Development of Principal Design Criteria of the Fast Modular Reactor
General Atomics Electromagnetic Systems (GA-EMS) is developing a 50-megawatt electric (MWe) helium-cooled Fast Modular Reactor (FMR). The project has been selected by the U.S. Department of Energy (DOE) for Advanced Reactor Concepts-20 (ARC-20). The long-term goal of the project is to design, license, and commercialize the FMR plant by the mid-2030s. Early engagement with the U.S. Nuclear Regulatory Commission (NRC) is an important step for the developers to license the advanced reactors including the FMR. As an effort to support the design and the preapplication regulatory engagement plan, GA-EMS is developing Principal Design Criteria (PDC) applicable to the FMR design.