Search NASA⌕ Search

Engineering topics

Freshley, Mark

Publications and source records attributed to Freshley, Mark.

Coupling Big Data Analytics and Reactive Transport Modeling for Cost-effective Groundwater Monitoring - 17163

This study presents an innovative approach for sustainable and cost-effective groundwater monitoring. This approach takes advantage of recent advances in various technologies: (1) in situ autonomous sensors, (2) big data analytics, and (3) parallel high-performance computing for flow and reactive transport modeling. In situ sensors are used to periodically measure the key variables (such as pH, redox potential, electrical conductivity, and groundwater level), which control contaminant mobility and the plume spatial and temporal distribution. Based on a limited number of groundwater sampling, the data analytics methods-data mining and machine learning-allow us to identify and quantify the correlations between the in situ-measured variables and contaminant concentrations, and also to detect significant changes associated with the plume mobility. In addition, a state-of-the-art parallel numerical flow and reactive transport simulator Amanzi, and uncertainty quantification software Agni are used to provide an improved physical and mechanistic understanding of the contaminated groundwater system behavior, and to predict the long-term plume distribution for optimizing and adapting the monitoring strategy. Amanzi and Agni were developed as part of the Advanced Simulation Capability for Environmental Management (ASCEM) program of the DOE Office of Environmental Management. Such modeling is critical, particularly, for assessing the impact of climate change and associated hydrological shifts. The developed approach is expected to significantly reduce the groundwater sampling frequency and associated cost. In addition, the real-time information on plume mobility serves as an early warning system, improving the resiliency of contaminated or potentially contaminated sites. We demonstrate this approach using as an example the Savannah River Site (SRS) F-Area, where groundwater is contaminated by various radionuclides, including uranium, tritium and technetium. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Applications Of The Advanced Simulation Capability For Environmental Management (ASCEM) - 17253

Three applications were completed using the Advanced Simulation Capability for Environmental Management (ASCEM), supported by the U.S. Department of Energy's Office of Environmental Management. These analyses were performed for the Savannah River Site (SRS) F-Area, the Los Alamos National Laboratory (LANL) Site, and the Nevada National Security Site (NNSS). At the SRS F-Area, ASCEM simulations were used to help develop cost-effective, long-term monitoring approaches for science-based site closure and management. The simulation results were used to develop a mechanistic understanding of correlations between contaminant concentrations and master variables that can be used for monitoring. At LANL, the ASCEM simulator Amanzi was integrated with a LANL-based decision support tool for the LANL onsite program. A saturated-zone site model focused on a key area of interest was developed and calibrated to measured data. This model was applied to quantify uncertainty and provide decision support to inform chromium remediation efforts. To support assessment of groundwater contamination at NNSS, ASCEM was used to calibrate hydrologic properties and flow directions using water levels observed under steady-state conditions and during four different pump tests on Pahute Mesa. The flow fields generated from these pump tests will be used to simulate transport pathways from underground nuclear tests to compare with field observations and to test alternative conceptual models of transport, which will ultimately facilitate better placement of monitoring wells. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Technetium Management Program Plan - 17376

Technetium management is a high-priority activity for the U.S. Department of Energy (DOE) Office of Environmental Management (EM) complex. Waste management and remediation issues involving technetium represent environmental risks and challenges that are unique to DOE. This plan lays out the technology development activities that are underway as well as future technology needs to address technetium issues across DOE EM sites and across programmatic areas of tank waste, groundwater and soils, and facility decommissioning and deactivation in order to be comprehensive and to allow integration of similar activities. The program was developed in close coordination with site representatives and program offices. Activities and needs that were identified share common themes and were grouped into areas of characterization, treatment, and disposition. Characterization includes understanding the inventory at particular locations, the chemical species, and chemical and physical behavior, whether in a treatment process flowsheet or a geological setting that displays periodic contaminant releases. The tools for characterization in these different environments might use the same sensors or protocols. Treatment options include methods to capture technetium such as ion-exchange or manipulation of oxidation states, which also may be applied across program areas. Disposition includes end-points of the processes and environmental risk, including waste form behavior, mobility of technetium once it is treated or remediated, and long-term monitoring. Disposition represents integration of all cleanup actions at a site. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗