Search NASA⌕ Search

Engineering topics

Fradeneck, Austen David

Publications and source records attributed to Fradeneck, Austen David.

Progress on Pu-238 production at Idaho National Laboratory from February 2022 to July 2023

Idaho National Laboratory (INL) has continued to qualify irradiation positions in the Advanced Test Reactor (ATR) for Pu-238 production to support NASA deep space missions. Over the past year, INL qualified Np-237 targets for ATR’s North East Flux Trap (NEFT), Inner-A and H positions. Work has begun to requalify the South Flux Trap (SFT) and to qualify the East Flux Trap (EFT) for the ATR GEN I target and is midway through the qualification process. This paper gives an overview of operational and technical activities from February 2022 to July 2023.

07 ISOTOPE AND RADIATION SOURCES↗

Pu-238 Production At Idaho National Laboratory

Overview of INL's work on Pu-238 production presented to MFC Strategic Advisory Council (SAC). Discusses program status, upcoming work, and future planned activities.

07 ISOTOPE AND RADIATION SOURCES↗

Pu-238 Production Progress at INL From December 2022 to December 2023

Idaho National Laboratory (INL) has an ongoing effort to produce Pu-238 for NASA deep space missions. Recent work at INL has consisted of irradiation of Pu 238 production targets in the Advanced Test Reactor (ATR), generating more than an estimated 400 grams of Pu-238 heat source material between March and October 2023. Additionally, INL began qualifying Pu-238 production targets with a higher loading of Np-237 to further increase the production of Pu-238 production in later years. INL has also updated the analysis as a result of operational changes at ATR. One instance was updating the analysis to enable a single Pu-238 production target to be run in ATR’s South Flux Trap (SFT), rather than the previous seven production targets, to make use of a spare target from a discontinued design. Higher lobe powers in ATR were also analyzed due to potential changes in planned lobe powers.

07 ISOTOPE AND RADIATION SOURCES↗

Process Improvements For Pu-238 Production at Idaho National Laboratory

Idaho National Laboratory (INL) has supported the production of Pu-238 for future NASA deep space missions since 2017. Over this time, INL has worked to improve the qualification process of Pu-238 production targets as well as improve processes related to the shipping, storage, irradiation, and storage of Pu-238 production targets. Qualification of Pu-238 production targets began with flux measurements and scoping analysis to provide fundamental data to confirm the impacts on the operation of the Advanced Test Reactor (ATR), Fig1. Later, initial production targets were irradiated in ATR’s I-7 position, and then the South Flux Trap (SFT). A modified target design was then implemented which would use the full length of the ATR core and increase Pu-238 production. While working to improve and streamline the qualification of the Pu-238 production targets, INL worked to improve multiple operational aspects of the Pu-238 production process. These changes include updating procedures to streamline operations, supporting modification of shipping containers to contain five rather than one production target, reviewing target receipt procedures and changing work flow to provide flexibility in target receipt, and designing and fabricating support equipment for the storage and internal transfer of production targets.

07 ISOTOPE AND RADIATION SOURCES↗

Pu-238 Production Progress at Idaho National Laboratory From December 2022 to December 2023

Idaho National Laboratory (INL) has an ongoing effort to produce Pu-238 for NASA deep space missions. Recent work at INL has consisted of irradiation of Pu 238 production targets in the Advanced Test Reactor (ATR), generating more than an estimated 400 grams of Pu-238 heat source material between March and October 2023. Additionally, INL began qualifying Pu-238 production targets with a higher loading of Np-237 to further increase the production of Pu-238 production in later years. INL has also updated the analysis as a result of operational changes at ATR. One instance was updating the analysis to enable a single Pu-238 production target to be run in ATR’s South Flux Trap (SFT), rather than the previous seven production targets, to make use of a spare target from a discontinued design. Higher lobe powers in ATR were also analyzed due to potential changes in planned lobe powers.

07 ISOTOPE AND RADIATION SOURCES↗

Process Improvement For Pu-238 Production at Idaho National Laboratory

Idaho National Laboratory (INL) has supported the production of Pu-238 for future NASA deep space missions since 2017. Over this time, INL has worked to improve the qualification process of Pu-238 production targets as well as improve processes related to the shipping, storage, irradiation, and storage of Pu-238 production targets. Qualification of Pu-238 production targets began with flux measurements and scoping analysis to provide fundamental data to confirm the impacts on the operation of the Advanced Test Reactor (ATR), Fig1. Later, initial production targets were irradiated in ATR’s I-7 position, and then the South Flux Trap (SFT). A modified target design was then implemented which would use the full length of the ATR core and increase Pu-238 production. While working to improve and streamline the qualification of the Pu-238 production targets, INL worked to improve multiple operational aspects of the Pu-238 production process. These changes include updating procedures to streamline operations, supporting modification of shipping containers to contain five rather than one production target, reviewing target receipt procedures and changing work flow to provide flexibility in target receipt, and designing and fabricating support equipment for the storage and internal transfer of production targets

07 ISOTOPE AND RADIATION SOURCES↗

Demonstrate Viability of Accelerated Fuel Qualification Approaches

This presentation summarizes the research under LDRD grogram, Demonstrate Viability of Accelerated Fuel Qualification Approaches. It is demonstrated that the fabrication process of uranium carbide fuel has been developed and neutronic, thermal and hydraulic analysis have been conducted for the Fission Accelerated Steady-state Testing (FAST). This program provides basis of expansion of FAST as an efficient platform to broad nuclear fuels.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

BRR Cask Use for Pu-238 Isotope Production

The Department of Energy (DOE), in partnership with its national laboratories and the National Aeronautics and Space Administration (NASA), is responsible to produce Pu-238 isotope in the United States for use in space exploration. Major activities in the DOE complex are focused at Idaho National Laboratory (INL) and Oak Ridge National Laboratory (ORNL). INL is responsible for storing Np-237 feedstock, irradiation qualification in the Advanced Test Reactor (ATR), and irradiating targets containing Np-237 to produce Pu-238. ORNL is responsible for target design, target fabrication, irradiation qualification in HFIR, and processing of targets to extract Pu-238 heat source material. A key part of the program lifecycle is moving irradiated targets from INL to ORNL. The BEA Research Reactor (BRR) cask was identified as a potential shipping cask for the transport of both unirradiated and irradiated targets between the project sites. This paper will discuss the production at INL and shipment of Pu-238 to ORNL using the BRR cask.

07 ISOTOPE AND RADIATION SOURCES↗

BRR Cask Use for Pu-238 Isotope Production

US Department of Energy (DOE), in partnership with the National Aeronautics and Space Administration (NASA), needs to produce Pu-238 for space exploration Major activities are focused at Idaho National Laboratory (INL) and Oak Ridge National Laboratory (ORNL) Key part of program is movement of targets between INL and ORNL BEA Research Reactor (BRR) package licensed for transport of unirradiated and irradiated targets

42 ENGINEERING↗

Progress on Pu-238 Production at Idaho National Laboratory From February 2022 to December 2022

Idaho National Laboratory (INL) has continued to qualify irradiation positions in the Advanced Test Reactor (ATR) for Pu-238 production to support NASA deep space missions. Over the past year, INL qualified Np-237 targets for ATR’s North East Flux Trap (NEFT), inner A, and H positions. Work has begun to requalify the South Flux Trap (SFT) and qualify the East Flux Trap (EFT) for the ATR GEN I target and is midway through the qualification process. This paper gives an overview of operational and technical activities from February 2022 to December 2022.

07 ISOTOPE AND RADIATION SOURCES↗

Progress on Pu-238 Production at INL From February 2022 to December 2022

Idaho National Laboratory (INL) has continued to qualify irradiation positions in the Advanced Test Reactor (ATR) for Pu-238 production to support NASA deep space missions. Over the past year, INL qualified Np-237 targets for ATR’s North East Flux Trap (NEFT), inner A, and H positions. Work has begun to requalify the South Flux Trap (SFT) and qualify the East Flux Trap (EFT) for the ATR GEN I target and is midway through the qualification process. This paper gives an overview of operational and technical activities from February 2022 to December 2022.

07 ISOTOPE AND RADIATION SOURCES↗

Progress on Pu-238 Production at INL From March 2021 to February 2022

Idaho National Laboratory has completed irradiation of Np-237 targets in the Advanced Test Reactor’s (ATR) South Flux Trap (SFT) and I-7 positions. INL also progressed qualification of new ATR Gen 1 Np-237 targets for the North East Flux Trap (NEFT), inner A, and H positions. This slide show is based upon artifact INL/CON-22-65729-Rev000 and gives an overview of operational and technical activities from March 2021 to February 2022.

07 ISOTOPE AND RADIATION SOURCES↗

Progress on Pu-238 Production at Idaho National Laboratory From March 2021 to February 2022

Idaho National Laboratory has completed irradiation of Np-237 targets in the Advanced Test Reactor’s (ATR) South Flux Trap (SFT) and I-7 positions. INL also progressed qualification of new ATR Gen 1 Np-237 targets for the North East Flux Trap (NEFT), inner A, and H positions. This paper gives an overview of operational and technical activities from March 2021 to February 2022.

07 ISOTOPE AND RADIATION SOURCES↗