Options for Achieving Cost Reduction in Advanced Reactors through Open Architecture
A key contributor to high capital costs and schedule overruns for new nuclear power plants is lack of standardization, driven by site-specific customization and construction of multiple designs by competing vendors rather than commitment to a single standardized program. While advanced reactor vendors typically individually target repeat construction of standardized units, the many competing designs could exacerbate the problem. “Open Architecture”, the open specification of requirements and interfaces for structures, systems and components (SSCs), has been proposed as a means of promoting standardization, by facilitating existing non-nuclear suppliers to enter the industry and/or allowing SSCs to be configured for more than one reactor within the same technology type. Contracting mechanisms that facilitate information sharing and alignment of incentives between stakeholders may complement such an approach. A preliminary scheme is presented for selection of SSCs for which such strategies could be adopted, based on a vendor make/buy decision model and stakeholder interviews. SSCs are categorized according to number of suppliers and their contribution to the reactor’s competitive edge. SSCs with many potential suppliers and a high contribution to competitive edge may be attractive for widening the supply chain via open specification of system requirements and interfaces, e.g., SSCs in the power island. SSCs with few suppliers and low contribution to competitive edge may be potential avenues for common system specification between vendors, e.g., some of the auxiliary SSCs. Potential cost reductions from such strategies will depend upon the size of the build program and the reactor type.