Search NASA⌕ Search

Engineering topics

Frisch, Josef

Publications and source records attributed to Frisch, Josef.

Status and future plans for C 3 R&D

C 3 is an opportunity to realize an e + e - collider for the study of the Higgs boson at √s = 250 GeV, with a well defined upgrade path to 550 GeV while staying on the same short facility footprint. C 3 is based on a fundamentally new approach to normal conducting linear accelerators that achieves both high gradient and high efficiency at relatively low cost. Given the advanced state of linear collider designs, the key system that requires technical maturation for C 3 is the main linac. This paper presents the staged approach towards a facility to demonstrate C 3 technology with both Direct (source and main linac) and Parallel (beam delivery, damping ring, ancillary component) R&D. The primary goal of the C 3 Demonstration R&D Plan is to reduce technical and cost risk by building and operating the key components of C 3 at an adequate scale. This R&D plan starts with the engineering design, and demonstration of one cryomodule and will culminate in the construction of a 3 cryomodule linac with pre-production prototypes. This R&D program would also demonstrate the linac rf fundamentals including achievable gradient and gradient stability over a full electron bunch train and breakdown rates. It will also investigate beam dynamics including energy spread, wakefields, and emittance growth. This work will be critical to confirm the suitability of the C 3 beam parameters for the physics reach and detector performance in preparation for a Conceptual Design Report (CDR), as well as for follow-on technology development and industrialization. The C 3 Demonstration R&D Plan will open up significant new scientific and technical opportunities based on development of high-gradient and high-efficiency accelerator technology. It will push this technology to operate both at the GeV scale and mature the technology to be reliable and provide high-brightness electron beams. The timeline for progressing with C 3 technology development will be governed by practical limitations on both the technical progress and resource availability. It consists of four stages: Stage 0) Ongoing fundamental R&D on structure prototypes, damping and vibrations. Stage 1) Advancing the engineering maturity of the design and developing start-to-end simulations including space-charge and wakefield effects. This stage will include testing of strucutres operating at cryogenic temperatures. Beam tests would be performed with high beam current to test full beam loading. Stage 2) Production and testing of the first cryomodule at cryogenic temperatures. This would provide sufficient experimental data to compile a CDR and it is anticipated for Stage 2 to last 3 years and to culminate with the transport of photo-electrons through the first cryomodule. Stage 3) Updates to the engineering design of the cryomodules, production of the second and third cryomodule and their installation. Lower charge and lower emittance beams will be used to investigate emittance growth. The successful full demonstration of the 3 cryomodules to deliver up to a 3 GeV beam and achieve the C 3 five gradient will allow a comprehensive and robust evaluation of the technical design of C 3 as well as mitigate technical, schedule, and cost risks required to proceed with a Technical Design Report (TDR).

radiation hardened magnets↗

High Efficiency, Low Cost RF Sources for Accelerators and Colliders

Calabazas Creek Research, Inc. (CCR) and its collaborators are developing high efficiency, low cost RF sources. Phase and Amplitude Controlled Magnetrons: CCR, Fermilab, and Communications & Power Industries, LLC (CPI) recently developed a 100 kW, 1.3 GHz magnetron system with amplitude and phase control. The system operated at more than 80% efficiency and demonstrated rapid control of amplitude and phase. Multiple Beam Triodes: CCR, in collaboration with CPI and JP Accelerator Works, Inc., is developing 200 kW, pulsed and CW RF sources from 350 to 700 MHz with projected efficiencies exceeding 80% and cost of $0.50/Watt. Prototype tubes are scheduled for tests in spring 2021. High Efficiency Klystrons:CCR, CPI, and Leidos, Inc. are building a 1.3 GHz, 100 kW klystron operating at 80% efficiency. High power testing is scheduled for summer 2021. Multiple Beam IOTs: CCR and Georgia Tech Research Institute are developing MBIOTs with simplified input coupling and high efficiency. Simulations indicate that 3rd harmonic drive power can increase the efficiency 8-10 %. The program is developing a prototype tube to produce 200 kW peak, 100 kW average power at 704 MHz.

43 PARTICLE ACCELERATORS↗