot" scenario with minimal or no verification testing?

thermal↗

Mass Property Measurements of the Mars Science Laboratory Rover

The NASA/JPL Mars Science Laboratory (MSL) spacecraft mass properties were measured on a spin balance table prior to launch. This paper discusses the requirements and issues encountered with the setup, qualification, and testing using the spin balance table, and the idiosyncrasies encountered with the test system. The final mass measurements were made in the Payload Hazardous Servicing Facility (PHSF) at Kennedy Space Center on the fully assembled and fueled spacecraft. This set of environmental tests required that the control system for the spin balance machine be at a remote location, which posed additional challenges to the operation of the machine

rover↗

The Certification of Environmental Chambers for Testing Flight Hardware

The JPL chamber certification process for ensuring that test chambers used to test flight hardware meet a minimum standard is critical to the safety of the hardware and personnel. Past history has demonstrated that this process is important due to the catastrophic incidents that could occur if the chamber is not set up correctly. Environmental testing is one of the last phases in the development of a subsystem, and it typically occurs just before integration of flight hardware into the fully assembled flight system. A seemingly insignificant -miscalculation or missed step can necessitate rebuilding or replacing a subsystem due to over-testing or damage from the test chamber. Conversely, under-testing might fail to detect weaknesses that might cause failure when the hardware is in service. This paper describes the process that identifies the many variables that comprise the testing scenario and screening of as built chambers, the training of qualified operators, and a general "what-to-look-for" in minimum standards.

Vacuum Chamber↗

The Certification of Environmental Chambers for Testing Flight Hardware

The JPL chamber certification process for ensuring that test chambers used to test flight hardware meet a minimum standard is critical to the safety of the hardware and personnel. Past history as demonstrated that this process is important due to the catastrophic incidents that could occur if the chamber is not set up correctly. Environmental testing is one of the last phases in the development of a subsystem, and it typically occurs just before integration of flight hardware into the fully assembled flight system. A seemingly insignificant -miscalculation or missed step can necessitate rebuilding or replacing a subsystem due to over-testing or damage from the test chamber. Conversely, under-testing might fail to detect weaknesses that might cause failure when the hardware is in service. This paper describes the process that identifies the many variables that comprise the testing scenario and screening of as built chambers, the training of qualified operators, and a general "what-to-look-for" in minimum standards.

Thermal↗