Search NASA⌕ Search

Engineering topics

Forman, B. J.

Publications and source records attributed to Forman, B. J..

A multiple beam antenna concept for a 30/20 GHz satellite communications system

Design and operational performance features of a NASA planned 30/30 GHz flight experiment communications system multiple-beam antenna (MBA) are described. The MBA is a shared aperture offset Cassegrain type with a main reflector diameter of 3 m and physically separated transmit and receive feeds. A planar frequency selective surface is employed which is transmissive to the receive signals and reflective to the transmit signals. Trade-offs and constraints in the MBA feed design are explored, noting the higher feed loss and complexity due to choosing variable power dividers for the beam forming network. Doublet beam coverage of the east coast of the continental U.S. is shown to be possible with a triangular lattice array of feed horns with aperture diameters and element spacings of two wavelengths. The doublet configuration requires ten times the components as a singlet array.

Forman, B. J.↗

The 30/20 GHz flight experiment system, phase 2. Volume 1: Executive summary

Summary information on the final communication system design, communication payload, space vehicle, and development plan for the 30/20 GHz flight experiment will be installed on the LEASAT spacecraft which will be placed into orbit from the space shuttle cargo bay. The communication concept has two parts: a truck service and a customer premise service (CPS). The trucking system serves four spot beams which are interconnected in a satellite switched time division multiple access mode by an IF switch matrix. The CPS covers two large areas of the eastern United States with a pair of scanning beams.

Bronstein, L.↗

The 30/20 GHz flight experiment system, phase 2. Volume 2: Experiment system description

A detailed technical description of the 30/20 GHz flight experiment system is presented. The overall communication system is described with performance analyses, communication operations, and experiment plans. Hardware descriptions of the payload are given with the tradeoff studies that led to the final design. The spacecraft bus which carries the payload is discussed and its interface with the launch vehicle system is described. Finally, the hardwares and the operations of the terrestrial segment are presented.

Bronstein, L.↗

The 30/20 GHz flight experiment system, phase 2. Volume 4: Experiment system development plan

The development plan for the 30/20 GHz flight experiment system is presented. A master program schedule with detailed development plans for each subsystem is planned with careful attention given to how technology items to ensure a minimal risk. The work breakdown structure shows the organization of the program management with detailed task definitions. The ROM costs based on the development plan are also given.

Bronstein, L.↗