Search NASASearch

Engineering topics

Fordyce, S. W.

Publications and source records attributed to Fordyce, S. W..

Study to forecast and determine characteristics of world satellite communications market

The world commercial communications satellite market during the spring and summer of 1983 was examined and characteristics and forecasts of the market extending to the year 2000 were developed. Past, present and planned satellites were documented in relation to frequencies, procurement and launch dates, costs, transponders, and prime contractor. Characteristics of the market are outlined for the periods 1965 - 1985, 1986 - 1989, and 1990 - 2000. Market share forecasts, discussions of potential competitors in various world markets, and profiles of major communication satellite manufacturing and user countries are documented.

Filep, R. T.

A figure of merit for competing communications satellite designs

Trends in launch schedules, weights, power, and space segment costs per transponder year for Intelsats and North American domsats (domestic communications satellites) are discussed. The Intelsat system currently services 25,000 point to point telephone links at any one moment, and a $3 billion order has been placed for Intelsat VIs, which feature 36,000 telephone circuits each. The Intelsat VI spacecraft will weigh 1670 kg in orbit, a continuance of the trend to heavier satellites, while the domsats will stay at 650 kg due to launch vehicle limitations. Direct television broadcast satellites are being designed for receive only (R/O) earth stations, with each satellite capable of servicing 50,000 individual ground stations. Competition is growing for C and Ku band satellite transponders for DBS, with costs $350,000 each. No standardized design has yet emerged.

Lovell, R. R.

Communications to 2000 - A forecast of the demand and capacity of U.S. domestic communications satellites

The market demand for the U.S. domestic communications satellites accelerated in the late 70's, exceeding the capacity of the satellites currently in orbit. Satellite carriers have been authorized to build an additional 24 domsats. This paper examines the anticipated market demands, and the capability of the domsats to fulfill these demands. With various practical technical innovations, the domsats appear able to meet the expected market demands until the end of this century.

Fordyce, S. W.

Applications of free-space microwave power transmission

Some applications and properties of free-space power transmission are examined. Among the properties discussed are: no mass, either in the form of wire conductors or ferrying vehicles, is needed between the source of energy and the point of consumption; energy can be transferred at the velocity of light; no loss of energy in transferring energy throught the vacuum of space; and the energy transfer is insensitive to a difference in the gravitational potential of the transmitter and receiver locations. Applications discussed include the Solar Power Satellite, high altitude platforms for communications and remote sensing. Also discussed are rectennas and retrodirective arrays. Finally, an expression yielding minimum cost is presented.

Fordyce, S. W.

Communications payloads for geostationary platforms

Trends in communication satellites show increasing reuse of the frequency spectrum through multiple spot beams and orthogonal polarization, as well as consortia operation. Current reliance on orbital arc separation for frequency reuse may be inadequate for the projected traffic growth and the orbital slotting proposals before the ITU. This paper notes that cost advantages can accrue through common use of spacecraft subsystems and multiple users' platforms aboard a common geostationary platform. The rationale for such platforms is described and potential payloads are suggested.

Fordyce, S. W.

Switchboard in the sky

Geostationary parking orbits for the present generation of communications satellites, e.g., Intelsat, Westar, Molniya, Navsat, etc., are becoming crowded. It is noted that the C-band over North America will in future be subject to still less attenuation with the introduction of smaller (4.5 m) antennas for earth-bound receive-only applications. It is suggested, at least for the present, that more bands be added, e.g., K-, Ku-, and S-bands. To handle the potential market for communications satellite services during the years after 1985, much larger facilities will be needed. The fabrication of large platforms using the STS is discussed as the most practical solution, stressing that virtually every geosynchronous communications antenna for U.S. domestic use can be assembled on one platform positioned at an especially favorable location.

Fordyce, S. W.

NASA teleconferencing pilot project - An evaluation of teleconferencing as a substitute for travel

NASA conducted a Pilot Project during 1975-1976 to determine the extent to which teleconferencing could replace travel to meetings. The network consisted of approximately 34 teleconference rooms and 50 fast facsimile machines, all interconnected on private lines to a master switchboard in Huntsville, Alabama. In addition, portable conference telephones augmented the voice network and experimental video conferences were attempted. Evaluations showed that the teleconferences saved travel costs approximating 21% of the travel budget at a communications cost of 3% of this budget.

Fordyce, S. W.

NASA teleconference pilot project evaluation for 1975

Tabular data were given to summarize the results of the NASA teleconferencing network pilot project for 1975. The 1,241 evaluation reports received indicate that almost 100,000 man-hours of teleconferences took place. The travel funds reported saved total about $1.44 million, which is about 10% of the NASA travel costs. Subtracting the cost of providing the teleconferencing networks, the net savings reported are $1.28 million (about 9% of the travel costs). The teleconferencing network has proved to be successful in conducting many management meetings and reviews within NASA and its contractors. In spite of difficulties caused by inexperience in teleconferencing and some equipment and circuit problems, the evaluation reports indicated the system was satisfactory in an overwhelming majority of cases.

Fordyce, S. W.