Multiple delivery cesium oven system for negative ion sources

Distribution of cesium in large negative ion beam sources to be operational in ITER, is presently based on the use of three or more cesium ovens, which operate simultaneously and are controlled remotely. However, use of multiple Cs ovens simultaneously is likely to pose difficulties in operation and maintenance of the ovens. An alternate method of Cs delivery, based on a single oven distribution system is proposed as one which could reduce the need of simultaneous operation of many ovens. A proof of principle experiment verifying the concept of a multinozzle distributor based Cs oven has been carried out at Institute for Plasma Research. It is also observed that the Cs flux is not controlled by Cs reservoir temperature after few hours of operation but by the temperature of the distributor which starts behaving as a Cs reservoir.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

RF-Plasma Source Commissioning in Indian Negative Ion Facility

The Indian program of the RF based negative ion source has started off with the commissioning of ROBIN, the inductively coupled RF based negative ion source facility under establishment at Institute for Plasma research (IPR), India. The facility is being developed under a technology transfer agreement with IPP Garching. It consists of a single RF driver based beam source (BATMAN replica) coupled to a 100 kW, 1 MHz RF generator with a self excited oscillator, through a matching network, for plasma production and ion extraction and acceleration. The delivery of the RF generator and the RF plasma source without the accelerator, has enabled initiation of plasma production experiments. The recent experimental campaign has established the matching circuit parameters that result in plasma production with density in the range of 0.5-1x10{sup 18}/m{sup 3}, at operational gas pressures ranging between 0.4-1 Pa. Various configurations of the matching network have been experimented upon to obtain a stable operation of the set up for RF powers ranging between 25-85 kW and pulse lengths ranging between 4-20 s. It has been observed that the range of the parameters of the matching circuit, over which the frequency of the power supply is stable, is narrow and further experiments with increased number of turns in the coil are in the pipeline to see if the range can be widened. In this paper, the description of the experimental system and the commissioning data related to the optimisation of the various parameters of the matching network, to obtain stable plasma of required density, are presented and discussed.

43 PARTICLE ACCELERATORS↗

Cesium Delivery System for Negative Ion Source at IPR

The technique of surface production of negative ions using cesium, Cs, has been efficiently exploited over the years for producing negative ion beams with increased current densities from negative ion sources used on neutral beam lines. Deposition of Cs on the source walls and the plasma grid lowers the work function and therefore enables a higher yield of H{sup -}, when hydrogen particles (H and/or H{sub x}{sup +}) strike these surfaces.A single driver RF based (100 kW, 1 MHz) negative ion source test bed, ROBIN, is being set up at IPR under a technical collaboration between IPR and IPP, Germany. The optimization of the Cs oven design to be used on this facility as well as multidriver sources is underway. The characterization experiments of such a Cs delivery system with a 1 g Cs inventory have been carried out using surface ionization technique. The experiments have been carried by delivering Cs into a vacuum chamber without plasma. The linear motion of the surface ionization detector, SID, attached with a linear motion feedthrough allows measuring the angular distribution of the Cs coming out of the oven. Based on the experimental results, a Cs oven for ROBIN has been proposed. The Cs oven design and experimental results of the prototype Cs oven are reported and discussed in the paper.

43 PARTICLE ACCELERATORS↗

Conceptual Design, Implementation and Commissioning of Data Acquisition and Control System for Negative Ion Source at IPR

Negative ion Experimental facility has been setup at IPR. The facility consists of a RF based negative ion source (ROBIN)--procured under a license agreement with IPP Garching, as a replica of BATMAN, presently operating in IPP, 100 kW 1 MHz RF generators and a set of low and high voltage power supplies, vacuum system and diagnostics. 35 keV 10A H- beam is expected from this setup. Automated successful operation of the system requires an advanced, rugged, time proven and flexible control system. Further the data generated in the experimental phase needs to be acquired, monitored and analyzed to verify and judge the system performance. In the present test bed, this is done using a combination of PLC based control system and a PXI based data acquisition system. The control system consists of three different Siemens PLC systems viz. (1) S-7 400 PLC as a Master Control, (2) S-7 300 PLC for Vacuum system control and (3) C-7 PLC for RF generator control. Master control PLC directly controls all the subsystems except the Vacuum system and RF generator. The Vacuum system and RF generator have their own dedicated PLCs (S-7 300 and C-7 respectively). Further, these two PLC systems work as a slave for the Master control PLC system. Communication between PLC S-7 400, S-7 300 and central control room computer is done through Industrial Ethernet (IE). Control program and GUI are developed in Siemens Step-7 PLC programming software and Wincc SCADA software, respectively. There are approximately 150 analog and 200 digital control and monitoring signals required to perform complete closed loop control of the system. Since the source floats at high potential ({approx}35 kV); a combination of galvanic and fiber optic isolation has been implemented. PXI based Data Acquisition system (DAS) is a combination of PXI RT (Real time) system, front end signal conditioning electronics, host system and DAQ program. All the acquisition signals coming from various sub-systems are connected and acquired by the PXI RT system, through only fiber optics link for signal conditioning, electrical isolation and better noise immunity. Real time and Host application programs are developed in LabVIEW and the data shall be stored with a facility of online display of selected parameters. Mathematical calculations and report generation will take place at the end of each beam shot. The paper describes in detail about the design approach, implementation strategy, program development, commissioning and operational test result of ROBIN through a data acquisition and control system.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗