FRIB Beam Power Ramp-up: Status and Plans

After project completion on scope, on cost, and ahead of schedule, the Facility for Rare Isotope Beams began operations for scientific users in May of 2022. The ramp-up to a beam power of 400 kW is planned over a six-year period; 1 kW was delivered for initial user runs from in 2022, and 5 kW was delivered as of February 2023. Test runs with 10 kW 36Ar and 48Ca beams were conducted in July 2023. Upgrade plans include doubling the primary-beam energy to 400 MeV/nucleon for enhanced discovery potential (¿FRIB 400¿). This talk reports on the strategic plans towards high power operations emphasizing challenges and resolutions in beam-interception devices and targetry systems, radiation protection and controls, and legacy system renovation and integration.

43 PARTICLE ACCELERATORS↗

Observation of New Isotopes in the Fragmentation of Pt 198 at FRIB

Five previously unknown isotopes ( 182,183 Tm, 186,187 Yb, 190 Lu) were produced, separated, and identified for the first time at the Facility for Rare Isotope Beams (FRIB) using the Advanced Rare Isotope Separator (ARIS). The new isotopes were formed through the interaction of a 198 Pt beam with a carbon target at an energy of 186 MeV/u and with a primary beam power of 1.5 kW. Event-by-event particle identification of A, Z, and q for the reaction products was performed by combining measurements of the energy loss, time of flight, magnetic rigidity Bρ, and total kinetic energy. The ARIS separator has a novel two-stage design with high resolving power to strongly suppress contaminant beams. Finally, this successful new isotope search was performed less than one year after FRIB operations began and demonstrates the discovery potential of the facility which will ultimately provide 400 kW of primary beam power.

07 ISOTOPE AND RADIATION SOURCES↗

FRIB Transition to User Operations, Power Ramp Up, and Upgrade Perspectives

After project completion on scope, on cost, and ahead of schedule, the Facility for Rare Isotope Beams began operations for scientific users in May of 2022. During the first 12 months of user operations, the FRIB accelerator complex delivered 5250 beam hours, including 1528 hours to nine science experiments conducted with primary beams of 36Ar, 48Ca, 70Zn, 82Se, 124Xe, and 198Pt at beam energies >200 MeV/u; 2724 hours for beam developments, studies, and tuning; and 998 hours to industrial users and non-scientific programs using the FRIB Single Event Effect (FSEE) beam line. The ramp-up to a beam power of 400 kW is planned over a six-year period; 1 kW was delivered for initial user runs from in 2022, and 5 kW was delivered as of February 2023. Upgrade plans include doubling the primary-beam energy to 400 MeV/nucleon for enhanced discovery potential (¿FRIB 400¿). This talk reports on FRIB status and progress since SRF2021, emphasizing lessons learned during the transition from beam commissioning to machine operations, challenges and resolutions for the power ramp-up, progress with accelerator improvements, and R&D for the energy upgrade.

43 PARTICLE ACCELERATORS↗