Qualification testing for a central station
Qualification testing for a Central Station Photovoltaic (PV) Facility depends to a great extent on the system design, (fixed versus tracking), and the level of data acquisition/control which is incorporated into the system. The basic elements which require qualification tests include: dc power production/collection; tracker conversion systems; ac utility interface; system level control; and data acquisition/reporting. The qualification tests from the Lungo (ARCO) 1 MW Facility which were completed in January 1983 are discussed. The philosophy and many of the procedures are applicable to any central station PV facility.
Forrester, D. L.↗