Integrated Testing of a Membrane CO 2 Capture Process with a Coal-Fired Boiler
This final technical report describes work conducted by Membrane Technology and Research, Inc. (MTR) for the Department of Energy, National Energy Technology Laboratory (DOE NETL) to demonstrate integrated operation of the MTR small pilot membrane CO 2 capture system with Babcock & Wilcox Enterprises, Inc.’s (B&W) Small Boiler Simulator-II (SBS-II) pilot coal boiler (award number DE-FE0026414). The work was performed from July 1, 2015 through March 31, 2018. The overall goal of this project was to operate the existing MTR small pilot membrane CO 2 capture system at an appropriately-sized coal-fired boiler to test integrated operation with CO 2 recycle to the boiler. MTR was assisted in this project by B&W, which hosted the integrated membrane-boiler field test at the B&W Research Facility in Barberton, OH. This report details the work performed to prepare the B&W site, modify the existing MTR membrane system, install the MTR system at B&W, and operate an integrated membrane-boiler field test with CO 2 recycle to the boiler. Detailed analysis of the integrated membrane-boiler test data was conducted to validate prior B&W computational fluid dynamics (CFD) modeling and SBS-II boiler tests with CO 2 -laden air that showed modest effects of recycled CO 2 on boiler performance. The integrated test results also demonstrated how various membrane parameters impact the performance of a dynamic boiler system. Key results for all tasks and recommendations for future research are discussed in this report.