Search NASA⌕ Search

Engineering topics

Fisher, B.

Publications and source records attributed to Fisher, B..

27 records · Page 2

Climatological Processing and Product Development for the TRMM Ground Validation Program

The Tropical Rainfall Measuring Mission (TRMM) satellite was successfully launched in November 1997.The main purpose of TRMM is to sample tropical rainfall using the first active spaceborne precipitation radar. To validate TRMM satellite observations, a comprehensive Ground Validation (GV) Program has been implemented. The primary goal of TRMM GV is to provide basic validation of satellite-derived precipitation measurements over monthly climatologies for the following primary sites: Melbourne, FL; Houston, TX; Darwin, Australia- and Kwajalein Atoll, RMI As part of the TRMM GV effort, research analysts at NASA Goddard Space Flight Center (GSFC) generate standardized rainfall products using quality-controlled ground-based radar data from the four primary GV sites. This presentation will provide an overview of TRMM GV climatological processing and product generation. A description of the data flow between the primary GV sites, NASA GSFC, and the TRMM Science and Data Information System (TSDIS) will be presented. The radar quality control algorithm, which features eight adjustable height and reflectivity parameters, and its effect on monthly rainfall maps, will be described. The methodology used to create monthly, gauge-adjusted rainfall products for each primary site will also be summarized. The standardized monthly rainfall products are developed in discrete, modular steps with distinct intermediate products. A summary of recently reprocessed official GV rainfall products available for TRMM science users will be presented. Updated basic standardized product results involving monthly accumulation, Z-R relationship, and gauge statistics for each primary GV site will also be displayed.

Marks, D. A.↗

Rainfall Product Evaluation for the TRMM Ground Validation Program

Evaluation of the Tropical Rainfall Measuring Mission (TRMM) satellite observations is conducted through a comprehensive Ground Validation (GV) Program. Standardized instantaneous and monthly rainfall products are routinely generated using quality-controlled ground based radar data from four primary GV sites. As part of the TRMM GV program, effort is being made to evaluate these GV products and to determine the uncertainties of the rainfall estimates. The evaluation effort is based on comparison to rain gauge data. The variance between the gauge measurement and the true averaged rain amount within the radar pixel is a limiting factor in the evaluation process. While monthly estimates are relatively simple to evaluate, the evaluation of the instantaneous products are much more of a challenge. Scattegrams of point comparisons between radar and rain gauges are extremely noisy for several reasons (e.g. sample volume discrepancies, timing and navigation mismatches, variability of Z(sub e)-R relationships), and therefore useless for evaluating the estimates. Several alternative methods, such as the analysis of the distribution of rain volume by rain rate as derived from gauge intensities and from reflectivities above the gauge network will be presented. Alternative procedures to increase the accuracy of the estimates and to reduce their uncertainties also will be discussed.

Amitai, E.↗

The Atlas-Centaur 67 incident

The conditions leading to the breakup of the Atlas-Centaur 67 (AC-67) vehicle launched on March 26, 1987 during a typical winter-time storm are analyzed, and a most probable lightning strike scenario was developed based on inspection of the AC-67 debris, the AC-68 vehicle, and appropriate drawings, electrical diagrams, and photographs. It is shown that, during ascent, the vehicle encountered increasingly larger electric fields and flew through clouds that produced precipitation static on the vehicle, eventually triggering a cloud-to-ground lightning, comprised of at least four return strokes. The resulting lightning current coupled a signal into the wiring which goes to the AC-67 digital computer unit (DCU), effecting a single-word memory alteration and causing the DCU to issue a hardover engine gimbal command. This led to an excessive angle of attack, large dynamic loads, and the breakup of the AC-67.

Christian, H. J.↗

Electronic circuit delivers pulse of high interval stability

Circuit generates a pulse of high interval stability with a complexity level considerably below systems of comparable stability. This circuit is being used as a linear frequency discriminator in the signal conditioner of the Apollo command module.

Fisher, B.↗